  • National Bridge Inventory (NBI) Statistics
  • 115Number of bridges
  • 1,699ft / 518mTotal length
  • $207,586,000Total costs
  • 1,138,270Total average daily traffic
  • 80,239Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for LaGrange
  • No street view available for this location

New bridges in LaGrange, GA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21930-1939
  • 31940-1949
  • 21950-1959
  • 141960-1969
  • 381970-1979
  • 101980-1989
  • 81990-1999
  • 72000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in LaGrange, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 41990-1999
Average Bridge Daily Traffic in LaGrange, GA
Average Bridge Truck Traffic in LaGrange, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.5%Very good
  • 82.1%Good
  • 9.0%Satisfactory
  • 1.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.4%Very good
  • 70.1%Good
  • 1.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Very good
  • 85.1%Good
  • 6.0%Satisfactory
  • 1.5%Fair
  • 1.5%Poor
  • 1.5%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Excellent
  • 40.4%Very good
  • 40.4%Good
  • 8.8%Satisfactory
  • 5.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2850001,  Location: 10 MI SE OF LAGRANGE (Lat: 32.911653,  Lng: -84.900281),  Route carried "on" structure: US 27,  Year Built: 1927,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,700 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,550 (year 2032),  Design Load: H 15,  Features Intersected: POLE CAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000
Find on map >>   Show street view

Structure Number: 2850005,  Location: 5.6 MI SE OF LAGRANGE (Lat: 32.968247,  Lng: -84.985308),  Route carried "on" structure: US 27,  Year Built: 1949,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,720 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,580 (year 2032),  Design Load: H 15,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2850006,  Location: 3.5 MI SE OF LAGRANGE (Lat: 32.991428,  Lng: -85.004628),  Route carried "on" structure: US 27,  Year Built: 1948,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 8,610 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,915 (year 2032),  Design Load: H 15,  Features Intersected: LONG CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 43.89m (144.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2850007,  Location: SOUTH EDGE OF LAGRANGE (Lat: 33.008828,  Lng: -85.017978),  Route carried "on" structure: US 27,  Year Built: 1923,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 12,740 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,110 (year 2032),  Design Load: H 15,  Features Intersected: BLUE JOHN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $373,000
Find on map >>   Show street view

Structure Number: 2850008,  Location: IN NORTH LAGRANGE (Lat: 33.060547,  Lng: -85.028608),  Route carried "on" structure: US 27,  Year Built: 1936,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 13,180 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,770 (year 2032),  Design Load: H 15,  Features Intersected: DIX BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.578,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $394,000
Find on map >>   Show street view

Structure Number: 2850009,  Location: 3.9 MI N OF LAGRANGE (Lat: 33.096831,  Lng: -85.030400),  Route carried "on" structure: US 27,  Year Built: 1972,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 7,350 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,025 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BEECH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.796,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,110,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 285001,  Location: 4.9 MI N OF LAGRANGE (Lat: 33.111367,  Lng: -85.037647),  Route carried "on" structure: US 27,  Year Built: 1972,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 7,350 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,025 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: YELLOW JACKET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.406,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $1,164,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,747,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850011,  Location: 7.2 MI N OF LAGRANGE (Lat: 33.144131,  Lng: -85.038897),  Route carried "on" structure: US 27,  Year Built: 1972,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 6,580 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,870 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WEST POINT LAKE-FISH CR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850018,  Location: SOUTH SIDE OF LAGRANGE (Lat: 33.008269,  Lng: -85.021297),  Route carried "on" structure: Spur State highway 14,  Year Built: 1969,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,580 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,870 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BLUE JOHN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 2850019,  Location: SE EDGE OF LAGRANGE (Lat: 33.010308,  Lng: -85.017458),  Route carried "on" structure: Spur State highway 14,  Year Built: 1946,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 9,120 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,680 (year 2032),  Design Load: H 15,  Features Intersected: BLUE JOHN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $240,000
Find on map >>   Show street view

Structure Number: 2850021,  Location: EAST EDGE OF LAGRANGE (Lat: 33.048958,  Lng: -84.984008),  Route carried "on" structure: Spur State highway 14,  Year Built: 1969,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 15,430 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,145 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: LAGRANGE BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $803,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850026,  Location: 5 MI NE OF LAGRANGE (Lat: 33.051900,  Lng: -84.948128),  Route carried "on" structure: Ramp US 29,  Year Built: 1977,  Status: Open,  Structure Length: 14.54m (47.70ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-185 SBL (SR 411)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.3m (201.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,864,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,796,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850027,  Location: 2 MI E OF LAGRANGE (Lat: 33.058172,  Lng: -84.950328),  Route carried "on" structure: Ramp US 29,  Year Built: 1977,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85 (SR 403)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,125,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,688,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850033,  Location: 4.5 MI W OF LAGRANGE (Lat: 33.033839,  Lng: -85.141269),  Route carried "on" structure: State highway 109,  Year Built: 1972,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 9,070 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,605 (year 2032),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,114,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850035,  Location: 4.7 MI E OF LAGRANGE (Lat: 33.042569,  Lng: -84.951019),  Route carried "on" structure: State highway 109,  Year Built: 1977,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 7,870 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,805 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-185 SBL (SR 411)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $813,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,219,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850036,  Location: 2 MI E OF LAGRANGE (Lat: 33.042478,  Lng: -84.949550),  Route carried "on" structure: State highway 109,  Year Built: 1977,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 7,870 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,805 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-185 NBL (SR 411)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $793,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,190,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2850044,  Location: 1 MI SE OF LAGRANGE (Lat: 32.988919,  Lng: -85.029614),  Route carried "on" structure: State highway 219,  Year Built: 1967,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 5,120 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,680 (year 2032),  Design Load: HS 20,  Features Intersected: I-85 (SR 403)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.01m (55.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,095,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $3,143,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850045,  Location: SOUTH EDGE OF LAGRANGE (Lat: 33.007639,  Lng: -85.029219),  Route carried "on" structure: State highway 219,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 11,080 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,620 (year 2032),  Design Load: H 15,  Features Intersected: BLUE JOHN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $239,000
Find on map >>   Show street view

Structure Number: 2850046,  Location: 2.4 MI NW OF LAGRANGE (Lat: 33.073369,  Lng: -85.044419),  Route carried "on" structure: State highway 219,  Year Built: 1967,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5,530 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,295 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DIX BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2850047,  Location: 4.3 MI NW OF LAGRANGE (Lat: 33.096608,  Lng: -85.060578),  Route carried "on" structure: State highway 219,  Year Built: 1973,  Status: Open,  Structure Length: 12.89m (42.29ft),  Average Daily Traffic: 5,530 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,295 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: YELLOW JACKET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $1,653,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $2,479,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850048,  Location: 7.2 MI NW OF LAGRANGE (Lat: 33.131747,  Lng: -85.089619),  Route carried "on" structure: State highway 219,  Year Built: 1972,  Status: Open,  Structure Length: 20.45m (67.09ft),  Average Daily Traffic: 2,040 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,060 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WEST POINT LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 58.5m (191.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $2,622,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $3,933,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850056,  Location: 3 MI SW OF LAGRANGE (Lat: 32.960456,  Lng: -85.083144),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 31,780 (year 2012),  Truck Traffic: 19%,  Average Future Daily Traffic: 47,670 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 99 CANNONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850057,  Location: 3 MI SW OF LAGRANGE (Lat: 32.960578,  Lng: -85.083447),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 31,780 (year 2012),  Truck Traffic: 19%,  Average Future Daily Traffic: 47,670 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 99 CANNONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $826,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850058,  Location: 7.3 MI N OF WEST POINT (Lat: 32.967247,  Lng: -85.075028),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 31,780 (year 2012),  Truck Traffic: 19%,  Average Future Daily Traffic: 47,670 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LONG CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850059,  Location: 7.3 MI N OF WEST POINT (Lat: 32.967439,  Lng: -85.075239),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 31,780 (year 2012),  Truck Traffic: 19%,  Average Future Daily Traffic: 47,670 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LONG CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 285006,  Location: .2 MI SE OF LAGRANGE (Lat: 33.000008,  Lng: -85.012278),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 30,280 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 45,420 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 1 (US 27)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $918,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,377,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850061,  Location: .2 MI SE OF LAGRANGE (Lat: 33.000228,  Lng: -85.012458),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 28,140 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 42,210 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 1 (US 27)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $918,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,377,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850062,  Location: .5 MI SE OF LAGRANGE (Lat: 33.020428,  Lng: -84.985989),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 28,140 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 42,210 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-2914 BIG SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $770,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,155,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850063,  Location: .5 MI SE OF LAGRANGE (Lat: 33.020519,  Lng: -84.986308),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 28,140 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 42,210 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-2914 BIG SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $770,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,155,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850064,  Location: 1 MI E OF LAGRANGE (Lat: 33.033228,  Lng: -84.976428),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 28,140 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 42,210 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,032,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850065,  Location: 1 MI E OF LAGRANGE (Lat: 33.033408,  Lng: -84.976669),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 28,140 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 42,210 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,032,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850066,  Location: EAST EDGE OF LAGRANGE (Lat: 33.042178,  Lng: -84.969469),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 28,140 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 42,210 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 109
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,278,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,917,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850067,  Location: EAST EDGE OF LAGRANGE (Lat: 33.042078,  Lng: -84.969939),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 29,290 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 43,935 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 109
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,577,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850068,  Location: 2.5 MI NE OF LAGRANGE (Lat: 33.075511,  Lng: -84.924611),  Route carried "on" structure: Interstate 85,  Year Built: 1977,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 44,080 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 66,120 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SHOAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.406,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 19 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $330,000
Find on map >>   Show street view

Structure Number: 285008,  Location: 5.3 MI E OF LAGRANGE (Lat: 32.997469,  Lng: -84.952728),  Route carried "on" structure: Interstate 185,  Year Built: 1976,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 17,850 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: PANTHER CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.421,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $235,000
Find on map >>   Show street view

Structure Number: 2850081,  Location: 3 MI E OF LAGRANGE (Lat: 32.998808,  Lng: -84.953436),  Route carried "on" structure: Interstate 185,  Year Built: 1976,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 17,850 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: PANTHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.421,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $281,000
Find on map >>   Show street view

Structure Number: 2850082,  Location: 3 MI E OF LAGRANGE (Lat: 33.020928,  Lng: -84.951858),  Route carried "on" structure: Interstate 185,  Year Built: 1977,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 16,700 (year 2012),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,050 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $641,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $961,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850083,  Location: 3 MI E OF LAGRANGE (Lat: 33.020992,  Lng: -84.952267),  Route carried "on" structure: Interstate 185,  Year Built: 1977,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 16,700 (year 2012),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,050 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $641,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $961,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2850084,  Location: 4.7 MI E OF LAGRANGE (Lat: 33.023108,  Lng: -84.952319),  Route carried "on" structure: Interstate 185,  Year Built: 1976,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 16,700 (year 2012),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,050 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LONG CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.030,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $263,000
Find on map >>   Show street view

Structure Number: 2850085,  Location: 2 MI NE OF LAGRANGE (Lat: 33.061608,  Lng: -84.945158),  Route carried "on" structure: Interstate 185,  Year Built: 1977,  Status: Open,  Structure Length: 16.67m (54.69ft),  Average Daily Traffic: 15,700 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,550 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85 (SR 403)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.858,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,137,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $3,206,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2850087,  Location: 4 MI W OF LAGRANGE (Lat: 33.025397,  Lng: -85.139869),  Route carried "on" structure: Spur County highway 740,  Year Built: 1971,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 1,270 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,905 (year 2032),  Design Load: HS 15,  Features Intersected: WILSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $481,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $721,000,  Deck Structure Type: Concrete Cast-file-Place