Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Robstown, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 55Number of bridges
  • 840ft / 256mTotal length
  • $26,000Total costs
  • 425,877Total average daily traffic
  • 91,382Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Robstown
  • No street view available for this location

New bridges in Robstown, TX - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 61950-1959
  • 31960-1969
  • 31970-1979
  • 41980-1989
  • 161990-1999
  • 62000-2009
  • 122010-2019
  • 12020-2022
Reconstructed bridges in Robstown, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Robstown, TX
Average Bridge Truck Traffic in Robstown, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 58.8%Good
  • 17.6%Satisfactory
  • 11.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.3%Very good
  • 47.1%Good
  • 17.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Very good
  • 82.4%Good
  • 11.8%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 60.0%Good
  • 23.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 76.9%Good
  • 15.4%Satisfactory
  • 3.8%Fair
  • 3.8%Poor
Find on map >>   Show street view

Structure Number: 161780010201178,  Location: 2.3 MI E OF US 77 (Lat: 27.782894,  Lng: -97.619914),  Route carried "under" structure: State highway 1694,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,720 (year 2013),  Truck Traffic: 24%,  Features Intersected: FM 1694,  Facility Carried by Structure: SH 44 WB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 10.329,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 161780010201179,  Location: 2.3 MI E OF US 77 (Lat: 27.783142,  Lng: -97.619031),  Route carried "under" structure: State highway 1694,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 1,720 (year 2013),  Truck Traffic: 24%,  Features Intersected: FM 1694,  Facility Carried by Structure: SH 44 EB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 10.329,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 161780010202174,  Location: 1.1 MI SW OF SH 44 (Lat: 27.775556,  Lng: -97.668333),  Route carried "under" structure: State highway 892,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: FM 892,  Facility Carried by Structure: US 77
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 161780037302014,  Location: 0.45 MI NW OF E MAIN AVE (Lat: 27.794644,  Lng: -97.656644),  Route carried "under" structure: State highway 77,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 2,920 (year 2013),  Truck Traffic: 8%,  Features Intersected: BU 77-UPRR,  Facility Carried by Structure: SH 44 WB
Minimum Vertical Clearance: 7.04m (23.10ft),  Kilometerpoint: 8.900,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 16178003730203,  Location: 0.45 MI NW OF E MAIN AVE (Lat: 27.795194,  Lng: -97.657131),  Route carried "under" structure: State highway 77,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,200 (year 2011),  Truck Traffic: 10%,  Features Intersected: BU 77-UPRR,  Facility Carried by Structure: SH 44 EB
Minimum Vertical Clearance: 7.24m (23.75ft),  Kilometerpoint: 8.908,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 161780037302096,  Location: 2.2 MI W OF FM 1694 (Lat: 27.786933,  Lng: -97.654878),  Route carried "under" structure: State highway 44,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 18,490 (year 2013),  Truck Traffic: 13%,  Features Intersected: SH 44,TEX-MEX RR & BU 44,  Facility Carried by Structure: US 77
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 8.908,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 161780037310045,  Location: 2.6 MI N OF SH 44 (Lat: 27.816753,  Lng: -97.637303),  Route carried "under" structure: Business State highway 77,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 23,680 (year 2010),  Truck Traffic: 5%,  Features Intersected: UPRR & BU 77 NB
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 5.504,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 161780037310046,  Location: 2.6 MI N OF SH 44 (Lat: 27.816789,  Lng: -97.637539),  Route carried "under" structure: Business State highway 77,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 23,680 (year 2010),  Truck Traffic: 5%,  Features Intersected: UPRR & BU 77 NB
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 5.810,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 161780037310049,  Location: 2.05 MI N OF SH 44 (Lat: 27.810533,  Lng: -97.638508),  Route carried "under" structure: County highway 44,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2010),  Truck Traffic: 2%,  Features Intersected: CR 44,  Facility Carried by Structure: US 77 NB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 16178003731005,  Location: 2.05 MI N OF SH 44 (Lat: 27.810544,  Lng: -97.638742),  Route carried "under" structure: County highway 44,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2010),  Truck Traffic: 2%,  Features Intersected: CR 44,  Facility Carried by Structure: US 77 SB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 161780037310118,  Location: 0.3 MI N OF E MAIN AVE (Lat: 27.792025,  Lng: -97.653950),  Route carried "under" structure: State highway 44,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: SH 44 WB,  Facility Carried by Structure: US 77 NB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 161780037310119,  Location: 0.3 MI N OF E MAIN AVE (Lat: 27.792069,  Lng: -97.654081),  Route carried "under" structure: State highway 44,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: SH 44 WB,  Facility Carried by Structure: US 77 SB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Robstown, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.