Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rochester, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 45Number of bridges
  • 443ft / 135mTotal length
  • $125,680,000Total costs
  • 538,330Total average daily traffic
  • 37,058Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rochester
  • No street view available for this location

New bridges in Rochester, NH - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 91950-1959
  • 21960-1969
  • 61970-1979
  • 51980-1989
  • 21990-1999
  • 42000-2009
  • 122010-2019
Reconstructed bridges in Rochester, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 31980-1989
  • 31990-1999
  • 82000-2009
Average Bridge Daily Traffic in Rochester, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 52.8%Very good
  • 30.6%Good
  • 13.9%Satisfactory
  • 2.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 47.2%Very good
  • 36.1%Good
  • 11.1%Satisfactory
  • 5.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 52.8%Very good
  • 30.6%Good
  • 8.3%Satisfactory
  • 5.6%Fair
  • 2.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Excellent
  • 12.5%Very good
  • 45.8%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 222019600101,  Location: 600FT S JCT FLAGG RD (Lat: 43.255758,  Lng: -70.989753),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 683 (year 2020),  Average Future Daily Traffic: 1,010 (year 2042),  Design Load: HS 20,  Features Intersected: BROOK,  Facility Carried by Structure: STILLWATER CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.196,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 22202060011,  Location: .1 MI BARRINGTON T.L. (Lat: 43.248475,  Lng: -70.982056),  Route carried "on" structure: State highway 125,  Year Built: 1951,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 12,442 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,414 (year 2042),  Design Load: H 20,  Features Intersected: ISINGLASS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.425,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 8 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222022500139,  Location: 1.95 MI RTE 125 (Lat: 43.233517,  Lng: -70.955453),  Route carried "on" structure: Other road ,  Year Built: 1979,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 968 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,432 (year 2042),  Features Intersected: ISINGLASS RIVER,  Facility Carried by Structure: ROCHESTER NECK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.153,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 25.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 222008900112,  Location: .7 MI FROM JCT NH 16 (Lat: 43.331197,  Lng: -70.973156),  Route carried "under" structure: Ramp US 202,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 5,300 (year 2013),  Truck Traffic: 4%,  Features Intersected: US202,NH 11 WB(RAMP A),  Facility Carried by Structure: NH125(RAMP D)
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 22200930011,  Location: NH 16 INTERCHANGE (Lat: 43.330083,  Lng: -70.974831),  Route carried "under" structure: State highway 16,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 9,500 (year 2013),  Truck Traffic: 5%,  Features Intersected: NH125,  Facility Carried by Structure: US202,NH 11
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 22201090009,  Location: .8 MI FROM JCT NH202-A (Lat: 43.318700,  Lng: -70.995378),  Route carried "under" structure: Other road 16,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 29,000 (year 2013),  Truck Traffic: 7%,  Features Intersected: US202,NH 16,SP TPK,  Facility Carried by Structure: NH 11
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 22201580011,  Location: 3.25 MI N DOVER T/L (Lat: 43.282325,  Lng: -70.979339),  Route carried "under" structure: State highway 125,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2013),  Truck Traffic: 8%,  Features Intersected: NH125,  Facility Carried by Structure: NH 16,SP TPK,RAMP
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 222017600133,  Location: 1.7 MI FROM DOVER TL (Lat: 43.268597,  Lng: -70.957158),  Route carried "under" structure: State highway 16,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 25,005 (year 2014),  Truck Traffic: 8%,  Features Intersected: NH 16,SP TPK,  Facility Carried by Structure: TEBBETTS ROAD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Discuss Rochester, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.