Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Boylston, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 164ft / 50.0mTotal length
  • $42,153,000Total costs
  • 216,925Total average daily traffic
  • 18,907Total average daily truck traffic
  • 474,102Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Boylston
  • No street view available for this location

New bridges in West Boylston, MA - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 131970-1979
Average Bridge Daily Traffic in West Boylston, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 28.6%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Good
  • 23.5%Satisfactory
  • 64.7%Fair
  • 5.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 76.5%Good
  • 23.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: W170014CVDOTNBI,  Location: AT QUINEPOXET RIVER (Lat: 42.385025,  Lng: -71.797117),  Route carried "on" structure: City street ,  Year Built: 1904,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 5,820 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,192 (year 2031),  Features Intersected: WATER QUINAPOXET RIVER,  Facility Carried by Structure: HWY THOMAS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $1,279,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,919,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W170034CWDOTNBI,  Location: .2 MI E OF THOMAS ST. (Lat: 42.387117,  Lng: -71.790486),  Route carried "on" structure: State highway 140,  Year Built: 1904,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 9,214 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,370 (year 2032),  Design Load: H 20,  Features Intersected: WATER STILLWATER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 133.595,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $550,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $826,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W1700422TDOT634,  Location: .2 MI. S. OF LAUREL ST. (Lat: 42.388439,  Lng: -71.792497),  Route carried "on" structure: State highway 140,  Year Built: 1974,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 6,373 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,739 (year 2032),  Design Load: H 20,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $907,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170054CXDOTNBI,  Location: .3 MI NE OF B&M RR (Lat: 42.373933,  Lng: -71.778778),  Route carried "on" structure: State highway 12,  Year Built: 1904,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 10,557 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,269 (year 2031),  Features Intersected: WATER WACHUSETT RESERVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $802,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,204,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W1700622UDOT634,  Location: .1 MI E OF SHREWSBURY ST (Lat: 42.341761,  Lng: -71.770136),  Route carried "on" structure: City street ,  Year Built: 1908,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 150 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 237 (year 2031),  Design Load: HS 20,  Features Intersected: RR BMRR,  Facility Carried by Structure: HWY HARTWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,360,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,041,000 ( Estimate for 2022),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W170171X7DOTNBI,  Location: AT WORC. CITY LINE (Lat: 42.332856,  Lng: -71.799214),  Route carried "on" structure: Interstate 190,  Year Built: 1975,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 13,044 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 113,710 (year 2031),  Design Load: Railroad,  Features Intersected: HWY MALDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.195,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,585,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170171X8DOTNBI,  Location: AT CITY OF WORCESTER T.L. (Lat: 42.333117,  Lng: -71.799261),  Route carried "on" structure: Interstate 190,  Year Built: 1975,  Status: Open,  Structure Length: 3.98m (13.06ft),  Average Daily Traffic: 24,894 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 57,687 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY MALDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 81.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,924,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,887,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170221WXDOTNBI,  Location: .5 MILES WEST OF ST-12 (Lat: 42.335250,  Lng: -71.797831),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 18,077 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,586 (year 2031),  Design Load: HS 20,  Features Intersected: I 190 SB OFF RAMP N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.520,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,709,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $2,564,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170221WYDOTNBI,  Location: .5 MILES WEST OF ST-12 (Lat: 42.335331,  Lng: -71.798014),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 18,209 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,586 (year 2031),  Design Load: HS 20,  Features Intersected: I 190 SB OFF RAMP N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.520,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $991,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170231X0DOTNBI,  Location: .3 MI W OF ST-12 (Lat: 42.336883,  Lng: -71.797703),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 19,393 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,062 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 190 RAMP L (SB ON)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.552,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,572,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,359,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170231X1DOTNBI,  Location: .3 MI W. OF ST-12 (Lat: 42.336881,  Lng: -71.797950),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 19,681 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,062 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 190 RAMP L (SB ON)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.552,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,572,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,359,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170241X2DOTNBI,  Location: .3 MI W OF ST 12 (Lat: 42.336658,  Lng: -71.798614),  Route carried "on" structure: Ramp Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 6,907 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,055 (year 2032),  Design Load: HS 20,  Features Intersected: I 190 RAMP L SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170251X3DOTNBI,  Location: 200 FT. W. OF PHEASANT HL (Lat: 42.338453,  Lng: -71.798214),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 14,614 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,741 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY WOODLAND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.4m (83.3ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,585,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $3,878,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170251X4DOTNBI,  Location: 400 FT W OF PHEASNT HIL R (Lat: 42.338375,  Lng: -71.798378),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 15,842 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 19,741 (year 2032),  Design Load: HS 20,  Features Intersected: HWY WOODLAND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,677,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $4,016,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170261X5DOTNBI,  Location: 0.5 MI N OF EXIT 4 (Lat: 42.343361,  Lng: -71.802231),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 14,614 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,269 (year 2032),  Design Load: HS 20,  Features Intersected: HWY PROSPECT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.536,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 80.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,914,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170261X6DOTNBI,  Location: .8 MI WEST OF ST-12 (Lat: 42.343186,  Lng: -71.802314),  Route carried "on" structure: Interstate 190,  Year Built: 1979,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 15,036 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,269 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY PROSPECT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.536,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 80.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,914,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W170281X9DOTNBI,  Location: 1.5 MI S OF ST-140 (Lat: 42.388975,  Lng: -71.816489),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 4,500 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,527 (year 2031),  Design Load: HS 20,  Features Intersected: I 190,  Facility Carried by Structure: HWY LAUREL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,832,000,  Roadway Improvement Cost: $484,000,  Total Project Cost: $7,249,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss West Boylston, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.