Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wheeling, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 155Number of bridges
  • 3,885ft / 1,184mTotal length
  • $126,404,000Total costs
  • 1,769,120Total average daily traffic
  • 407,770Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wheeling
  • No street view available for this location

New bridges in Wheeling, WV - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 21900-1909
  • 41920-1929
  • 11930-1939
  • 31940-1949
  • 121950-1959
  • 351960-1969
  • 591970-1979
  • 191980-1989
  • 41990-1999
  • 62000-2009
  • 52010-2019
  • 22020-2022
Reconstructed bridges in Wheeling, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11910-1919
  • 01920-1929
  • 01930-1939
  • 11940-1949
  • 01950-1959
  • 21960-1969
  • 21970-1979
  • 31980-1989
  • 41990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Truck Traffic in Wheeling, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.4%Excellent
  • 9.9%Very good
  • 36.6%Good
  • 16.9%Satisfactory
  • 26.8%Fair
  • 8.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.8%Very good
  • 29.7%Good
  • 9.5%Satisfactory
  • 32.4%Fair
  • 14.9%Poor
  • 1.4%Serious
  • 1.4%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.2%Very good
  • 15.1%Good
  • 24.7%Satisfactory
  • 34.2%Fair
  • 15.1%Poor
  • 2.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.8%Excellent
  • 30.9%Very good
  • 21.8%Good
  • 23.6%Satisfactory
  • 16.4%Fair
  • 5.5%Poor
Find on map >>   Show street view

Structure Number: 26A021,  Location: 0.14 mi. South jct CR 18 (Lat: 40.004000,  Lng: -80.641969),  Route carried "on" structure: County highway 5,  Year Built: 1980,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 323 (year 2017),  Truck Traffic: 14%,  Average Future Daily Traffic: 462 (year 2037),  Design Load: HS 20,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.127,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $117,000,  Total Project Cost: $117,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26A022,  Location: 0.28 mi. North jct CR 18 (Lat: 40.008389,  Lng: -80.637969),  Route carried "on" structure: County highway 5,  Year Built: 1936,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,520 (year 2039),  Features Intersected: Grandstaff Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.803,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $380,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26A023,  Location: 0.79 mi. South jct CR88/1 (Lat: 40.013189,  Lng: -80.652639),  Route carried "on" structure: County highway 5,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,240 (year 2039),  Features Intersected: Britt Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.445,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $471,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26A03,  Location: 0.78 mi. East jct CR5 (Lat: 39.982469,  Lng: -80.619161),  Route carried "on" structure: County highway 16,  Year Built: 1987,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 203 (year 2040),  Design Load: HS 20,  Features Intersected: Bruce Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $290,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26A1,  Location: 0.04 mi. South jct CR16 (Lat: 39.975731,  Lng: -80.630600),  Route carried "on" structure: County highway 5,  Year Built: 2003,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 366 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Big Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.720,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26A12,  Location: 0.01 MI. SOUTH OF CO 21 (Lat: 40.027011,  Lng: -80.652719),  Route carried "on" structure: County highway 5,  Year Built: 2015,  Status: Open,  Structure Length: 6.94m (22.77ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,240 (year 2039),  Design Load: HL 93,  Features Intersected: BIG WHEELING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.617,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26A126,  Location: County Route 5 (Lat: 39.994289,  Lng: -80.634681),  Route carried "on" structure: County highway 5,  Year Built: 2019,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 429 (year 2040),  Design Load: HL 93,  Features Intersected: Big Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.405,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.84m (22.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A003,  Location: 0.60 mi. East jct US40 (Lat: 40.073731,  Lng: -80.713769),  Route carried "on" structure: Ramp Interstate 70,  Year Built: 1966,  Status: Open,  Structure Length: 31.47m (103.25ft),  Average Daily Traffic: 8,017 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 12,827 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: I-70 Ramp E,  Facility Carried by Structure: Ramp E to US 250 S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.317,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 41.3m (135.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 31.49m (103.31ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $1,395,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $1,755,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A005,  Location: Junction US 250 & I70 WB (Lat: 40.073481,  Lng: -80.714231),  Route carried "on" structure: Ramp Interstate 70,  Year Built: 1966,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 3,200 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Vacant Lot,  Facility Carried by Structure: US 250 Northbound
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 2.124,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.3m (99.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.07m (19.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $200,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A006,  Location: Junction US 250 & I 70 EB (Lat: 40.073281,  Lng: -80.711889),  Route carried "on" structure: Ramp Interstate 70,  Year Built: 1966,  Status: Open,  Structure Length: 12.87m (42.22ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 3,200 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,012,000,  Roadway Improvement Cost: $880,000,  Total Project Cost: $3,773,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A008,  Location: 0.60 mi. East jct WV 2 (Lat: 40.123700,  Lng: -80.688961),  Route carried "on" structure: County highway 3,  Year Built: 1992,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,800 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,430 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Glenns Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.5m (34.4ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $24,000,  Total Project Cost: $24,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A009,  Location: 0.01 MI EAST JCT CR 1 (Lat: 40.125939,  Lng: -80.639319),  Route carried "on" structure: County highway 7,  Year Built: 1989,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 1,100 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,485 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SHORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.582,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $270,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A013,  Location: 1.07 mi. East jct WV88 (Lat: 40.089661,  Lng: -80.668531),  Route carried "on" structure: County highway 15,  Year Built: 1926,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,584 (year 2040),  Features Intersected: Waddles Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $45,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A017,  Location: 0.04 mi. North jct CR88/2 (Lat: 40.034489,  Lng: -80.657319),  Route carried "on" structure: County highway 21,  Year Built: 1970,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 13,600 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,592 (year 2039),  Design Load: H 20,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.143,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $235,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A018,  Location: 0.01 mi. South jct CR25/1 (Lat: 40.066589,  Lng: -80.638811),  Route carried "on" structure: County highway 25,  Year Built: 1926,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,200 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,320 (year 2039),  Features Intersected: Browns Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.157,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.1m (26.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $494,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A032,  Location: 0.09 mi. East jct US 40 (Lat: 40.074311,  Lng: -80.700961),  Route carried "on" structure: Spur US 40,  Year Built: 1958,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 10,300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,566 (year 2040),  Design Load: HS 20,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $613,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A033,  Location: 0.02 mi. East jct I-70 (Lat: 40.072469,  Lng: -80.722950),  Route carried "on" structure: US 40,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.43m (14.53ft),  Average Daily Traffic: 7,900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,297 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: Interstate 70 WB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $212,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A036,  Location: 0.05 Mi. West Jct. WV 88 (Lat: 40.043761,  Lng: -80.658650),  Route carried "on" structure: US 40,  Year Built: 1817,  Year Reconstructed: 1922,  Status: Posted for load,  Structure Length: 5.93m (19.46ft),  Average Daily Traffic: 12,800 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,616 (year 2040),  Features Intersected: Little Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.702,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,050,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A059,  Location: 0.35 mi. West jct US 40 (Lat: 40.071219,  Lng: -80.738100),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Status: Open,  Structure Length: 73.45m (240.98ft),  Average Daily Traffic: 30,400 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 48,640 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Ohio River/City Streets
Minimum Vertical Clearance: 6.88m (22.57ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 27,  Length of Maximum Span: 80.5m (264.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 73.46m (241.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: July 2017,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $6,940,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $6,980,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A061,  Location: 0.36 MI W OF JCT WV 2 S (Lat: 40.072000,  Lng: -80.726911),  Route carried "on" structure: Interstate 70,  Year Built: 1955,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 50.60m (166.01ft),  Average Daily Traffic: 23,000 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 36,800 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: OHIO RIVER & N FRONT ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.644,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 23.8m (78.1ft), Horizontal Clearance: 169.2m (555.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 176.0m (577.4ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 50.60m (166.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $18,010,000,  Roadway Improvement Cost: $1,802,000,  Total Project Cost: $25,648,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A063,  Location: 0.35 Mi. East Jct. US 40 (Lat: 40.073489,  Lng: -80.714769),  Route carried "on" structure: Interstate 70,  Year Built: 1966,  Status: Open,  Structure Length: 37.60m (123.36ft),  Average Daily Traffic: 24,550 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 39,280 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek & City St
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.58m (123.29ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $2,208,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $2,583,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A066,  Location: 1.08 mi. East jct US40 (Lat: 40.073919,  Lng: -80.701611),  Route carried "on" structure: Interstate 70,  Year Built: 1965,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 13.54m (44.42ft),  Average Daily Traffic: 21,480 (year 2017),  Truck Traffic: 28%,  Average Future Daily Traffic: 34,370 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek/WB Ramps
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.090,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.53m (44.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $533,000,  Total Project Cost: $533,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A067,  Location: 1.08 mi. East jct US 40 (Lat: 40.073800,  Lng: -80.701939),  Route carried "on" structure: Interstate 70,  Year Built: 1965,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 14.07m (46.16ft),  Average Daily Traffic: 12,000 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 19,200 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek/WB Ramps
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.090,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.08m (46.19ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $554,000,  Total Project Cost: $554,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A068,  Location: 1.33 mi. East jct US40 (Lat: 40.071731,  Lng: -80.698839),  Route carried "on" structure: Interstate 70,  Year Built: 1958,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 4.01m (13.16ft),  Average Daily Traffic: 16,120 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 25,792 (year 2018),  Design Load: HS 20+Mod,  Features Intersected: Mt. deChantal Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.492,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.2m (56.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.08m (131.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,207,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $4,014,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 35A069,  Location: 1.33 mi. East jct US 40 (Lat: 40.071500,  Lng: -80.699061),  Route carried "on" structure: Interstate 70,  Year Built: 1958,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 24,180 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 38,688 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Mt. deChantal Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.492,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $366,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 35A071,  Location: 1.21 mi. West jct US40 (Lat: 40.059511,  Lng: -80.682181),  Route carried "on" structure: Interstate 70,  Year Built: 1958,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 9.55m (31.33ft),  Average Daily Traffic: 13,600 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 26,080 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.649,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A072,  Location: 1.21 mi. West jct US40 (Lat: 40.059169,  Lng: -80.682269),  Route carried "on" structure: Interstate 70,  Year Built: 1958,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 9.44m (30.97ft),  Average Daily Traffic: 16,300 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 26,080 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.649,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.0m (134.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A073,  Location: 0.60 mi. West jct US 40 (Lat: 40.050139,  Lng: -80.665019),  Route carried "on" structure: Interstate 70,  Year Built: 1971,  Status: Open,  Structure Length: 20.18m (66.21ft),  Average Daily Traffic: 15,700 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 25,120 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US Route 40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.564,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 82.6m (271.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.18m (66.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $2,091,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A074,  Location: 0.60 mi. West jct US 40 (Lat: 40.049969,  Lng: -80.665289),  Route carried "on" structure: Interstate 70,  Year Built: 1971,  Status: Open,  Structure Length: 20.18m (66.21ft),  Average Daily Traffic: 15,700 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 25,120 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US Route 40
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 7.564,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 82.6m (271.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.18m (66.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,266,000,  Roadway Improvement Cost: $825,000,  Total Project Cost: $2,091,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A075,  Location: Jct I-70 & US 40 (Lat: 40.044811,  Lng: -80.655739),  Route carried "on" structure: Interstate 70,  Year Built: 1970,  Status: Open,  Structure Length: 19.22m (63.06ft),  Average Daily Traffic: 20,100 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 32,160 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.417,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 48.0m (157.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.15m (69.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,500,000,  Total Project Cost: $4,375,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A076,  Location: Jct I-70 and US 40 (Lat: 40.045019,  Lng: -80.656719),  Route carried "on" structure: Interstate 70,  Year Built: 1970,  Status: Open,  Structure Length: 20.87m (68.47ft),  Average Daily Traffic: 20,100 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 32,160 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: Mid.Whg Crk, US40 Cty St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.417,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.88m (68.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $17,046,000,  Total Project Cost: $17,046,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35A083,  Location: 0.08 mi. South jct US 40 (Lat: 40.042881,  Lng: -80.659389),  Route carried "on" structure: State highway 88,  Year Built: 1948,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 8,700 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,441 (year 2039),  Design Load: HS 15,  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.571,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.92m (22.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $820,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 35A085,  Location: 0.02 mi. South jct WV2 (Lat: 40.063350,  Lng: -80.723450),  Route carried "on" structure: County highway 18,  Year Built: 1892,  Status: Posted for load,  Structure Length: 7.09m (23.26ft),  Average Daily Traffic: 5,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,466 (year 2040),  Features Intersected: Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.5m (159.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Superstructure: Fair,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $234,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A089,  Location: 0.01 mi East jct I-70 (Lat: 40.072469,  Lng: -80.723369),  Route carried "on" structure: Ramp US 250,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 12.61m (41.37ft),  Average Daily Traffic: 1,983 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,836 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: US 250
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.715,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.62m (41.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $534,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A09,  Location: 0.22 Mi. West Jct WV 2 SB (Lat: 40.070200,  Lng: -80.726739),  Route carried "on" structure: State highway 251,  Year Built: 1849,  Year Reconstructed: 1999,  Status: Closed,  Structure Length: 39.85m (130.74ft),  Average Daily Traffic: 5,234 (year 2016),  Average Future Daily Traffic: 6,615 (year 2035),  Features Intersected: Ohio River
Minimum Vertical Clearance: 2.29m (7.51ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Navigation Control: Yes ( Vertical Clearance: 22.6m (74.1ft), Horizontal Clearance: 30.2m (99.1ft)),  Material/Design: Steel,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 307.4m (1,008.5ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 39.84m (130.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: July 2017,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $5,740,000,  Roadway Improvement Cost: $574,000,  Total Project Cost: $6,315,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 35A095,  Location: 0.35 mi. East jct US 40 (Lat: 40.073489,  Lng: -80.712719),  Route carried "on" structure: Interstate 70,  Year Built: 1966,  Status: Open,  Structure Length: 37.17m (121.95ft),  Average Daily Traffic: 27,010 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 43,216 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Wheeling Creek & City St
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 42.8m (140.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 36.58m (120.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $3,528,000,  Roadway Improvement Cost: $635,000,  Total Project Cost: $4,163,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Discuss Wheeling, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.