Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Caldwell, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 84Number of bridges
  • 614ft / 187mTotal length
  • $38,598,000Total costs
  • 866,223Total average daily traffic
  • 92,333Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Caldwell
  • No street view available for this location

New bridges in Caldwell, ID - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 71930-1939
  • 31940-1949
  • 21950-1959
  • 221960-1969
  • 101970-1979
  • 141980-1989
  • 61990-1999
  • 142000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in Caldwell, ID - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Caldwell, ID
Average Bridge Truck Traffic in Caldwell, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.4%Excellent
  • 8.7%Very good
  • 30.4%Good
  • 43.5%Satisfactory
  • 13.0%Fair
  • 2.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.4%Excellent
  • 15.9%Very good
  • 21.7%Good
  • 42.0%Satisfactory
  • 11.6%Fair
  • 7.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.4%Excellent
  • 17.4%Very good
  • 24.6%Good
  • 36.2%Satisfactory
  • 15.9%Fair
  • 4.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.1%Excellent
  • 21.9%Very good
  • 42.2%Good
  • 18.8%Satisfactory
  • 3.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1218,  Location: IN CALDWELL (Lat: 43.672817,  Lng: -116.696111),  Route carried "on" structure: Business Interstate 84,  Year Built: 1983,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 22,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,000 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: UPRR;INDIAN CR;CALDWELL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.335,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: IB0,  Subroute: 9),  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12185,  Location: IN CALDWELL (Lat: 43.680000,  Lng: -116.689444),  Route carried "on" structure: Business Interstate 84,  Year Built: 1983,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 12,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,000 (year 2039),  Design Load: HS 20,  Features Intersected: I 84;NW CALDWELL IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.386,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: IB0,  Subroute: 9),  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.5m (159.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12195,  Location: IN CALDWELL;BLAINE & 7TH (Lat: 43.665556,  Lng: -116.689722),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 9,300 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,950 (year 2039),  Design Load: HS 20,  Features Intersected: OLD INDIAN CREEK CHANNEL,  Facility Carried by Structure: BLAINE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.702,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12215,  Location: 1 NW CALDWELL CL (Lat: 43.689750,  Lng: -116.695417),  Route carried "on" structure: US 20,  Year Built: 1964,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HS 20,  Features Intersected: FARMERS COOP CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.331,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1222,  Location: 0.7 W. CALDWELL NWCL (Lat: 43.690222,  Lng: -116.693333),  Route carried "on" structure: US 20,  Year Built: 1964,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 5,600 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 8,400 (year 2039),  Design Load: HS 20,  Features Intersected: I 84 EB-WB;PARMA IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.505,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $2,455,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $3,683,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12226,  Location: AT CALDWELL ECL (Lat: 43.662778,  Lng: -116.660556),  Route carried "on" structure: US 20,  Year Built: 2008,  Status: Open,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 15,500 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,250 (year 2039),  Design Load: HL 93,  Features Intersected: I 84;FRANKLIN RD IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.050,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.7m (163.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 31.5m (103.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1224,  Location: 3.6 E. CALDWELL (Lat: 43.663139,  Lng: -116.609056),  Route carried "on" structure: US 20,  Year Built: 1947,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 12,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,000 (year 2039),  Design Load: HS 20,  Features Intersected: MASON DRAIN DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.204,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12245,  Location: 5.2 E. CALDWELL (Lat: 43.663214,  Lng: -116.577111),  Route carried "on" structure: US 20,  Year Built: 1947,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 11,500 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,250 (year 2039),  Design Load: HS 20,  Features Intersected: TEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.782,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1225,  Location: 5.6 E. CALDWELL (Lat: 43.663222,  Lng: -116.568694),  Route carried "on" structure: US 20,  Year Built: 1947,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 14,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,000 (year 2039),  Design Load: HS 20,  Features Intersected: HIGH LINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.467,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1426,  Location: 1.9 W. CALDWELL (Lat: 43.705889,  Lng: -116.699806),  Route carried "on" structure: State highway 44,  Year Built: 1964,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 35,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 52,500 (year 2039),  Design Load: HS 20,  Features Intersected: I 84 EB-WB;MIDDLETON IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.063,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: SH0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $2,660,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $3,990,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14705,  Location: 3.5 W. NAMPA (Lat: 43.604417,  Lng: -116.674194),  Route carried "on" structure: State highway 55,  Year Built: 1973,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 18,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 27,000 (year 2039),  Design Load: HS 20,  Features Intersected: DEER FLAT CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.180,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: SH0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $356,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1471,  Location: 3 W. NAMPA (Lat: 43.604500,  Lng: -116.663694),  Route carried "on" structure: State highway 55,  Year Built: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 18,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 27,000 (year 2039),  Design Load: HS 20,  Features Intersected: PHYLLIS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.034,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: SH0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14715,  Location: 2 W. NAMPA (Lat: 43.604722,  Lng: -116.644444),  Route carried "on" structure: State highway 55,  Year Built: 1973,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 17,000 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,500 (year 2039),  Design Load: HS 20,  Features Intersected: WILSON DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.621,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: SH0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1545,  Location: 3.3 W. CALDWELL (Lat: 43.735575,  Lng: -116.709183),  Route carried "on" structure: Interstate 84,  Year Built: 1962,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 13,250 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,875 (year 2039),  Design Load: HS 20,  Features Intersected: PURPLE SAGE GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.606,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15455,  Location: 3.3 W. CALDWELL (Lat: 43.735369,  Lng: -116.708719),  Route carried "on" structure: Interstate 84,  Year Built: 1962,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 13,250 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 19,875 (year 2039),  Design Load: HS 20,  Features Intersected: PURPLE SAGE GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.604,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15465,  Location: 1.0 W. CALDWELL (Lat: 43.702797,  Lng: -116.699411),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 18,750 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 28,125 (year 2039),  Design Load: H 20,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.356,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1548,  Location: IN CALDWELL (Lat: 43.685844,  Lng: -116.690275),  Route carried "on" structure: Interstate 84,  Year Built: 1980,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 44,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 66,750 (year 2039),  Design Load: HS 20,  Features Intersected: FARMERS SEBREE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.404,  Lanes on structure: 6,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 32.0m (105.0ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 32.2m (105.6ft),  Out-to-Out Width: 39.9m (130.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1549,  Location: IN CALDWELL (Lat: 43.681389,  Lng: -116.689722),  Route carried "on" structure: Interstate 84,  Year Built: 1983,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 44,500 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 66,750 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BOISE RIVER;CALDWELL BR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.907,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2018,  Underwater Inspection Date: August 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15505,  Location: IN CALDWELL;10TH AVE (Lat: 43.671056,  Lng: -116.678472),  Route carried "on" structure: Interstate 84,  Year Built: 1983,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 51,500 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 77,250 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: STP 7773;10TH AVE IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.399,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 33 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 33.9m (111.2ft),  Out-to-Out Width: 34.8m (114.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15535,  Location: IN CALDWELL;E.LINDEN RD (Lat: 43.648417,  Lng: -116.650361),  Route carried "on" structure: Interstate 84,  Year Built: 1966,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 30,250 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 45,375 (year 2039),  Design Load: HS 20,  Features Intersected: SMA 7923;LINDEN ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.929,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.3m (40.4ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1554,  Location: IN CALDWELL;E.LINDEN RD (Lat: 43.648125,  Lng: -116.649719),  Route carried "on" structure: Interstate 84,  Year Built: 1966,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 30,250 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 45,375 (year 2039),  Design Load: HS 20,  Features Intersected: SMA 7923;LINDEN ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.945,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.3m (40.4ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15545,  Location: IN CALDWELL (Lat: 43.634994,  Lng: -116.633461),  Route carried "on" structure: Interstate 84,  Year Built: 1966,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 30,250 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 45,375 (year 2039),  Design Load: HS 20,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.965,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 1555,  Location: IN CALDWELL (Lat: 43.634583,  Lng: -116.633389),  Route carried "on" structure: Interstate 84,  Year Built: 1966,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 30,250 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 45,375 (year 2039),  Design Load: HS 20,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.023,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: I,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 16595,  Location: IN CALDWELL (Lat: 43.681194,  Lng: -116.690333),  Route carried "on" structure: Ramp Interstate 84,  Year Built: 1980,  Status: Open,  Structure Length: 12.28m (40.29ft),  Average Daily Traffic: 3,000 (year 2019),  Average Future Daily Traffic: 4,500 (year 2039),  Design Load: HS 20,  Features Intersected: BOISE RIVER;RAMP AB BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.296,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.11m (43.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $2,980,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $4,470,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1969,  Location: 1.8 N. 3.3 E. MARSING (Lat: 43.573139,  Lng: -116.747833),  Route carried "on" structure: County highway 3730,  Year Built: 1986,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 740 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,110 (year 2039),  Design Load: HS 20,  Features Intersected: DEER FLAT HIGH LINE CNL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.880,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19696,  Location: 3.3 N. 8.0 E. MARSING (Lat: 43.593944,  Lng: -116.652972),  Route carried "on" structure: County highway 3734,  Year Built: 1995,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,900 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,850 (year 2039),  Design Load: HS 20,  Features Intersected: PHYLLIS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.176,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19715,  Location: 4.0 S. 0.3 E. MIDDLETON (Lat: 43.648444,  Lng: -116.613278),  Route carried "on" structure: County highway 8213,  Year Built: 1950,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 8,900 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,350 (year 2039),  Design Load: HS 20,  Features Intersected: CALDWELL HIGHLINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.994,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $512,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2174,  Location: 1.9 S. 1.3 W. CALDWELL (Lat: 43.637222,  Lng: -116.713111),  Route carried "on" structure: County highway 7713,  Year Built: 1967,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,600 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 8,400 (year 2039),  Design Load: HS 20,  Features Intersected: PHYLLIS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.406,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2176,  Location: IN CALDWELL;10TH AVE (Lat: 43.666056,  Lng: -116.683556),  Route carried "on" structure: City street 7773,  Year Built: 1956,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 18.93m (62.11ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: CITY ST;UPRR;CALDWELL OP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.070,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: IB0,  Subroute: 3),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 19.81m (64.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $6,821,000,  Roadway Improvement Cost: $682,000,  Total Project Cost: $10,232,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21766,  Location: IN CALDWELL; 10TH AVE (Lat: 43.663972,  Lng: -116.685944),  Route carried "on" structure: City street 7773,  Year Built: 2020,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,500 (year 2040),  Design Load: HL 93,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.535,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2177,  Location: IN CALDWELL (Lat: 43.677694,  Lng: -116.698306),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,500 (year 2039),  Design Load: HS 20,  Features Intersected: BOISE RIVER,  Facility Carried by Structure: CHICAGO ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.934,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21776,  Location: IN CALDWELL;FRANKLIN RD (Lat: 43.662528,  Lng: -116.665667),  Route carried "on" structure: City street 7933,  Year Built: 2009,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 17,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 25,500 (year 2039),  Design Load: HL 93,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: 79,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 48.5m (159.1ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019
Find on map >>   Show street view

Structure Number: 2178,  Location: IN CALDWELL;N.ILLINOIS AV (Lat: 43.682778,  Lng: -116.678250),  Route carried "on" structure: City street 7853,  Year Built: 1977,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,000 (year 2039),  Design Load: HS 20,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $660,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 218,  Location: IN CALDWELL;E.LINDEN RD (Lat: 43.648306,  Lng: -116.648167),  Route carried "on" structure: City street 7923,  Year Built: 1968,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HS 20,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.869,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $368,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21806,  Location: IN CALDWELL;21ST AVE (Lat: 43.658500,  Lng: -116.671694),  Route carried "on" structure: City street 7933,  Year Built: 2009,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HL 93,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.517,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: 79,  Subroute: 2),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21815,  Location: AT CALDWELL SECL;USTICK (Lat: 43.633958,  Lng: -116.633331),  Route carried "on" structure: City street 7983,  Year Built: 1966,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 8,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,750 (year 2039),  Design Load: HS 20,  Features Intersected: NOTUS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.229,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 79,  Subroute: 3),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $847,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,271,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21817,  Location: 0.3 E 0.3 S CALDWELL (Lat: 43.656389,  Lng: -116.653056),  Route carried "on" structure: City street 7993,  Year Built: 2009,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,500 (year 2019),  Average Future Daily Traffic: 2,250 (year 2039),  Design Load: HL 93,  Features Intersected: CANYON HILL LATERAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.385,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 26725,  Location: CALDWELL NCL (Lat: 43.688972,  Lng: -116.686250),  Route carried "on" structure: County highway 7787,  Year Built: 1922,  Status: Open,  Structure Length: 11.83m (38.81ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,800 (year 2039),  Design Load: H 15,  Features Intersected: BOISE RIVER & CANAL
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 1.127,  Lanes on structure: 1,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,367,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $3,551,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26785,  Location: 2.7 S. 5.4 E. NOTUS (Lat: 43.686556,  Lng: -116.689139),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SEBREE CANAL,  Facility Carried by Structure: TOWN CIRCLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.259,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Caldwell, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.