Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Garden City, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 541ft / 165mTotal length
  • $202,430,000Total costs
  • 578,510Total average daily traffic
  • 18,731Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Garden City
  • No street view available for this location

New bridges in Garden City, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 11960-1969
  • 111970-1979
  • 21980-1989
  • 12000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Garden City, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 31980-1989
  • 11990-1999
Average Bridge Daily Traffic in Garden City, GA
Average Bridge Truck Traffic in Garden City, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 86.7%Good
  • 6.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 66.7%Very good
  • 33.3%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 93.3%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 30.0%Very good
  • 60.0%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 510024,  Location: CITY OF GARDEN CITY (Lat: 32.097108,  Lng: -81.138578),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 717 ALLEN BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $832,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510025,  Location: CITY OF GARDEN CITY (Lat: 32.096953,  Lng: -81.138689),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 717 ALLEN BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $832,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510026,  Location: CITY OF GARDEN CITY (Lat: 32.097997,  Lng: -81.140328),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 15.15m (49.70ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CS 594-& CSX R/R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,471,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $3,707,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510027,  Location: CITY OF GARDEN CITY (Lat: 32.097719,  Lng: -81.140269),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 15.36m (50.39ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CS 594-& CSX R/R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,969,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $2,954,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510028,  Location: CITY OF GARDEN CITY (Lat: 32.099439,  Lng: -81.143028),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510029,  Location: CITY OF GARDEN CITY (Lat: 32.099269,  Lng: -81.143169),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $716,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,074,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51003,  Location: CITY OF GARDEN CITY (Lat: 32.099861,  Lng: -81.143136),  Route carried "on" structure: Interstate 516,  Year Built: 1979,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,560 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,340 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: DUNDEE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.8m (110.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 510031,  Location: N SECTION OF GARDEN CITY (Lat: 32.121250,  Lng: -81.167689),  Route carried "on" structure: State highway 21,  Year Built: 1945,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 26,520 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 39,780 (year 2031),  Design Load: H 15,  Features Intersected: PIPE MAKERS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $408,000
Find on map >>   Show street view

Structure Number: 510039,  Location: CITY OF GARDEN CITY (Lat: 32.098689,  Lng: -81.143850),  Route carried "on" structure: Ramp State highway 21,  Year Built: 1979,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,460 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: DUNDEE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $149,000
Find on map >>   Show street view

Structure Number: 51004,  Location: CITY OF GARDEN CITY (Lat: 32.098339,  Lng: -81.143978),  Route carried "on" structure: Ramp State highway 21,  Year Built: 1979,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,450 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,675 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: DUNDEE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $97,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $145,000
Find on map >>   Show street view

Structure Number: 510044,  Location: 5 MI SW OF SAVANNAH (Lat: 32.039319,  Lng: -81.208219),  Route carried "on" structure: US 17,  Year Built: 1984,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 20,200 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,300 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HARDIN CANAL,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $980,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,471,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510045,  Location: 5 MI SW OF SAVANNAH (Lat: 32.039864,  Lng: -81.203869),  Route carried "on" structure: US 17,  Year Built: 1984,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 19,520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,280 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SALT CREEK,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $1,790,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $2,685,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510051,  Location: CITY OF GARDEN CITY (Lat: 32.101128,  Lng: -81.142428),  Route carried "on" structure: State highway 25,  Year Built: 1977,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 12,950 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,425 (year 2031),  Design Load: HS 20,  Features Intersected: DUNDEE CANAL,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $511,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $767,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51006,  Location: IN GARDEN CITY (Lat: 32.090339,  Lng: -81.153619),  Route carried "on" structure: US 80,  Year Built: 1938,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 17,370 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,055 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD (641183P)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 23.9m (78.4ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,849,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $4,273,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510061,  Location: IN GARDEN CITY (Lat: 32.096539,  Lng: -81.143389),  Route carried "on" structure: US 80,  Year Built: 1944,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 17,370 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,055 (year 2031),  Design Load: H 15,  Features Intersected: DUNDEE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $417,000
Find on map >>   Show street view

Structure Number: 510079,  Location: 5 MI W OF SAVANNAH (Lat: 32.070158,  Lng: -81.202689),  Route carried "on" structure: State highway 307,  Year Built: 1966,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 16,230 (year 2011),  Truck Traffic: 23%,  Average Future Daily Traffic: 24,345 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-16 (SR 404)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,833,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,749,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51008,  Location: 3 MI NW OF SAVANNAH (Lat: 32.106103,  Lng: -81.195756),  Route carried "on" structure: State highway 307,  Year Built: 1971,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 17,160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,740 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PIPE MAKERS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000
Find on map >>   Show street view

Structure Number: 515073,  Location: 5.5 MILES NORTH OF SAV. (Lat: 32.132267,  Lng: -81.153853),  Route carried "on" structure: State highway 25,  Year Built: 2003,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 11,000 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,500 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PORT ENTRANCE,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $832,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51508,  Location: 5 MI N OF SAVANNAH (Lat: 32.152708,  Lng: -81.164025),  Route carried "on" structure: State highway 25,  Year Built: 2011,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 7,000 (year 2008),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,000 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RAILROA,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $692,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,037,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 515081,  Location: 1.6 MILES SOUTH OF PORT W (Lat: 32.126628,  Lng: -81.156067),  Route carried "on" structure: State highway 307,  Year Built: 2012,  Status: Open,  Structure Length: 28.93m (94.91ft),  Average Daily Traffic: 11,000 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,630 (year 2030),  Design Load: HS 25 or greater,  Features Intersected: PIPE MAKER CANAL / RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,730,000,  Roadway Improvement Cost: $573,000,  Total Project Cost: $8,596,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 515113,  Location: CITY OF GARDEN CITY (Lat: 32.123808,  Lng: -81.150839),  Route carried "on" structure: State highway 25,  Year Built: 2020,  Status: Open,  Structure Length: 38.44m (126.12ft),  Average Daily Traffic: 4,940 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,410 (year 2031),  Design Load: HL 93,  Features Intersected: PIPEMAKER CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.12m (151.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $111,976,000,  Roadway Improvement Cost: $11,197,000,  Total Project Cost: $167,965,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510024,  Location: CITY OF GARDEN CITY (Lat: 32.097108,  Lng: -81.138578),  Route carried "under" structure: City street 717,  Structure Length: 0. m,  Average Daily Traffic: 1,640 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 421 NBL (I-516),  Facility Carried by Structure: I-516 (NBL)
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510025,  Location: CITY OF GARDEN CITY (Lat: 32.096953,  Lng: -81.138689),  Route carried "under" structure: City street 717,  Structure Length: 0. m,  Average Daily Traffic: 1,640 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 421 SBL (I-516),  Facility Carried by Structure: I-516 (SBL)
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510026,  Location: CITY OF GARDEN CITY (Lat: 32.097997,  Lng: -81.140328),  Route carried "under" structure: City street 594,  Structure Length: 0. m,  Average Daily Traffic: 9,360 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 421 NBL (I-516),  Facility Carried by Structure: I-516 (NBL)
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510027,  Location: CITY OF GARDEN CITY (Lat: 32.097719,  Lng: -81.140269),  Route carried "under" structure: City street 594,  Structure Length: 0. m,  Average Daily Traffic: 9,360 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 421 SBL (I-516),  Facility Carried by Structure: I-516 (SBL)
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510028,  Location: CITY OF GARDEN CITY (Lat: 32.099439,  Lng: -81.143028),  Route carried "under" structure: State highway 25,  Structure Length: 0. m,  Average Daily Traffic: 14,140 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 421 NBL (I-516),  Facility Carried by Structure: I-516 (NBL)
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510029,  Location: CITY OF GARDEN CITY (Lat: 32.099269,  Lng: -81.143169),  Route carried "under" structure: State highway 25,  Structure Length: 0. m,  Average Daily Traffic: 14,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 421 SBL (I-516),  Facility Carried by Structure: I-516 (SBL)
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 24.140,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510079,  Location: 5 MI W OF SAVANNAH (Lat: 32.070158,  Lng: -81.202689),  Route carried "under" structure: Interstate 16,  Structure Length: 0. m,  Average Daily Traffic: 37,400 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 307,  Facility Carried by Structure: SR 307
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 257.495,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 510154,  Location: N SECTION OF GARDEN CTY (Lat: 32.111297,  Lng: -81.161028),  Route carried "under" structure: State highway 21,  Structure Length: 0. m,  Average Daily Traffic: 32,670 (year 2011),  Truck Traffic: 1%,  Features Intersected: SR 21,  Facility Carried by Structure: PED BRIDGE
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 14.484,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 515073,  Location: 5.5 MILES NORTH OF SAV. (Lat: 32.132267,  Lng: -81.153853),  Route carried "under" structure: Other road 25,  Structure Length: 0. m,  Average Daily Traffic: 4,440 (year 2003),  Truck Traffic: 5%,  Features Intersected: SR 25 OCEAN HIG,  Facility Carried by Structure: OCEAN HIGHWAY
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 515107,  Location: 1 MI N OF PORT WENTWORTH (Lat: 32.220267,  Lng: -81.196617),  Route carried "under" structure: State highway 21,  Structure Length: 0. m,  Average Daily Traffic: 32,670 (year 2011),  Truck Traffic: 1%,  Features Intersected: SR 21,  Facility Carried by Structure: PED BRIDGE
Minimum Vertical Clearance: 5.68m (18.64ft),  Kilometerpoint: 26.715,  Length of Maximum Span: 0.0m

Discuss Garden City, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.