Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Richmond, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 115Number of bridges
  • 4,278ft / 1,304mTotal length
  • $15,237,000Total costs
  • 5,035,966Total average daily traffic
  • 180,664Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Richmond
  • No street view available for this location

New bridges in Richmond, CA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 171950-1959
  • 171960-1969
  • 81970-1979
  • 261980-1989
  • 401990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Richmond, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 41980-1989
  • 51990-1999
  • 12000-2009
Average Bridge Daily Traffic in Richmond, CA
Average Bridge Truck Traffic in Richmond, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.4%Good
  • 14.8%Satisfactory
  • 24.1%Fair
  • 3.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 64.8%Good
  • 9.3%Satisfactory
  • 25.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 74.1%Good
  • 9.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 41.7%Excellent
  • 33.3%Very good
  • 16.7%Good
  • 8.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 28 0056K,  Location: 04-CC-580-R4.82-RCH (Lat: 37.927183,  Lng: -122.381306),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1980,  Status: Open,  Structure Length: 23.13m (75.89ft),  Average Daily Traffic: 23,750 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 64,557 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY & GARRARD BLVD,  Facility Carried by Structure: EB ONRAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.820,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0056L,  Location: 04-CC-580-R4.82-RCH (Lat: 37.927475,  Lng: -122.380953),  Route carried "on" structure: Interstate 580,  Year Built: 1980,  Status: Open,  Structure Length: 26.37m (86.52ft),  Average Daily Traffic: 27,500 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 49,937 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY & GARRARD BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.820,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.0m (49.2ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0056R,  Location: 04-CC-580-R4.81-RCH (Lat: 37.927658,  Lng: -122.380800),  Route carried "on" structure: Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 27.84m (91.34ft),  Average Daily Traffic: 33,500 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 59,068 (year 2042),  Design Load: HS 20,  Features Intersected: BNSF RY & GARRARD BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.810,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0056S,  Location: 04-CC-580-R4.81-RCH (Lat: 37.927869,  Lng: -122.380714),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1980,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 27.61m (90.58ft),  Average Daily Traffic: 2,450 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,379 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY & GARRARD BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.810,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 6,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0080R,  Location: 04-CC-080-2.04-RCH (Lat: 37.925150,  Lng: -122.320219),  Route carried "on" structure: Interstate 80,  Year Built: 1997,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 89,500 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 115,001 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CUTTING BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.040,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0081,  Location: 04-CC-080-2.53-RCH (Lat: 37.931372,  Lng: -122.324731),  Route carried "on" structure: Interstate 80,  Year Built: 1954,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.00m (6.56ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20,  Features Intersected: RICHMOND GREENWAY TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.530,  Lanes on structure: 11,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 42.3m (138.8ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 42.3m (138.8ft),  Out-to-Out Width: 44.0m (144.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0082,  Location: 04-CC-080-2.62-RCH (Lat: 37.932489,  Lng: -122.325556),  Route carried "on" structure: Interstate 80,  Year Built: 1956,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 4.53m (14.86ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20,  Features Intersected: MACDONALD AVE & E80 OFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.620,  Lanes on structure: 10,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 47.8m (156.8ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.4m (122.7ft),  Curb-To-Curb Width: 47.8m (156.8ft),  Out-to-Out Width: 49.5m (162.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 28 0082S,  Location: 04-CC-080-2.59-RCH (Lat: 37.932264,  Lng: -122.325283),  Route carried "on" structure: Bypass Interstate 80,  Year Built: 1979,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 3,050 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,362 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MACDONALD AVE & E80 OFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.590,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0083,  Location: 04-CC-080-2.82-RCH (Lat: 37.935294,  Lng: -122.326625),  Route carried "on" structure: Interstate 80,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20,  Features Intersected: BARRETT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.820,  Lanes on structure: 8,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 38.8m (127.3ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.5m (70.5ft),  Curb-To-Curb Width: 35.8m (117.5ft),  Out-to-Out Width: 43.7m (143.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 28 0083S,  Location: 04-CC-080-2.82-RCH (Lat: 37.935333,  Lng: -122.326439),  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1997,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 8,000 (year 1997),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,242 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BARRETT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.820,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0084,  Location: 04-CC-080-2.96-RCH (Lat: 37.937008,  Lng: -122.326019),  Route carried "on" structure: Interstate 80,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20,  Features Intersected: SAN PABLO AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.960,  Lanes on structure: 8,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.5m (129.6ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 35.2m (115.5ft),  Out-to-Out Width: 43.1m (141.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0084K,  Location: 04-CC-080-2.97-RCH (Lat: 37.937647,  Lng: -122.326428),  Route carried "on" structure: Ramp Interstate 80,  Year Built: 1964,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 5,100 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,633 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SAN PABLO AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.970,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0085,  Location: 04-CC-080-3.40-RCH (Lat: 37.943269,  Lng: -122.324083),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 2,260 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,648 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 80,  Facility Carried by Structure: SOLANO AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0087,  Location: 04-CC-080-3.80-RCH (Lat: 37.948492,  Lng: -122.326322),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 10,246 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,796 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 80,  Facility Carried by Structure: MCBRYDE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.1m (75.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 009,  Location: 04-CC-580-0.72-RCH (Lat: 37.905978,  Lng: -122.318653),  Route carried "on" structure: Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 84,500 (year 2009),  Average Future Daily Traffic: 135,957 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RUST DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.720,  Lanes on structure: 6,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 31.9m (104.7ft),  Out-to-Out Width: 33.5m (109.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0091,  Location: 04-CC-580-1.17-RCH (Lat: 37.911750,  Lng: -122.323397),  Route carried "on" structure: Interstate 580,  Year Built: 1953,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 84,500 (year 2009),  Average Future Daily Traffic: 133,269 (year 2037),  Design Load: HS 20,  Features Intersected: STEGE DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.170,  Lanes on structure: 7,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 40.5m (132.9ft),  Out-to-Out Width: 42.2m (138.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 01,  Location: 04-CC-580-6.22-RCH (Lat: 37.932625,  Lng: -122.405325),  Route carried "on" structure: Interstate 580,  Year Built: 1956,  Status: Open,  Structure Length: 650.60m (2134.51ft),  Average Daily Traffic: 80,000 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 130,000 (year 2040),  Design Load: HS 20,  Features Intersected: SAN PABLO BAY
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 6.220,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 295.7m (970.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 103,  Length of Maximum Span: 331.3m (1,086.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 22.0m (72.2ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Excellent,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Underwater Inspection Date: May 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 28 0114,  Location: 04-CC-080-0.22-RCH (Lat: 37.900708,  Lng: -122.310389),  Route carried "on" structure: Interstate 80,  Year Built: 1958,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20,  Features Intersected: CENTRAL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.220,  Lanes on structure: 8,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 37.0m (121.4ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 37.0m (121.4ft),  Out-to-Out Width: 38.8m (127.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0123,  Location: 04-CC-080-1.00-RCH (Lat: 37.910600,  Lng: -122.316925),  Route carried "on" structure: Interstate 80,  Year Built: 1960,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20,  Features Intersected: CARLSON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.000,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 35.0m (114.8ft),  Skew: 34 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.4m (63.6ft),  Curb-To-Curb Width: 35.0m (114.8ft),  Out-to-Out Width: 43.1m (141.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0136,  Location: 04-CC-080-0.01-RCH (Lat: 37.897358,  Lng: -122.308794),  Route carried "on" structure: Interstate 80,  Year Built: 1936,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Features Intersected: CERRITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 8,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 39.4m (129.3ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 37.4m (122.7ft),  Out-to-Out Width: 39.4m (129.3ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 28 0139,  Location: 04-CC-580-R5.43-RCH (Lat: 37.931156,  Lng: -122.391117),  Route carried "on" structure: Interstate 580,  Year Built: 1990,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 68,000 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 119,625 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: MARINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.430,  Lanes on structure: 6,  Lanes under structure: 3,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 32.2m (105.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0140R,  Location: 04-CC-580-5.80-RCH (Lat: 37.932642,  Lng: -122.397614),  Route carried "on" structure: Interstate 580,  Year Built: 1956,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 19.73m (64.73ft),  Average Daily Traffic: 34,000 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 59,416 (year 2040),  Design Load: HS 20,  Features Intersected: SCOFIELD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.800,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: October 2020,  Other Special Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0141R,  Location: 04-CC-580-6.01-RCH (Lat: 37.932206,  Lng: -122.401203),  Route carried "on" structure: Interstate 580,  Year Built: 1956,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 33,500 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 59,416 (year 2040),  Design Load: HS 20,  Features Intersected: STENMARK DR SB ON-RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.010,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 28 0151,  Location: 04-CC-080-10.69-HER (Lat: 38.022411,  Lng: -122.262539),  Route carried "on" structure: Interstate 80,  Year Built: 1958,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 115,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 182,754 (year 2039),  Design Load: HS 20,  Features Intersected: WILLOW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.690,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 36.1m (118.4ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 34.3m (112.5ft),  Out-to-Out Width: 36.1m (118.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0226,  Location: 04-CC-080-2.50-RCH (Lat: 37.931072,  Lng: -122.324514),  Route carried "on" structure: Interstate 80,  Year Built: 1970,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 179,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BARTD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.500,  Lanes on structure: 11,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb-To-Curb Width: 47.6m (156.2ft),  Out-to-Out Width: 49.2m (161.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0230L,  Location: 04-CC-024-R6.08-LFYT (Lat: 37.893264,  Lng: -122.124800),  Route carried "on" structure: State highway 24,  Year Built: 1970,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 79,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 116,615 (year 2039),  Design Load: HS 20,  Features Intersected: LAFAYETTE STA PUC(BARTD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.080,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0231,  Location: 04-CC-580-0.24-RCH (Lat: 37.899875,  Lng: -122.314397),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 14.30m (46.92ft),  Average Daily Traffic: 10,500 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,915 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 580,  Facility Carried by Structure: CENTRAL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 19.6m (64.3ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 29.1m (95.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.6m (64.3ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0231J,  Location: 04-CC-580-0.04-RCH (Lat: 37.898028,  Lng: -122.312089),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 13.70m (44.95ft),  Average Daily Traffic: 4,300 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,846 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CENTRAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.040,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0231K,  Location: 04-CC-580-0.14-RCH (Lat: 37.899008,  Lng: -122.312833),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 13.20m (43.31ft),  Average Daily Traffic: 4,300 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,846 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CENTRAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.140,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.2m (79.4ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0231S,  Location: 04-CC-580-0.25-RCH (Lat: 37.900244,  Lng: -122.313836),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 4,400 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,846 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CENTRAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.250,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0231T,  Location: 04-CC-580-0.34-RCH (Lat: 37.901078,  Lng: -122.314508),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 8.22m (26.97ft),  Average Daily Traffic: 4,400 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,846 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CENTRAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.340,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 027,  Location: 04-CC-680-R7.64 (Lat: 37.823972,  Lng: -121.993839),  Route carried "on" structure: Interstate 680,  Year Built: 1964,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 190,100 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 247,100 (year 2038),  Design Load: HS 20,  Features Intersected: GREEN VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.640,  Lanes on structure: 10,  Base Highway Network: Yes (Inventory Route: 6,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 34.7m (113.8ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 28 0271,  Location: 04-CC-580-1.21 (Lat: 37.911189,  Lng: -122.325050),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 32.77m (107.51ft),  Average Daily Traffic: 13,500 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 18,292 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 580,  Facility Carried by Structure: BAYVIEW AVENUE OC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.6m (64.3ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0271J,  Location: 04-CC-580-1.07 (Lat: 37.910569,  Lng: -122.322231),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1987,  Status: Open,  Structure Length: 22.52m (73.88ft),  Average Daily Traffic: 3,650 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,081 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NONE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.070,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0271K,  Location: 04-CC-580-1.23 (Lat: 37.912750,  Lng: -122.323844),  Route carried "on" structure: Ramp Interstate 580,  Year Built: 1987,  Status: Open,  Structure Length: 17.39m (57.05ft),  Average Daily Traffic: 3,600 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,081 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NONE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.230,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0273,  Location: 04-CC-580-R2.89-RCH (Lat: 37.921544,  Lng: -122.347317),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 3,000 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,760 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 580,  Facility Carried by Structure: SOUTH 23RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 32.6m (107.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0274,  Location: 04-CC-580-R3.35-RCH (Lat: 37.921678,  Lng: -122.355772),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 4,000 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 16,139 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 580,  Facility Carried by Structure: MARINA WAY OC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0276,  Location: 04-CC-580-R3.79-RCH (Lat: 37.925133,  Lng: -122.363119),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 5,000 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,202 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 580,  Facility Carried by Structure: CUTTING BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 25 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0277,  Location: 04-CC-580-R4.09-RCH (Lat: 37.927206,  Lng: -122.367744),  Route carried "on" structure: Interstate 580,  Year Built: 1990,  Status: Open,  Structure Length: 17.48m (57.35ft),  Average Daily Traffic: 69,000 (year 2009),  Average Future Daily Traffic: 102,228 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY, SOUTH SECOND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.090,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 43.4m (142.4ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0278,  Location: 04-CC-580-R4.64-RCH (Lat: 37.927300,  Lng: -122.377889),  Route carried "on" structure: Interstate 580,  Year Built: 1991,  Status: Open,  Structure Length: 6.42m (21.06ft),  Average Daily Traffic: 55,000 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 102,228 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CANAL BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.640,  Lanes on structure: 7,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.1m (105.3ft),  Curb-To-Curb Width: 44.2m (145.0ft),  Out-to-Out Width: 45.9m (150.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Discuss Richmond, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.