  • National Bridge Inventory (NBI) Statistics
  • 170Number of bridges
  • 2,178ft / 664mTotal length
  • $775,717,000Total costs
  • 2,926,683Total average daily traffic
  • 167,438Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Roanoke
  • No street view available for this location

New bridges in Roanoke, VA - historical statistics
  • New bridges - historical statistics
  • 61920-1929
  • 131930-1939
  • 51940-1949
  • 51950-1959
  • 491960-1969
  • 381970-1979
  • 191980-1989
  • 221990-1999
  • 52000-2009
  • 72010-2019
  • 12020-2022
Reconstructed bridges in Roanoke, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
  • 71980-1989
  • 51990-1999
  • 52000-2009
  • 42010-2019
Average Bridge Daily Traffic in Roanoke, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.4%Very good
  • 46.2%Good
  • 37.6%Satisfactory
  • 10.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.3%Very good
  • 42.3%Good
  • 28.9%Satisfactory
  • 17.5%Fair
  • 1.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.1%Very good
  • 45.4%Good
  • 39.2%Satisfactory
  • 13.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.3%Very good
  • 35.0%Good
  • 40.0%Satisfactory
  • 12.5%Fair
  • 1.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.7%Very good
  • 44.4%Good
  • 51.9%Satisfactory
Find on map >>   Show street view

Structure Number: 6472,  Location: 00.38FR676/01.15TO738 (Lat: 38.976114,  Lng: -77.246117),  Route carried "on" structure: State highway 193,  Year Built: 1978,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 12,215 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,057 (year 2040),  Design Load: HS 20,  Features Intersected: DIFFICULT RUN,  Facility Carried by Structure: GEORGETOWN PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.574,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6473,  Location: 00.03FR685/00.19TO6037 (Lat: 38.958908,  Lng: -77.205331),  Route carried "on" structure: State highway 193,  Year Built: 1995,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 16,036 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 22,450 (year 2040),  Design Load: HS 20,  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: GEORGETOWN PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.886,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 6603,  Location: 01.14FR50/00.14TO66 (Lat: 38.882489,  Lng: -77.221322),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 83,981 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 117,573 (year 2040),  Design Load: HS 20,  Features Intersected: HOLMES RUN,  Facility Carried by Structure: CAPITAL BELTWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.759,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6604,  Location: 01.30FR50/00.10TO66 (Lat: 38.884500,  Lng: -77.220761),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 83,981 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 117,573 (year 2040),  Design Load: HS 20,  Features Intersected: HOLMES RUN,  Facility Carried by Structure: CAPITAL BELTWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.025,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000
Find on map >>   Show street view

Structure Number: 14933,  Location: 3.86-Rte419;4.18-Frank Co (Lat: 37.187608,  Lng: -79.936269),  Route carried "on" structure: US 220,  Year Built: 1947,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 28,367 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 36,404 (year 2040),  Design Load: HS 15,  Features Intersected: Narrows Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.917,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $25,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14934,  Location: 2.65-Rte419;5.38-Frank Co (Lat: 37.201556,  Lng: -79.947100),  Route carried "on" structure: US 220,  Year Built: 1947,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 28,367 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 36,404 (year 2040),  Design Load: H 15,  Features Intersected: Narrows Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.848,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,282,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,284,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14953,  Location: 1.47-ECLRoanke & 0.44-Bot (Lat: 37.323403,  Lng: -79.870911),  Route carried "on" structure: US 221,  Year Built: 1965,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 32,057 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 44,288 (year 2040),  Design Load: HS 20,  Features Intersected: Cooks Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 128.237,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,380,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 14966,  Location: 0.06-Rte220; 2.22-Rte221 (Lat: 37.231408,  Lng: -79.974003),  Route carried "on" structure: State highway 419,  Year Built: 1974,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 35,019 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 41,607 (year 2040),  Design Load: HS 20,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,524,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 14974,  Location: 0.00-Rte606; 0.10-Rte631 (Lat: 37.321831,  Lng: -79.870672),  Route carried "on" structure: County highway 603,  Year Built: 1921,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 606 (year 2019),  Average Future Daily Traffic: 670 (year 2040),  Design Load: H 15,  Features Intersected: Cooks Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $810,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,215,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14975,  Location: 0.30-Rt603; 0.22-end main (Lat: 37.317814,  Lng: -79.868183),  Route carried "on" structure: County highway 606,  Year Built: 1969,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 22 (year 2040),  Features Intersected: Glade Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $771,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $2,505,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 14981,  Location: 0.50-Rte460;0.70-Rte1049 (Lat: 37.319669,  Lng: -79.886992),  Route carried "on" structure: County highway 609,  Year Built: 1980,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,179 (year 2019),  Average Future Daily Traffic: 1,282 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Br Glade Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.426,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $636,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 15025,  Location: 0.74-Rte626; 0.01-Rte805 (Lat: 37.330272,  Lng: -80.009803),  Route carried "on" structure: County highway 628,  Year Built: 1979,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 2,801 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,921 (year 2040),  Features Intersected: Br Peters Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.876,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.9m (6.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 1503,  Location: 0.04-Rte1729; 0.00-Rte628 (Lat: 37.329364,  Lng: -80.016622),  Route carried "on" structure: County highway 629,  Year Built: 1979,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 1,452 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2040),  Design Load: HS 20,  Features Intersected: Peters Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.480,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.84m (2.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $730,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 15057,  Location: 0.20 RT 220 & 0.00 END MT (Lat: 37.178233,  Lng: -79.939969),  Route carried "on" structure: County highway 657,  Year Built: 1989,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 74 (year 2018),  Average Future Daily Traffic: 82 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Back Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1506,  Location: 0.70-Rte721; 0.20-Rte667 (Lat: 37.199381,  Lng: -79.910067),  Route carried "on" structure: County highway 666,  Year Built: 1974,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 291 (year 2019),  Average Future Daily Traffic: 303 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Back Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.302,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15061,  Location: 0.85-Rte657; 0.55-Rte667 (Lat: 37.185358,  Lng: -79.923144),  Route carried "on" structure: County highway 666,  Year Built: 1972,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 186 (year 2018),  Average Future Daily Traffic: 267 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Back Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.334,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15063,  Location: 0.53-Rte667W; .10-Rte667E (Lat: 37.196075,  Lng: -79.911872),  Route carried "on" structure: County highway 666,  Year Built: 1953,  Status: Open,  Structure Length: 5.19m (17.03ft),  Average Daily Traffic: 291 (year 2019),  Average Future Daily Traffic: 303 (year 2040),  Design Load: H 15,  Features Intersected: Back Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.298,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $559,000,  Total Project Cost: $5,191,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21593,  Location: 008024 0033116 (Lat: 37.256622,  Lng: -79.924772),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 7.08m (23.23ft),  Average Daily Traffic: 7,276 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,004 (year 2040),  Design Load: HS 20,  Features Intersected: NS RAILWAY & INDUS. AVE,  Facility Carried by Structure: 9TH STREET
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.6m (77.4ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $337,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21594,  Location: 0.11-Hunt Ave &.09-Lukens (Lat: 37.290211,  Lng: -79.941669),  Route carried "on" structure: Alternate City street ,  Year Built: 1963,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 4,654 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,839 (year 2040),  Design Load: HS 15,  Features Intersected: Rtes 581 & 220,  Facility Carried by Structure: Liberty Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.784,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,685,000,  Roadway Improvement Cost: $703,000,  Total Project Cost: $13,820,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21597,  Location: 0.20 MI FROM RTE 116 (Lat: 37.257636,  Lng: -79.941853),  Route carried "on" structure: City street ,  Year Built: 1926,  Status: Open,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 11,952 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,775 (year 2040),  Features Intersected: NS RAILWAY,  Facility Carried by Structure: JEFFERSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.269,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.58m (37.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $371,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21601,  Location: 00031347 0035ECL ROAN (Lat: 37.242967,  Lng: -79.920517),  Route carried "on" structure: City street 666,  Year Built: 1932,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,258 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,313 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GARNAND BR,  Facility Carried by Structure: BANDY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,000,  Total Project Cost: $6,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21602,  Location: 0070460 0000ECL ROAN (Lat: 37.284283,  Lng: -79.900469),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 18,244 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 25,542 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GLADE CREEK,  Facility Carried by Structure: GUS NICKS BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21603,  Location: 002911 & 0047116 (Lat: 37.275242,  Lng: -79.957711),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 20.27m (66.50ft),  Average Daily Traffic: 7,167 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,884 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NSRW & SHEN. AVE.,  Facility Carried by Structure: 10TH STREET
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 57.2m (187.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.27m (66.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $267,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21608,  Location: 0040KING ST. 0030NCL VNTO (Lat: 37.288331,  Lng: -79.888103),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 800 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,200 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GLADE CREET,  Facility Carried by Structure: BERKLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $10,000,  Total Project Cost: $10,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other
Find on map >>   Show street view

Structure Number: 21609,  Location: 0020818 0010686 (Lat: 37.249678,  Lng: -80.003256),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 6,061 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,853 (year 2040),  Design Load: HS 15,  Features Intersected: Mud Lick Creel,  Facility Carried by Structure: Garst Mill Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $150,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21611,  Location: 000311 0032LEE HI R (Lat: 37.261128,  Lng: -80.000850),  Route carried "on" structure: City street ,  Year Built: 1932,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 2,508 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,535 (year 2040),  Features Intersected: MUDLICK CREEK,  Facility Carried by Structure: MUDLICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $70,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 21612,  Location: 0.20 US ROUTE 11 (Lat: 37.267711,  Lng: -80.009678),  Route carried "on" structure: State highway 117,  Year Built: 1996,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 15,247 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 16,667 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NS RAILWAY,  Facility Carried by Structure: PETERS CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Total Project Cost: $15,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21613,  Location: 0054WCL ROANO0003MILLER S (Lat: 37.279769,  Lng: -80.004983),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 11,042 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,744 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PETERS CREEK,  Facility Carried by Structure: SHENANDOAH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $14,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21615,  Location: 0003629 00020780 (Lat: 37.316522,  Lng: -80.012464),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,269 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,977 (year 2040),  Design Load: HS 20,  Features Intersected: PETERS CREEK,  Facility Carried by Structure: COVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $90,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21617,  Location: .1 OLDSTEVN & .8 WCL ROAN (Lat: 37.288258,  Lng: -80.007786),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 5,597 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,715 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Salem Turnpike,  Facility Carried by Structure: Peters Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 84.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $69,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $89,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21618,  Location: 0005117 00101475 (Lat: 37.304186,  Lng: -80.007744),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 900 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,000 (year 2033),  Design Load: HS 20,  Features Intersected: Peters Creek,  Facility Carried by Structure: Peach Tree Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.6m (28.2ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $45,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $65,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21619,  Location: 0013117 00021470 (Lat: 37.309633,  Lng: -80.007486),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,000 (year 1993),  Average Future Daily Traffic: 2,000 (year 2035),  Features Intersected: PETERS CREEK,  Facility Carried by Structure: NORTHWOOD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $8,140,000,  Roadway Improvement Cost: $3,200,000,  Total Project Cost: $11,340,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2162,  Location: 0.04 FROM PLANTATION RD (Lat: 37.314081,  Lng: -79.932789),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 3.59m (11.78ft),  Average Daily Traffic: 1,236 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,000 (year 2031),  Design Load: HS 15,  Features Intersected: TINKER CREEK,  Facility Carried by Structure: COLUMBIA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $21,000,  Total Project Cost: $21,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21622,  Location: 0.22-FRNK RD;0.01-COL AV. (Lat: 37.256181,  Lng: -79.953372),  Route carried "on" structure: City street ,  Year Built: 1977,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 5.80m (19.03ft),  Average Daily Traffic: 18,077 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,046 (year 2040),  Design Load: HL 93,  Features Intersected: ROY WEBR EXPRSSWY/RT220,  Facility Carried by Structure: BRANDON AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.719,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.0m (108.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21624,  Location: 0028MCCLAN ST005024 (Lat: 37.251722,  Lng: -79.943417),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 24.95m (81.86ft),  Average Daily Traffic: 5,775 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,352 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROA RV; NS & W DR,  Facility Carried by Structure: JEFFERSON ST
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.96m (81.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $143,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21626,  Location: .3 BELVW AV & .17 JEFSN S (Lat: 37.252967,  Lng: -79.942747),  Route carried "on" structure: City street ,  Year Built: 1978,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.93m (16.17ft),  Average Daily Traffic: 50 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2034),  Design Load: HS 20,  Features Intersected: ROANOKE RIVER,  Facility Carried by Structure: RESERVE AVE EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $85,000,  Total Project Cost: $85,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21627,  Location: 0120RT 116 0040RT 24 (Lat: 37.264550,  Lng: -79.917550),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 5.37m (17.62ft),  Average Daily Traffic: 10,604 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,703 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NS RAILWAY,  Facility Carried by Structure: 13TH STREET SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $453,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21629,  Location: 0006PATTER AV (Lat: 37.274492,  Lng: -79.980181),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 7.39m (24.25ft),  Average Daily Traffic: 2,926 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,096 (year 2040),  Design Load: HS 20,  Features Intersected: ROANOKE RIVER,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $67,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $87,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2163,  Location: 0081116 (Lat: 37.237786,  Lng: -79.925483),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 4,297 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,016 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GUM SPRING BRANCH,  Facility Carried by Structure: GARDEN CITY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $35,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing