Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Belleville, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 88Number of bridges
  • 807ft / 246mTotal length
  • $489,982,000Total costs
  • 745,350Total average daily traffic
  • 51,500Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Belleville
  • No street view available for this location

New bridges in Belleville, IL - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 21900-1909
  • 31920-1929
  • 51940-1949
  • 251950-1959
  • 81960-1969
  • 21970-1979
  • 31980-1989
  • 201990-1999
  • 62000-2009
  • 122010-2019
Reconstructed bridges in Belleville, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 81980-1989
  • 31990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Belleville, IL
Average Bridge Truck Traffic in Belleville, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.3%Excellent
  • 34.1%Very good
  • 36.4%Good
  • 20.5%Satisfactory
  • 6.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 43.2%Very good
  • 22.7%Good
  • 20.5%Satisfactory
  • 6.8%Fair
  • 2.3%Poor
  • 4.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.3%Excellent
  • 47.7%Very good
  • 36.4%Good
  • 6.8%Satisfactory
  • 4.5%Fair
  • 2.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.9%Excellent
  • 22.0%Very good
  • 24.4%Good
  • 31.7%Satisfactory
  • 17.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 50.0%Good
  • 16.7%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 820041,  Location: .70MI E JCT IL 157 (Lat: 38.559747,  Lng: -90.082850),  Route carried "on" structure: State highway 15,  Year Built: 1940,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 28,400 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 36,610 (year 2032),  Design Load: HS 20,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.525,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 19.9m (65.3ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820043,  Location: S BELLEVILLE (Lat: 38.505531,  Lng: -90.001225),  Route carried "on" structure: State highway 15,  Year Built: 1958,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 20,100 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,383 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 158
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.923,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 90.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820044,  Location: S BELLEVILLE (Lat: 38.505472,  Lng: -90.001094),  Route carried "on" structure: State highway 15,  Year Built: 1958,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 20,000 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,337 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 158
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.939,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 90.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820047,  Location: 0.30MI S IL 158&177 (Lat: 38.498186,  Lng: -89.983789),  Route carried "on" structure: State highway 15,  Year Built: 1957,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,002 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 159
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.581,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820048,  Location: 0.32MI S IL 158&177 (Lat: 38.498283,  Lng: -89.984025),  Route carried "on" structure: State highway 15,  Year Built: 1957,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 20,000 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,337 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 159
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.549,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820049,  Location: 1.0 M E JCT ILL 159 (Lat: 38.492933,  Lng: -89.967497),  Route carried "on" structure: State highway 15,  Year Built: 1956,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 10.55m (34.61ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,002 (year 2032),  Design Load: H 20,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.190,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 10.45m (34.28ft),  Designated Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $946,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82005,  Location: 1.0 M E JCT ILL 159 (Lat: 38.492775,  Lng: -89.966942),  Route carried "on" structure: State highway 15,  Year Built: 1956,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,002 (year 2032),  Design Load: H 20,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.238,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.45m (34.28ft),  Designated Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $864,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $950,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820053,  Location: 1.7 M E JCT ILL 159 (Lat: 38.488383,  Lng: -89.955197),  Route carried "on" structure: State highway 13,  Year Built: 1955,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 11,800 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,420 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB TO RICHLAND CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.640,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820054,  Location: 1.7 M E JCT ILL 159 (Lat: 38.488294,  Lng: -89.955081),  Route carried "on" structure: State highway 13,  Year Built: 1955,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 11,800 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,420 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB TO RICHLAND CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820056,  Location: 1.5 mi E of IL 159 (Lat: 38.504906,  Lng: -89.955606),  Route carried "on" structure: State highway 158,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 6,450 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,048 (year 2032),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.045,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82009,  Location: SW BELLEVILLE (Lat: 38.548500,  Lng: -90.067642),  Route carried "on" structure: Other road ,  Year Built: 1957,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 6,050 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,280 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 15 WB,  Facility Carried by Structure: Ramp to IL 13 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.0m (85.3ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820102,  Location: 1MI SO. ST CLAIR AVE (Lat: 38.583094,  Lng: -90.040094),  Route carried "on" structure: State highway 161,  Year Built: 2007,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 12,800 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,263 (year 2032),  Design Load: HS 20,  Features Intersected: SCHOENBERGER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.9m (124.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820103,  Location: IMI SO. ST CLAIR AVE (Lat: 38.583228,  Lng: -90.040169),  Route carried "on" structure: State highway 161,  Year Built: 2007,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 12,800 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,263 (year 2032),  Design Load: HS 20,  Features Intersected: SCHOENBERGER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.221,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.9m (124.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820109,  Location: 1.5 M E JCT 13 (Lat: 38.525014,  Lng: -90.036067),  Route carried "on" structure: Other road ,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 9,650 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,820 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 15,  Facility Carried by Structure: FRANK SCOTT PKWY W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.812,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 820114,  Location: 1 M E CENTREVILLE (Lat: 38.553831,  Lng: -90.091733),  Route carried "on" structure: State highway 13,  Year Built: 1929,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,550 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,923 (year 2032),  Design Load: HS 20,  Features Intersected: POWDER MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.5m (31.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820115,  Location: SW BELLEVILLE (Lat: 38.546189,  Lng: -90.065061),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 7.03m (23.06ft),  Average Daily Traffic: 7,950 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,989 (year 2032),  Design Load: HS 20,  Features Intersected: ILL 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.200,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.4m (70.2ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Other Special Inspection Date: April 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820116,  Location: SW BELLEVILLE (Lat: 38.546908,  Lng: -90.060406),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Year Reconstructed: 1991,  Status: Closed,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 7,900 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,995 (year 2032),  Design Load: HS 20,  Features Intersected: Ramp from EB IL 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.0m (72.2ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820117,  Location: 1.3 M E JCT IL 159 (Lat: 38.491011,  Lng: -89.960850),  Route carried "on" structure: State highway 15,  Year Built: 2015,  Status: Open,  Structure Length: 10.72m (35.17ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,888 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: IC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 61.3m (201.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820118,  Location: 1.3 M E JCT IL 159 (Lat: 38.491039,  Lng: -89.960947),  Route carried "on" structure: State highway 15,  Year Built: 2015,  Status: Open,  Structure Length: 10.72m (35.17ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,002 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: IC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.753,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 61.3m (201.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820119,  Location: 1.4 M E JCT IL 159 (Lat: 38.490567,  Lng: -89.959356),  Route carried "on" structure: State highway 13,  Year Built: 2015,  Status: Open,  Structure Length: 3.97m (13.02ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,888 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: IL 13 / Charles St,  Facility Carried by Structure: IL 15 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.222,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82012,  Location: 1.4 M E JCT IL 159 (Lat: 38.490636,  Lng: -89.959569),  Route carried "on" structure: State highway 15,  Year Built: 2015,  Status: Open,  Structure Length: 3.97m (13.02ft),  Average Daily Traffic: 11,900 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,002 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: IL 13 / Charles St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.882,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820147,  Location: 0.20M N OF IL 177 (Lat: 38.507353,  Lng: -89.928439),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 17,800 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,619 (year 2032),  Design Load: HS 20,  Features Intersected: LOOP CREEK,  Facility Carried by Structure: GREEN MT RD-FAU 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.414,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820265,  Location: IN BELLEVILLE (Lat: 38.521753,  Lng: -89.984147),  Route carried "on" structure: State highway 159,  Year Built: 1923,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 11,200 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,083 (year 2032),  Design Load: HS 20,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.163,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.3m (43.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $1,104,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 820277,  Location: 0.2 M W SHILOH RD (Lat: 38.532858,  Lng: -89.973175),  Route carried "on" structure: State highway 161,  Year Built: 1990,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 20,500 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,313 (year 2032),  Design Load: HS 20,  Features Intersected: SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.008,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82029,  Location: 1 MI S US 50 (Lat: 38.571603,  Lng: -90.035950),  Route carried "on" structure: State highway 161,  Year Built: 1992,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 12,800 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,263 (year 2032),  Design Load: HS 20,  Features Intersected: DUTCH HOL/METRO/CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.444,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.1m (95.5ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820291,  Location: 1 MI S OF US 50 (Lat: 38.571717,  Lng: -90.035967),  Route carried "on" structure: State highway 161,  Year Built: 1992,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 12,800 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,263 (year 2032),  Design Load: HS 20,  Features Intersected: DUTCH HOL/METRO/CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.428,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.1m (95.5ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820297,  Location: 0.5M E OF IL 158 (Lat: 38.502653,  Lng: -89.994397),  Route carried "on" structure: State highway 15,  Year Built: 1995,  Status: Open,  Structure Length: 4.31m (14.14ft),  Average Daily Traffic: 20,000 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,337 (year 2032),  Design Load: HS 20,  Features Intersected: STATE ST/FAU 9281
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.583,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 65.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820298,  Location: 0.5 M E IL 158 (Lat: 38.502569,  Lng: -89.994200),  Route carried "on" structure: State highway 15,  Year Built: 1995,  Status: Open,  Structure Length: 4.31m (14.14ft),  Average Daily Traffic: 20,000 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,337 (year 2032),  Design Load: HS 20,  Features Intersected: STATE ST/FAU 9281
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.599,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 65.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820371,  Location: 300 feet S of IL 15 (Lat: 38.504994,  Lng: -90.001689),  Route carried "on" structure: State highway 158,  Year Built: 2013,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 8,950 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,414 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BR of Richland Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.732,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 4.7m (15.4ft),  Right: 0.0m,  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820398,  Location: 3MI WEST OF 158 (Lat: 38.504947,  Lng: -89.921322),  Route carried "on" structure: State highway 158,  Year Built: 2007,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 6,350 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,525 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: LOOP CREEK,  Facility Carried by Structure: IL 177
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.038,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 822001,  Location: W OF ILL 159 (Lat: 38.497961,  Lng: -89.985011),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 6,000 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,067 (year 2032),  Design Load: HS 20,  Features Intersected: BR OF RICHLAND CR,  Facility Carried by Structure: ILL 15 EB TO ILL 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: 20103041,  Subroute: 90),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 822002,  Location: E OF ILL 159 (Lat: 38.498486,  Lng: -89.982483),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,100 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,412 (year 2032),  Design Load: HS 20,  Features Intersected: BR OF RICHLAND CR,  Facility Carried by Structure: ILL 15 WB TO ILL 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 1,  Base Highway Network: Yes (Inventory Route: 20103041,  Subroute: 80),  Owner: State Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 96.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 822004,  Location: at IL 13/158/177 INT (Lat: 38.502067,  Lng: -89.984256),  Route carried "on" structure: State highway 159,  Year Built: 1955,  Status: Open,  Structure Length: 4.38m (14.37ft),  Average Daily Traffic: 14,600 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,292 (year 2032),  Design Load: HS 20,  Features Intersected: BR RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.975,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 822005,  Location: under IL 15 bridges (Lat: 38.498289,  Lng: -89.983800),  Route carried "on" structure: State highway 159,  Year Built: 1967,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 14,600 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,292 (year 2032),  Design Load: HS 20,  Features Intersected: BR RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.524,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 82203,  Location: 300' NW DUTCH HOLLOW (Lat: 38.562750,  Lng: -90.029911),  Route carried "on" structure: State highway 161,  Year Built: 1993,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 13,400 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,897 (year 2032),  Design Load: HS 20,  Features Intersected: Schoenberger Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.747,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 822042,  Location: 1.6 M SE IL 158& 177 (Lat: 38.488086,  Lng: -89.956542),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 450 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 575 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB TO RICHLAND CRK,  Facility Carried by Structure: IL 13 EB TO IL 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 20103041,  Subroute: 20),  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 822043,  Location: .85 MI E. GREENMOUNT (Lat: 38.473567,  Lng: -89.924011),  Route carried "on" structure: State highway 13,  Year Built: 2009,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 11,600 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,062 (year 2032),  Design Load: HS 20,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: IL 15 FAP 103
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.004,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 822525,  Location: 2 MI NW OF IL 159 (Lat: 38.510117,  Lng: -90.012031),  Route carried "on" structure: State highway 15,  Year Built: 1959,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 20,600 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,439 (year 2032),  Design Load: HS 20,  Features Intersected: RR TUNNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.845,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Culverts: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 82253,  Location: 200' NW OF IL 161 (Lat: 38.519247,  Lng: -89.945625),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 9,250 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,029 (year 2032),  Design Load: HS 20,  Features Intersected: EAST TRIB TO LOOP CR,  Facility Carried by Structure: WEST BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 67.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 823062,  Location: 1.25 MI S ILL 13-460 (Lat: 38.459342,  Lng: -89.939139),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 525 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 732 (year 2032),  Design Load: HS 20,  Features Intersected: SUGAR CR,  Facility Carried by Structure: OLD FREEBURG CH 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.895,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018
Discuss Belleville, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.