Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Santa Paula, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 40Number of bridges
  • 456ft / 139mTotal length
  • 826,250Total average daily traffic
  • 70,683Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Santa Paula
  • No street view available for this location

New bridges in Santa Paula, CA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 31940-1949
  • 41950-1959
  • 271960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
Reconstructed bridges in Santa Paula, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Santa Paula, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 92.9%Good
  • 7.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 82.1%Good
  • 3.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.5%Excellent
  • 28.6%Very good
  • 14.3%Good
  • 4.8%Satisfactory
  • 33.3%Fair
  • 9.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 85.7%Good
  • 14.3%Satisfactory
Find on map >>   Show street view

Structure Number: 52 0029,  Location: 07-VEN-126-R13.57 (Lat: 34.363622,  Lng: -119.037994),  Route carried "on" structure: State highway 126,  Year Built: 1985,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 32,000 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 66,240 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: HAUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.570,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.8m (45.3ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0103,  Location: 07-VEN-150-28.48 (Lat: 34.427475,  Lng: -119.091892),  Route carried "on" structure: State highway 150,  Year Built: 1958,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.93m (6.33ft),  Average Daily Traffic: 3,150 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,600 (year 2041),  Design Load: HS 20,  Features Intersected: SISAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.480,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.1m (59.4ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 94.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 52 0104,  Location: 07-VEN-150-28.53 (Lat: 34.427381,  Lng: -119.091008),  Route carried "on" structure: State highway 150,  Year Built: 1958,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.25m (7.38ft),  Average Daily Traffic: 3,250 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,682 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA PAULA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.530,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.2m (69.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 92.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0105,  Location: 07-VEN-150-28.61 (Lat: 34.426739,  Lng: -119.089942),  Route carried "on" structure: State highway 150,  Year Built: 1969,  Status: Open,  Structure Length: 5.44m (17.85ft),  Average Daily Traffic: 3,150 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,600 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA PAULA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.610,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.0m (177.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0250L,  Location: 07-VEN-126-R7.81 (Lat: 34.313144,  Lng: -119.116936),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 25,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,370 (year 2041),  Design Load: HS 20,  Features Intersected: TODD BARRANCA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.810,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0250R,  Location: 07-VEN-126-R7.81 (Lat: 34.312986,  Lng: -119.116775),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 25,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,370 (year 2041),  Design Load: HS 20,  Features Intersected: TODD BARRANCA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.810,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0251,  Location: 07-VEN-126-R7.95 (Lat: 34.314181,  Lng: -119.114772),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 48,000 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 82,372 (year 2041),  Design Load: HS 20,  Features Intersected: VCY RY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.950,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 37 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 40.5m (132.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0252,  Location: 07-VEN-126-R8.91 (Lat: 34.322728,  Lng: -119.101489),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 1,400 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,614 (year 2041),  Design Load: HS 20,  Features Intersected: ROUTE 126,  Facility Carried by Structure: BRIGGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0254,  Location: 07-VEN-126-R10.04 (Lat: 34.333667,  Lng: -119.087150),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 51,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 85,833 (year 2041),  Design Load: HS 20,  Features Intersected: TODD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.040,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 52 0257L,  Location: 07-VEN-126-R11.37-SPA (Lat: 34.345444,  Lng: -119.068769),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 23,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 72,902 (year 2041),  Design Load: HS 20,  Features Intersected: PALM AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.370,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0257R,  Location: 07-VEN-126-R11.37-SPA (Lat: 34.345286,  Lng: -119.068619),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 23,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 26,415 (year 2041),  Design Load: HS 20,  Features Intersected: PALM AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.370,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0259L,  Location: 07-VEN-126-R11.79-SPA (Lat: 34.348894,  Lng: -119.062586),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 23,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,893 (year 2039),  Design Load: HS 20,  Features Intersected: EIGHTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.790,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0259R,  Location: 07-VEN-126-R11.79-SPA (Lat: 34.348714,  Lng: -119.062475),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 23,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,893 (year 2039),  Design Load: HS 20,  Features Intersected: EIGHTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.790,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0260R,  Location: 07-VEN-126-R12.04-SPA (Lat: 34.349867,  Lng: -119.058339),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 18,750 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,893 (year 2039),  Design Load: HS 20,  Features Intersected: ROUTE 150 (10TH ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.040,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0261L,  Location: 07-VEN-126-R12.29-SPA (Lat: 34.351467,  Lng: -119.054386),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 24,733 (year 2039),  Design Load: HS 20,  Features Intersected: TWELFTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.290,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0261R,  Location: 07-VEN-126-R12.29-SPA (Lat: 34.351267,  Lng: -119.054317),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,452 (year 2039),  Design Load: HS 20,  Features Intersected: TWELFTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.290,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0262,  Location: 07-VEN-126-R9.65 (Lat: 34.329481,  Lng: -119.091672),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 47,000 (year 2009),  Average Future Daily Traffic: 85,833 (year 2041),  Design Load: HS 20,  Features Intersected: ADAMS BARRANCA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.650,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 55.8m (183.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019
Find on map >>   Show street view

Structure Number: 52 0265,  Location: 07-VEN-126-R10.38-SPA (Lat: 34.337436,  Lng: -119.083083),  Route carried "on" structure: City street Z607,  Year Built: 1965,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 10,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,601 (year 2039),  Design Load: HS 20,  Features Intersected: ROUTE 126,  Facility Carried by Structure: PECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0267L,  Location: 07-VEN-126-R12.71-SPA (Lat: 34.354972,  Lng: -119.048564),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 68,812 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA PAULA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.710,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0267R,  Location: 07-VEN-126-R12.70-SPA (Lat: 34.354769,  Lng: -119.048478),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 18,250 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 68,812 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA PAULA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.700,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0291,  Location: 07-VEN-126-R8.52 (Lat: 34.318969,  Lng: -119.106742),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 48,000 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 82,372 (year 2041),  Design Load: HS 20,  Features Intersected: OUTLAND BARRANCA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.520,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 54.6m (179.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019
Find on map >>   Show street view

Structure Number: 52 0292,  Location: 07-VEN-126-R10.40-SPA (Lat: 34.337161,  Lng: -119.082542),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 37,500 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 52,829 (year 2041),  Design Load: HS 20,  Features Intersected: FARMERS IRRIGATION CHA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.400,  Lanes on structure: 6,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 45.7m (149.9ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019
Find on map >>   Show street view

Structure Number: 52 0292Y,  Location: 07-VEN-126-R10.40-SPA (Lat: 34.336328,  Lng: -119.081819),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,400 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,614 (year 2041),  Design Load: HS 20,  Features Intersected: FARMERS IRRIGATION CHA,  Facility Carried by Structure: ACACIA WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.400,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.2m (69.6ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019
Find on map >>   Show street view

Structure Number: 52 0293,  Location: 07-VEN-126-R10.89-SPA (Lat: 34.341203,  Lng: -119.075347),  Route carried "on" structure: State highway 126,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 37,500 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 52,829 (year 2041),  Design Load: HS 20,  Features Intersected: STECKEL BARRANCA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.890,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019
Find on map >>   Show street view

Structure Number: 52 0404,  Location: 07-VEN-150-28.92 (Lat: 34.423456,  Lng: -119.086006),  Route carried "on" structure: State highway 150,  Year Built: 1979,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 3,250 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,682 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: HILLSIDE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.920,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 3.0m (9.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52 0422,  Location: 07-VEN-126-T16.69-SPA (Lat: 34.378889,  Lng: -118.988583),  Route carried "on" structure: State highway 126,  Year Built: 1991,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 37,500 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 66,240 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SESPE RANCH UC #1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.690,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.2m (66.3ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52 0423,  Location: 07-VEN-126-18.53-SPA (Lat: 34.387997,  Lng: -118.959156),  Route carried "on" structure: State highway 126,  Year Built: 1991,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 37,500 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 66,240 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SESPE RANCH UC #2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.530,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.2m (66.3ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52C0009,  Location: 0.2 MI S/O SR 126 (Lat: 34.347747,  Lng: -119.051194),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 28.59m (93.80ft),  Average Daily Traffic: 2,900 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,699 (year 2038),  Design Load: HS 20,  Features Intersected: SANTA CLARA RIVER,  Facility Carried by Structure: S MOUNTAIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52C0053,  Location: EAST OF SR 150 (Lat: 34.389644,  Lng: -119.072447),  Route carried "on" structure: County highway ,  Year Built: 1941,  Status: Posted for load-capacity,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 620 (year 2038),  Features Intersected: SANTA PAULA CREEK,  Facility Carried by Structure: BRIDGE ROAD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: March 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52C0068,  Location: 0.8 MI W PECK RD (Lat: 34.333900,  Lng: -119.095750),  Route carried "on" structure: County highway ,  Year Built: 1916,  Year Reconstructed: 1930,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,500 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,620 (year 2038),  Features Intersected: ADAMS BARRANCA,  Facility Carried by Structure: TELEGRAPH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52C0073,  Location: .86 MI E VENTURA RD (Lat: 34.147386,  Lng: -119.186139),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 18,796 (year 2038),  Features Intersected: J STREET DRAIN,  Facility Carried by Structure: HUENEME ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 23.7m (77.8ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 52C0077,  Location: 2.8 MI E OF WELLS RD (Lat: 34.318586,  Lng: -119.121550),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 5,400 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,366 (year 2038),  Design Load: H 15,  Features Intersected: TODD BARRANCA,  Facility Carried by Structure: TELEGRAPH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52C0079,  Location: 0.7 MI EAST OF 10TH ST (Lat: 34.357833,  Lng: -119.049117),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,602 (year 2038),  Design Load: H 15,  Features Intersected: SANTA PAULA CREEK,  Facility Carried by Structure: TELEGRAPH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52C0165,  Location: 0.2 MI E OF SR 150 (Lat: 34.412339,  Lng: -119.082250),  Route carried "on" structure: County highway ,  Year Built: 1946,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 100 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 310 (year 2038),  Design Load: H 15,  Features Intersected: SANTA PAULA CREEK,  Facility Carried by Structure: MUPU RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 52C0184,  Location: 0.76 MI E OF BRIGGS RD (Lat: 34.329781,  Lng: -119.091894),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 600 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,035 (year 2038),  Design Load: HS 20,  Features Intersected: ADAMS BARRANCA,  Facility Carried by Structure: FAULKNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019
Find on map >>   Show street view

Structure Number: 52 0252,  Location: 07-VEN-126-R8.91 (Lat: 34.322728,  Lng: -119.101489),  Route carried "under" structure: State highway 126,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2019),  Features Intersected: ROUTE 126,  Facility Carried by Structure: BRIGGS ROAD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 8.910,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 52 0256,  Location: 07-VEN-126-R10.63-SPA (Lat: 34.339503,  Lng: -119.079211),  Route carried "under" structure: State highway 126,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 47,000 (year 2009),  Truck Traffic: 10%,  Features Intersected: STATE ROUTE 126,  Facility Carried by Structure: LAURIE LANE POC
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 10.630,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 52 0260L,  Location: 07-VEN-126-R12.04-SPA (Lat: 34.350058,  Lng: -119.058422),  Route carried "under" structure: State highway 150,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 5,800 (year 2018),  Truck Traffic: 7%,  Features Intersected: ROUTE 150 (10TH ST),  Facility Carried by Structure: STATE ROUTE 126 WB
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 34.390,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 52 0260R,  Location: 07-VEN-126-R12.04-SPA (Lat: 34.349867,  Lng: -119.058339),  Route carried "under" structure: State highway 150,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 5,800 (year 2018),  Truck Traffic: 7%,  Features Intersected: ROUTE 150 (10TH ST),  Facility Carried by Structure: STATE ROUTE 126 EB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 34.390,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 52 0265,  Location: 07-VEN-126-R10.38-SPA (Lat: 34.337436,  Lng: -119.083083),  Route carried "under" structure: State highway 126,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 47,000 (year 2018),  Truck Traffic: 10%,  Features Intersected: ROUTE 126,  Facility Carried by Structure: PECK ROAD
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 10.380,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Discuss Santa Paula, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.