Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Florence, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 2,031ft / 619mTotal length
  • $324,837,000Total costs
  • 354,560Total average daily traffic
  • 21,559Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Florence
  • No street view available for this location

New bridges in Florence, AL - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 31920-1929
  • 81930-1939
  • 41940-1949
  • 51950-1959
  • 21960-1969
  • 61970-1979
  • 41980-1989
  • 21990-1999
  • 152000-2009
  • 22010-2019
Reconstructed bridges in Florence, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Florence, AL
Average Bridge Truck Traffic in Florence, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.0%Excellent
  • 12.1%Very good
  • 21.2%Good
  • 30.3%Satisfactory
  • 27.3%Fair
  • 6.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.1%Excellent
  • 15.2%Very good
  • 27.3%Good
  • 18.2%Satisfactory
  • 27.3%Fair
  • 6.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.0%Excellent
  • 9.1%Very good
  • 33.3%Good
  • 21.2%Satisfactory
  • 24.2%Fair
  • 6.1%Poor
  • 3.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.2%Very good
  • 30.8%Good
  • 17.9%Satisfactory
  • 23.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 6.7%Excellent
  • 13.3%Very good
  • 33.3%Good
  • 26.7%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 133170071,  Location: ON WILSON DAM (Lat: 34.800000,  Lng: -87.625000),  Route carried "on" structure: Alternate Federal lands road ,  Year Built: 1924,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 151.24m (496.19ft),  Average Daily Traffic: 2,841 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,000 (year 2041),  Design Load: HS 15,  Features Intersected: TENNESSEE RIVER,  Facility Carried by Structure: Res Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Tennessee Valley Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Navigation Control: Yes ( Vertical Clearance: 17.3m (56.8ft), Horizontal Clearance: 33.5m (109.9ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 78,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 151.24m (496.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Bridge Improvement Cost: $35,000,000,  Roadway Improvement Cost: $2,000,000,  Total Project Cost: $45,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 96,  Location: 21ST ST NO * VILLAGE CK (Lat: 33.539200,  Lng: -86.821200),  Route carried "on" structure: City street ,  Year Built: 1915,  Status: Posted for load,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 700 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,000 (year 2036),  Features Intersected: VILLAGE CK,  Facility Carried by Structure: 21 ST ST NO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Serious,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $835,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $919,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 111,  Location: 1.8 MI S INT CO RT 30 (Lat: 34.854292,  Lng: -87.638206),  Route carried "on" structure: County highway 47,  Year Built: 1917,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,750 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,500 (year 2028),  Features Intersected: WILSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $543,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 273,  Location: 0.4 MI S FAYETTE CO LINE (Lat: 33.574283,  Lng: -87.658367),  Route carried "on" structure: US 43,  Year Built: 1925,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 2,950 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,789 (year 2038),  Design Load: H 15,  Features Intersected: ROCKY CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 358.256,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.21m (10.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $702,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 309,  Location: 2611 FT S JCT 1096 (Lat: 34.128994,  Lng: -86.308919),  Route carried "on" structure: County highway 140,  Year Built: 1925,  Status: Posted for load,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 100 (year 1994),  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.79m (12.43ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $429,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 952,  Location: (BALD ROCK)S OF ST.77 (Lat: 33.142000,  Lng: -85.627800),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 60 (year 1997),  Average Future Daily Traffic: 100 (year 2030),  Design Load: H 10,  Features Intersected: WOLF PEN CREEK,  Facility Carried by Structure: CO RD #843
Minimum Vertical Clearance: 9.00m (29.53ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $143,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 957,  Location: WAYMON SMITH)W.MT CARMEL (Lat: 33.350200,  Lng: -85.354600),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 40 (year 1997),  Average Future Daily Traffic: 75 (year 2030),  Design Load: H 10,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: CO RD 489
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $110,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 958,  Location: IN CITY OF BRIDGEPORT (Lat: 34.943611,  Lng: -85.725833),  Route carried "on" structure: US 277,  Year Built: 1938,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 3,841 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,377 (year 2038),  Design Load: H 15,  Features Intersected: CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.944,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.21m (17.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $965,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,062,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1507,  Location: 0.5 MI W JCT US HWY 72 (Lat: 34.696667,  Lng: -86.402592),  Route carried "on" structure: County highway 233,  Year Built: 1936,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,297 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,870 (year 2042),  Design Load: H 15,  Features Intersected: SAND BRANCH,  Facility Carried by Structure: LITTLE COVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $245,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1709,  Location: JCT SR 2 & SR 20 (Lat: 34.791664,  Lng: -87.672883),  Route carried "on" structure: US 72,  Year Built: 1938,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 27,850 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,848 (year 2033),  Design Load: H 20,  Features Intersected: SR 20 & TN RV RELIEF,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.248,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,885,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,074,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1777,  Location: BETWEEN SOUTH * GREEN ST (Lat: 34.800333,  Lng: -86.973444),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 840 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,165 (year 2033),  Features Intersected: TOWN CREEK,  Facility Carried by Structure: SOUTH MADISON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 10.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2008,  Location: 1.2 MI E INT AL 20 (Lat: 34.842942,  Lng: -87.722467),  Route carried "on" structure: County highway 41,  Year Built: 1939,  Status: Posted for load,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 455 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 910 (year 2030),  Features Intersected: LITTLE CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $683,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $751,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2293,  Location: 0.7 MI OF CO RT 074 (Lat: 33.109661,  Lng: -86.203106),  Route carried "on" structure: County highway 13,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 245 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 582 (year 2038),  Features Intersected: SHELTON CREEK,  Facility Carried by Structure: CO 073
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $296,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2295,  Location: 2.0 MI. N. OF WAGARVILLE (Lat: 31.468131,  Lng: -88.028086),  Route carried "on" structure: US 43,  Year Built: 1940,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 8,240 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,585 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.016,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,879,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,067,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 273,  Location: APPROX 150 FT N UNION AVE (Lat: 34.802556,  Lng: -87.655278),  Route carried "on" structure: City street ,  Year Built: 1942,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 1,050 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,294 (year 2034),  Features Intersected: UN-NAMED CREEK,  Facility Carried by Structure: COMMERCE ST
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $317,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 309,  Location: 0.2 M E INT SWEETWATER AV (Lat: 34.816611,  Lng: -87.650194),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 1,250 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,552 (year 2034),  Features Intersected: SWEETWATER CREEK,  Facility Carried by Structure: BRANCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $237,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4756,  Location: 3 M W JCT SR 2 & SR 133 (Lat: 34.806556,  Lng: -87.664111),  Route carried "on" structure: US 72,  Year Built: 1954,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 11,170 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,576 (year 2033),  Design Load: HS 20,  Features Intersected: ROYAL AVENUE,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.470,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,229,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,452,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 519,  Location: 1.4 M N JCT SR 20 & SR 2 (Lat: 34.785756,  Lng: -87.696022),  Route carried "on" structure: State highway 20,  Year Built: 1955,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 7,060 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,509 (year 2033),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.122,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.34m (43.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $3,018,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $3,320,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6212,  Location: 0.1 M N JCT SR 17 & SR133 (Lat: 34.842764,  Lng: -87.674492),  Route carried "on" structure: State highway 17,  Year Built: 1958,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 8,080 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,420 (year 2033),  Design Load: H 20,  Features Intersected: COX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 540.443,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.07m (13.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,488,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $2,737,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6213,  Location: 0.5 M N JCT SR 17 &SR 133 (Lat: 34.848722,  Lng: -87.674250),  Route carried "on" structure: State highway 17,  Year Built: 1958,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,080 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,420 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 541.168,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $636,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7762,  Location: 1.5 MI N JCT SR 20 (Lat: 34.807722,  Lng: -87.682333),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 18,500 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,000 (year 2034),  Design Load: HS 20,  Features Intersected: CIRCULAR ROAD,  Facility Carried by Structure: PINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.23m (33.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,208,000,  Roadway Improvement Cost: $421,000,  Total Project Cost: $4,629,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1149,  Location: 0.1 M E JCT SR133 & SR157 (Lat: 34.839100,  Lng: -87.684300),  Route carried "on" structure: State highway 133,  Year Built: 1975,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 16,400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,572 (year 2033),  Design Load: HS 20,  Features Intersected: COX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.868,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,789,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $3,068,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11491,  Location: 1.5 M E JCT SR133 & SR 20 (Lat: 34.831117,  Lng: -87.703525),  Route carried "on" structure: State highway 133,  Year Built: 1975,  Status: Open,  Structure Length: 12.13m (39.80ft),  Average Daily Traffic: 9,000 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,387 (year 2033),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.817,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.98m (42.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $5,340,000,  Roadway Improvement Cost: $534,000,  Total Project Cost: $5,874,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11492,  Location: 1.3 M E JCT SR133 & SR 20 (Lat: 34.829994,  Lng: -87.706475),  Route carried "on" structure: State highway 133,  Year Built: 1975,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 9,000 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,387 (year 2033),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.010,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.4m (70.2ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,987,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $3,286,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11493,  Location: 1.1 M E JCT SR133 & SR 20 (Lat: 34.829858,  Lng: -87.709950),  Route carried "on" structure: State highway 133,  Year Built: 1975,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 9,000 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,387 (year 2033),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.314,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,821,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $4,203,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11874,  Location: 0.1 M S JCT SR 133 (Lat: 34.828917,  Lng: -87.698694),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 2,450 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,100 (year 2034),  Design Load: H 15,  Features Intersected: COX CREEK,  Facility Carried by Structure: JACKSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.86m (12.66ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $741,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $815,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11886,  Location: 800 F S INT MARS HILL RD (Lat: 34.855306,  Lng: -87.644806),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 975 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,650 (year 2034),  Design Load: H 15,  Features Intersected: WILSON CREEK,  Facility Carried by Structure: KNIGHT'S BRIDGE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $731,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $804,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12846,  Location: 1.5 M N SR 133/MARS HILL (Lat: 34.858278,  Lng: -87.645222),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,550 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,550 (year 2034),  Design Load: HS 20,  Features Intersected: COX CREEK,  Facility Carried by Structure: MARS HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14013,  Location: 6// F N INT COX CREEK PKY (Lat: 34.845444,  Lng: -87.666806),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 7,510 (year 2014),  Truck Traffic: 40%,  Average Future Daily Traffic: 9,308 (year 2034),  Design Load: HS 20,  Features Intersected: COX CREEK,  Facility Carried by Structure: HELTON DRIVE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,143,000,  Roadway Improvement Cost: $714,000,  Total Project Cost: $7,857,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14035,  Location: .2 MI S AL 157 / 133 (Lat: 34.838000,  Lng: -87.687722),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 16,000 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 25,000 (year 2034),  Design Load: HS 20,  Features Intersected: COX CREEK,  Facility Carried by Structure: WOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,792,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $3,071,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1497,  Location: 1 MI SE FRIDAYS CROSSING (Lat: 34.051931,  Lng: -86.423386),  Route carried "on" structure: County highway 448,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 106 (year 2021),  Average Future Daily Traffic: 158 (year 2041),  Design Load: H 15,  Features Intersected: JONES CREEK,  Facility Carried by Structure: KENT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $138,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1508,  Location: GENEVA CO LN TO HWY 52 W (Lat: 31.179606,  Lng: -85.476678),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 55 (year 1993),  Average Future Daily Traffic: 100 (year 2033),  Design Load: H 10,  Features Intersected: NEWTON CREEK,  Facility Carried by Structure: HORNE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $303,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $333,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16541,  Location: 0.1MI S CO 14 (Lat: 34.824436,  Lng: -87.763586),  Route carried "on" structure: County highway 19,  Year Built: 1995,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 105 (year 1987),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2030),  Design Load: HS 20,  Features Intersected: SINKING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $490,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16549,  Location: 2.4 M W JCT SR 2 & SR133 (Lat: 34.813856,  Lng: -87.664583),  Route carried "on" structure: State highway 2,  Year Built: 2008,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 26,710 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 32,462 (year 2033),  Design Load: HS 20,  Features Intersected: RAILROAD & CITY ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.372,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 36.3m (119.1ft),  Out-to-Out Width: 40.5m (132.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $7,332,000,  Roadway Improvement Cost: $733,000,  Total Project Cost: $8,065,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1655,  Location: JCT SR 157 & SR 2 (Lat: 34.815678,  Lng: -87.663014),  Route carried "on" structure: Bypass State highway 157,  Year Built: 2008,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 7,400 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,996 (year 2033),  Design Load: HS 20,  Features Intersected: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.253,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,505,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,756,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16551,  Location: JCT SR 157 & SR 2 (Lat: 34.815639,  Lng: -87.663072),  Route carried "on" structure: Bypass State highway 157,  Year Built: 2008,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 7,400 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,996 (year 2033),  Design Load: HS 20,  Features Intersected: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.253,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,505,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,756,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16553,  Location: 0.1 M S JCT SR157 & SR 2 (Lat: 34.812025,  Lng: -87.660047),  Route carried "on" structure: State highway 157,  Year Built: 2008,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 6,215 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,449 (year 2033),  Design Load: HS 20,  Features Intersected: AVONDALE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.768,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 17.3m (56.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,959,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $3,255,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16604,  Location: 2.3 M N JCT SR133 & SR184 (Lat: 34.790528,  Lng: -87.641278),  Route carried "on" structure: State highway 133,  Year Built: 2001,  Status: Open,  Structure Length: 137.06m (449.67ft),  Average Daily Traffic: 13,610 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,008 (year 2033),  Design Load: HS 20,  Features Intersected: TENNESSEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.461,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 18.9m (62.0ft), Horizontal Clearance: 121.9m (399.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 26,  Length of Maximum Span: 121.9m (399.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 137.06m (449.67ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $54,510,000,  Roadway Improvement Cost: $5,451,000,  Total Project Cost: $59,961,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Florence, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.