Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for East Point, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 62Number of bridges
  • 610ft / 186mTotal length
  • $27,358,000Total costs
  • 2,119,728Total average daily traffic
  • 28,550Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Point
  • No street view available for this location

New bridges in East Point, GA - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 191960-1969
  • 71970-1979
  • 81980-1989
  • 31990-1999
  • 22000-2009
Reconstructed bridges in East Point, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in East Point, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 63.3%Good
  • 33.3%Satisfactory
  • 3.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.3%Very good
  • 76.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.3%Very good
  • 93.3%Good
  • 3.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.8%Very good
  • 38.5%Good
  • 7.7%Satisfactory
  • 23.1%Fair
Find on map >>   Show street view

Structure Number: 1210045,  Location: IN EAST POINT (Lat: 33.684578,  Lng: -84.440483),  Route carried "on" structure: US 29,  Year Built: 1962,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 6,590 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,885 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9064 NORMAN BERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $916,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210046,  Location: IN NORTH EAST POINT (Lat: 33.698067,  Lng: -84.429481),  Route carried "on" structure: US 29,  Year Built: 1983,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 13,130 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,695 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 166
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.796,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,946,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,920,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121009,  Location: 7.4 MI W OF ATLANTA (Lat: 33.725089,  Lng: -84.514178),  Route carried "on" structure: County highway 9053,  Year Built: 1971,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 18,750 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,125 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: CASCADE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,159,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,739,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210096,  Location: IN NW EAST POINT (Lat: 33.697694,  Lng: -84.465747),  Route carried "on" structure: State highway 154,  Year Built: 1964,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 51,160 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 76,740 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH UTOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.624,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 1210097,  Location: IN NORTH EAST POINT (Lat: 33.699258,  Lng: -84.457378),  Route carried "on" structure: State highway 154,  Year Built: 1965,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 36,100 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,150 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9071 DELOWE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.43m (37.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $369,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $567,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210098,  Location: IN NORTH EAST POINT (Lat: 33.699439,  Lng: -84.457339),  Route carried "on" structure: State highway 154,  Year Built: 1965,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 36,100 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,150 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9071 DELOWE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.43m (37.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $786,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210099,  Location: IN NORTH EAST POINT (Lat: 33.698014,  Lng: -84.448456),  Route carried "on" structure: State highway 154,  Year Built: 1965,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 36,100 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,150 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9072 STANTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $740,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12101,  Location: IN NORTH EAST POINT (Lat: 33.698189,  Lng: -84.448408),  Route carried "on" structure: State highway 154,  Year Built: 1965,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 36,100 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,150 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-9072 STANTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.234,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.80m (38.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $607,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $838,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210223,  Location: IN EAST POINT (Lat: 33.652478,  Lng: -84.497608),  Route carried "on" structure: Interstate 285,  Year Built: 1966,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 130,030 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 195,045 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH FORK CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.8m (137.1ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 43.7m (143.4ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210273,  Location: 7.3 MI N OF UNION CITY (Lat: 33.657308,  Lng: -84.555989),  Route carried "on" structure: County highway 9069,  Year Built: 1952,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,510 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,265 (year 2031),  Design Load: H 15,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: BUTNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 121031,  Location: IN NW ROSWELL-OLD SR 140 (Lat: 34.034847,  Lng: -84.361319),  Route carried "on" structure: County highway 9406,  Year Built: 1977,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 11,680 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,520 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HOGWALLER CREEK,  Facility Carried by Structure: CRABAPPLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 1210313,  Location: IN SW ATLANTA (Lat: 33.697419,  Lng: -84.483028),  Route carried "on" structure: City street 3018,  Year Built: 1965,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 154,  Facility Carried by Structure: MAXWELL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210315,  Location: IN EAST POINT (Lat: 33.660719,  Lng: -84.497558),  Route carried "on" structure: City street 3089,  Year Built: 1966,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407),  Facility Carried by Structure: REDWINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210318,  Location: IN SW ATLANTA (Lat: 33.697836,  Lng: -84.474872),  Route carried "on" structure: City street 9000,  Year Built: 1965,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 1,100 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,650 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SR 154 LAKEWOOD F'WAY,  Facility Carried by Structure: DODSON DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210353,  Location: IN COLLEGE PARK (Lat: 33.660928,  Lng: -84.428319),  Route carried "on" structure: City street 9064,  Year Built: 1963,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 2,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: NORMAN BERRY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210358,  Location: IN NORTH EAST POINT (Lat: 33.701528,  Lng: -84.447550),  Route carried "on" structure: City street 9072,  Year Built: 1964,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 4,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,410 (year 2031),  Design Load: H 15,  Features Intersected: SOUTH UTOY CREEK,  Facility Carried by Structure: STANTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 121036,  Location: IN ATLANTA (Lat: 33.766928,  Lng: -84.388097),  Route carried "on" structure: City street 9073,  Year Built: 1980,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 7,300 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,950 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: SPRING STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Lanes under structure: 13,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 66.8m (219.2ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,322,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,984,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1210362,  Location: IN SOUTH WEST ATLANTA (Lat: 33.655872,  Lng: -84.521647),  Route carried "on" structure: County highway 9074,  Year Built: 1976,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 12,880 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,320 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: WELCOME ALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $797,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210363,  Location: 4.2 MI W OF COLLEGE PARK (Lat: 33.657097,  Lng: -84.521778),  Route carried "on" structure: City street 9074,  Year Built: 1977,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,510 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,265 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 6 CAMP CREEK PKWY.,  Facility Carried by Structure: WELCOME ALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $633,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210366,  Location: IN EAST POINT (Lat: 33.636456,  Lng: -84.492139),  Route carried "on" structure: City street 9082,  Year Built: 1967,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 10,550 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,825 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407),  Facility Carried by Structure: WASHINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210367,  Location: IN EAST POINT (Lat: 33.650475,  Lng: -84.489561),  Route carried "on" structure: City street 9082,  Year Built: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,610 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,415 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: FUR CREEK,  Facility Carried by Structure: WASHINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 1210368,  Location: IN EAST POINT (Lat: 33.652239,  Lng: -84.488619),  Route carried "on" structure: City street 9082,  Year Built: 1987,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 7,610 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,415 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: WASHINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,119,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210371,  Location: IN EAST POINT (Lat: 33.666919,  Lng: -84.428339),  Route carried "on" structure: City street 9079,  Year Built: 1978,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 2,810 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-9064 NORMAN BERRY DR,  Facility Carried by Structure: CENTRAL AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210373,  Location: IN HAPEVILLE (Lat: 33.665119,  Lng: -84.418528),  Route carried "on" structure: City street 9081,  Year Built: 1963,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 4,770 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,155 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: SYLVAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210463,  Location: IN COLLEGE PARK (Lat: 33.645058,  Lng: -84.449886),  Route carried "on" structure: City street 9329,  Year Built: 1976,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 30,970 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 46,455 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: I-85- 2 I-85 RAMPS,  Facility Carried by Structure: CAMP CRK PKWY NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,102,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,653,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1210466,  Location: IN EAST POINT (Lat: 33.656500,  Lng: -84.497689),  Route carried "on" structure: State highway 6,  Year Built: 1966,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 33,240 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 49,860 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407),  Facility Carried by Structure: CAMP CREEK P'WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.613,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1210596,  Location: IN COLLEGE PARK (Lat: 33.652533,  Lng: -84.438731),  Route carried "on" structure: Interstate 85,  Year Built: 1979,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 127,920 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 191,880 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLINT RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.482,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 39 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 1210621,  Location: IN EAST POINT CITY LIMITS (Lat: 33.689239,  Lng: -84.437119),  Route carried "on" structure: City street 9117,  Year Built: 1985,  Status: Open,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 3,060 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,590 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 14-M-9116-MARTA-CSX R,  Facility Carried by Structure: HAROLD SHEAT PKY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,222,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,333,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215183,  Location: EAST POINT CITY LIMITS (Lat: 33.675378,  Lng: -84.441297),  Route carried "on" structure: City street 9082,  Year Built: 1986,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 11,620 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,430 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MARTA,  Facility Carried by Structure: IRENE KIDD PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $639,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215184,  Location: IN EAST POINT CITY LIMITS (Lat: 33.675589,  Lng: -84.439978),  Route carried "on" structure: City street 9082,  Year Built: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 11,560 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,340 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: IRENE KIDD PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $290,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1215185,  Location: IN EAST POINT CITY LIMITS (Lat: 33.676089,  Lng: -84.438858),  Route carried "on" structure: City street 9082,  Year Built: 1986,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 11,620 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,430 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CEN OF GA RAILROAD,  Facility Carried by Structure: IRENE KIDD PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,012,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121526,  Location: IN SOUTH ALPHARETTA (Lat: 34.037500,  Lng: -84.302989),  Route carried "on" structure: City street 9486,  Year Built: 1991,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 20,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 30,120 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK,  Facility Carried by Structure: MANSELL ROAD (EBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,328,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,993,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215264,  Location: IN COLLEGE PARK (Lat: 33.660128,  Lng: -84.429519),  Route carried "on" structure: City street 6397,  Year Built: 1991,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 6,880 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,320 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-85,  Facility Carried by Structure: BOBBY BROWN PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215268,  Location: IN WEST COLLEGE PARK (Lat: 33.652789,  Lng: -84.493658),  Route carried "on" structure: City street 6351,  Year Built: 1996,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: DESERT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215323,  Location: IN EASTPOINT CITY LIMITS (Lat: 33.653142,  Lng: -84.503244),  Route carried "on" structure: City street 8022,  Year Built: 2004,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: NORTH COMMERCE DRI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 61.0m (200.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,758,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $2,637,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1215343,  Location: IN ATLANTA CITY LIMITS (Lat: 33.660772,  Lng: -84.511600),  Route carried "on" structure: City street 3089,  Year Built: 2005,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 500 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 750 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: REDWINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $826,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1210045,  Location: IN EAST POINT (Lat: 33.684578,  Lng: -84.440483),  Route carried "under" structure: City street 9064,  Structure Length: 0. m,  Average Daily Traffic: 6,850 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 14 (US 29) MAIN ST.,  Facility Carried by Structure: US 29, SR 14 MAIN
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 4.828,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210046,  Location: IN NORTH EAST POINT (Lat: 33.698067,  Lng: -84.429481),  Route carried "under" structure: State highway 166,  Structure Length: 0. m,  Average Daily Traffic: 61,200 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 14 (US 29),  Facility Carried by Structure: US 29 / SR. 14
Minimum Vertical Clearance: 6.24m (20.47ft),  Kilometerpoint: 20.921,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210097,  Location: IN NORTH EAST POINT (Lat: 33.699258,  Lng: -84.457378),  Route carried "under" structure: City street 9071,  Structure Length: 0. m,  Average Daily Traffic: 12,200 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 154 NBL,  Facility Carried by Structure: SR 154 / SR 166 NB
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210098,  Location: IN NORTH EAST POINT (Lat: 33.699439,  Lng: -84.457339),  Route carried "under" structure: City street 9071,  Structure Length: 0. m,  Average Daily Traffic: 12,200 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 154 SBL,  Facility Carried by Structure: SR 154 SBL
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210099,  Location: IN NORTH EAST POINT (Lat: 33.698014,  Lng: -84.448456),  Route carried "under" structure: City street 9072,  Structure Length: 0. m,  Average Daily Traffic: 11,140 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 154 NBL,  Facility Carried by Structure: SR 154 NBL
Minimum Vertical Clearance: 6.47m (21.23ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 12101,  Location: IN NORTH EAST POINT (Lat: 33.698189,  Lng: -84.448408),  Route carried "under" structure: City street 9072,  Structure Length: 0. m,  Average Daily Traffic: 11,140 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 154 SBL,  Facility Carried by Structure: SR 154 SBL
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210101,  Location: IN EAST POINT (Lat: 33.697769,  Lng: -84.418331),  Route carried "under" structure: City street 9081,  Structure Length: 0. m,  Average Daily Traffic: 13,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 166 LAKEWOOD FREEWAY,  Facility Carried by Structure: LANKFORD PARKWAY
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 4.828,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210313,  Location: IN SW ATLANTA (Lat: 33.697419,  Lng: -84.483028),  Route carried "under" structure: State highway 154,  Structure Length: 0. m,  Average Daily Traffic: 45,600 (year 1998),  Truck Traffic: 1%,  Features Intersected: CS 3018 MAXWELL DRIVE,  Facility Carried by Structure: MAXWELL DRIVE
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 37.015,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210315,  Location: IN EAST POINT (Lat: 33.660719,  Lng: -84.497558),  Route carried "under" structure: Interstate 285,  Structure Length: 0. m,  Average Daily Traffic: 127,500 (year 1998),  Truck Traffic: 1%,  Features Intersected: CS 3089 REDWINE ROAD,  Facility Carried by Structure: REDWINE ROAD
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210318,  Location: IN SW ATLANTA (Lat: 33.697836,  Lng: -84.474872),  Route carried "under" structure: State highway 154,  Structure Length: 0. m,  Average Daily Traffic: 45,600 (year 1998),  Truck Traffic: 1%,  Features Intersected: M-9000 DODSON DRIVE,  Facility Carried by Structure: DODSON DRIVE
Minimum Vertical Clearance: 5.68m (18.64ft),  Kilometerpoint: 38.624,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210353,  Location: IN COLLEGE PARK (Lat: 33.660928,  Lng: -84.428319),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 113,400 (year 2010),  Truck Traffic: 1%,  Features Intersected: M-9064 NORMAN BERRY DR.,  Facility Carried by Structure: NORMAN BERRY DR
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 119.092,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1210363,  Location: 4.2 MI W OF COLLEGE PARK (Lat: 33.657097,  Lng: -84.521778),  Route carried "under" structure: State highway 6,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 1999),  Truck Traffic: 1%,  Features Intersected: M-9074 WELCOME ALL ROAD,  Facility Carried by Structure: WELCOME ALL ROAD
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss East Point, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.