Bridge Statistics for Rensselaer, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 653ft / 199mTotal length
  • $126,750,000Total costs
  • 246,611Total average daily traffic
  • 14,057Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rensselaer
  • No street view available for this location

New bridges in Rensselaer, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31920-1929
  • 51930-1939
  • 21940-1949
  • 111960-1969
  • 31970-1979
  • 11980-1989
  • 41990-1999
  • 12000-2009
Reconstructed bridges in Rensselaer, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 32000-2009
  • 32010-2019
Average Bridge Daily Traffic in Rensselaer, NY
Average Bridge Truck Traffic in Rensselaer, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 30.0%Good
  • 25.0%Satisfactory
  • 15.0%Fair
  • 5.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Excellent
  • 20.0%Very good
  • 25.0%Good
  • 35.0%Satisfactory
  • 10.0%Fair
  • 5.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.0%Very good
  • 60.0%Satisfactory
  • 20.0%Fair
  • 5.0%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 25.0%Good
  • 33.3%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Find on map >>   Show street view

Structure Number: 100552,  Location: JCT OF US 9 & 20 / SH 9J (Lat: 42.629247,  Lng: -73.743208),  Route carried "on" structure: US 9,  Year Built: 1930,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 14,107 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,173 (year 2040),  Features Intersected: RTE 9J, AMTRAK POST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.710,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.44m (30.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $3,414,000,  Roadway Improvement Cost: $1,999,000,  Total Project Cost: $5,413,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10926,  Location: 1 MILE N JCT SH 43 & I90 (Lat: 42.659933,  Lng: -73.722078),  Route carried "on" structure: City street ,  Year Built: 1968,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 4,846 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,886 (year 2040),  Design Load: HS 20,  Features Intersected: 90I 90I14021005 WB, RTE,  Facility Carried by Structure: WASHINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.5m (96.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,953,000,  Roadway Improvement Cost: $1,144,000,  Total Project Cost: $3,096,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1092621,  Location: JCT OF RTS 43 & I90 (Lat: 42.644144,  Lng: -73.710356),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 23,104 (year 2015),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: RTE 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.274,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,406,000,  Roadway Improvement Cost: $823,000,  Total Project Cost: $2,229,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092622,  Location: JCT OF RTS 43 & I90 (Lat: 42.644167,  Lng: -73.710739),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 17,702 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 28,052 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,406,000,  Roadway Improvement Cost: $823,000,  Total Project Cost: $2,229,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1093029,  Location: DOWNTOWN ALBANY (Lat: 42.642697,  Lng: -73.746464),  Route carried "on" structure: US 9,  Year Built: 1969,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 30.02m (98.49ft),  Average Daily Traffic: 26,587 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,711 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: HUDSON RIVER
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.129,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 18.2m (59.7ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 106.7m (350.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 36.7m (120.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.02m (98.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: October 2017,  Bridge Improvement Cost: $27,756,000,  Roadway Improvement Cost: $16,254,000,  Total Project Cost: $44,010,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 109302A,  Location: RAMP RT 9 NB TO DUNN BR (Lat: 42.641850,  Lng: -73.744269),  Route carried "on" structure: Ramp US 9,  Year Built: 1969,  Status: Open,  Structure Length: 46.21m (151.61ft),  Average Daily Traffic: 26,587 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,711 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP- DUNN TO BROADWAY,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.174,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.20m (151.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $11,596,000,  Roadway Improvement Cost: $6,791,000,  Total Project Cost: $18,387,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109302B,  Location: RT 9 SB OFF DUNN BR (Lat: 42.642092,  Lng: -73.745306),  Route carried "on" structure: Ramp US 9,  Year Built: 1969,  Status: Open,  Structure Length: 24.05m (78.90ft),  Average Daily Traffic: 26,587 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,711 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP- DUNN TO BROADWAY,
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 35.9m (117.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.04m (78.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $6,200,000,  Roadway Improvement Cost: $3,631,000,  Total Project Cost: $9,831,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109306,  Location: JCT RTS 9 & 20 & HUDSON R (Lat: 42.641333,  Lng: -73.747039),  Route carried "on" structure: Ramp US ,  Year Built: 1971,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 5,163 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,187 (year 2040),  Design Load: HS 20,  Features Intersected: PEDESTRIAN PATH, MILL CR,  Facility Carried by Structure: DUNN RAMP TO BDWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $941,000,  Roadway Improvement Cost: $551,000,  Total Project Cost: $1,492,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 200551,  Location: JCT US 9 & 20 / SH 9J (Lat: 42.630822,  Lng: -73.744169),  Route carried "on" structure: US 9,  Year Built: 1935,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 20,033 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,127 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.936,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.5m (96.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $3,840,000,  Roadway Improvement Cost: $2,248,000,  Total Project Cost: $6,088,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 202533,  Location: .5 MI E JCT US 9 & US 20 (Lat: 42.637203,  Lng: -73.741258),  Route carried "on" structure: City street 151,  Year Built: 1929,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 21.46m (70.41ft),  Average Daily Traffic: 6,131 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,447 (year 2040),  Design Load: HS 20,  Features Intersected: EAST STREET, MILL CREEK,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 21.45m (70.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $4,455,000,  Roadway Improvement Cost: $2,609,000,  Total Project Cost: $7,064,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220219,  Location: BROADWAY CITY RENSSELAER (Lat: 42.640658,  Lng: -73.745164),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 7,273 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,835 (year 2040),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 4.2m (13.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,127,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,787,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22022,  Location: CITY OF RENSSELAER S.ST. (Lat: 42.635358,  Lng: -73.742558),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,147 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,606 (year 2038),  Features Intersected: MILL CREEK,  Facility Carried by Structure: SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $697,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220222,  Location: CITY OF RENSSELAER (Lat: 42.644864,  Lng: -73.741117),  Route carried "on" structure: City street ,  Year Built: 1975,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 20.79m (68.21ft),  Average Daily Traffic: 3,514 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,268 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANS/ AMTRAK, AMTRA,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 31.3m (102.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.78m (68.18ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $6,073,000,  Roadway Improvement Cost: $3,556,000,  Total Project Cost: $9,629,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220223,  Location: CITY OF RENSSELAER (Lat: 42.642003,  Lng: -73.741594),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 2,870 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,551 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: AMTRAK-2, AMTRAK-3, CSX,  Facility Carried by Structure: HERRICK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.8m (68.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,471,000,  Roadway Improvement Cost: $2,033,000,  Total Project Cost: $5,504,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220224,  Location: CITY OF RENSS -HIGH ST (Lat: 42.634100,  Lng: -73.736461),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 1,097 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,536 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK,  Facility Carried by Structure: HIGH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $803,000,  Roadway Improvement Cost: $470,000,  Total Project Cost: $1,273,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220225,  Location: SECOND AVE. RENSSELAER (Lat: 42.634989,  Lng: -73.739542),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 249 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 349 (year 2040),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: SECOND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $290,000,  Total Project Cost: $785,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220226,  Location: CITY OF RENSSELAER,WASH S (Lat: 42.640322,  Lng: -73.743942),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 5,062 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,149 (year 2040),  Features Intersected: MILL CREEK,  Facility Carried by Structure: WASHINGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $653,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220227,  Location: LAWRENCE ST-CITY OF RENSS (Lat: 42.643592,  Lng: -73.737514),  Route carried "on" structure: Business City street ,  Year Built: 1997,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 345 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 483 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HOLLOW CREEK,  Facility Carried by Structure: LAWRENCE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $210,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 220228,  Location: CITY OF RENSSELAER (Lat: 42.636517,  Lng: -73.743242),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Closed,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 92 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 129 (year 2037),  Features Intersected: MILL CREEK,  Facility Carried by Structure: SECOND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Imminent failure,  Channel: Poor,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $811,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $1,286,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226778,  Location: CITY OF RENSSELAER - PORT (Lat: 42.626011,  Lng: -73.745836),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 1,758 (year 2019),  Truck Traffic: 62%,  Average Future Daily Traffic: 2,175 (year 2040),  Design Load: HS 20,  Features Intersected: CSXT PORT SPUR,  Facility Carried by Structure: PORT ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,020,000,  Roadway Improvement Cost: $597,000,  Total Project Cost: $1,617,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226779,  Location: RENSSELAER PORT ACCESS-9J (Lat: 42.627789,  Lng: -73.744922),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 1,758 (year 2019),  Truck Traffic: 62%,  Average Future Daily Traffic: 2,175 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: PORT ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,189,000,  Roadway Improvement Cost: $1,282,000,  Total Project Cost: $3,470,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100552,  Location: JCT OF US 9 & 20 / SH 9J (Lat: 42.629247,  Lng: -73.743208),  Route carried "under" structure: State highway 9J,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 3,750 (year 1979),  Features Intersected: RTE 9J, AMTRAK POST ROAD,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 1.207,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: 10926,  Location: 1 MILE N JCT SH 43 & I90 (Lat: 42.659933,  Lng: -73.722078),  Route carried "under" structure: Interstate 90,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 28,840 (year 2000),  Features Intersected: 90I 90I14021005 WB, RTE,  Facility Carried by Structure: WASHINGTON AVENUE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 11.102,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.5m (96.8ft)

Find on map >>   Show street view

Structure Number: 1092621,  Location: JCT OF RTS 43 & I90 (Lat: 42.644144,  Lng: -73.710356),  Route carried "under" structure: State highway 43,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 5,950 (year 1972),  Features Intersected: RTE 43,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 2.285,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 1092622,  Location: JCT OF RTS 43 & I90 (Lat: 42.644167,  Lng: -73.710739),  Route carried "under" structure: State highway 43,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 5,950 (year 1972),  Features Intersected: RTE 43,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 2.301,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 109302A,  Location: RAMP RT 9 NB TO DUNN BR (Lat: 42.641850,  Lng: -73.744269),  Route carried "under" structure: Ramp US ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1989),  Features Intersected: RAMP- DUNN TO BROADWAY,,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 109302B,  Location: RT 9 SB OFF DUNN BR (Lat: 42.642092,  Lng: -73.745306),  Route carried "under" structure: Ramp US ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,420 (year 2013),  Features Intersected: RAMP- DUNN TO BROADWAY,,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 202533,  Location: .5 MI E JCT US 9 & US 20 (Lat: 42.637203,  Lng: -73.741258),  Route carried "under" structure: City street ,  Year Built: 1929,  Structure Length: 0. m,  Average Daily Traffic: 1,489 (year 2017),  Truck Traffic: 8%,  Features Intersected: EAST STREET, MILL CREEK,,  Facility Carried by Structure: RTE 151
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 220222,  Location: CITY OF RENSSELAER (Lat: 42.644864,  Lng: -73.741117),  Route carried "under" structure: ServiceOther road ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2015),  Features Intersected: CSX TRANS/ AMTRAK, AMTRA,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 72015,  Location: .5 MI W JCT RT 63 & AIKEN (Lat: 42.634156,  Lng: -73.742181),  Route carried "under" structure: City street ,  Year Built: 1910,  Structure Length: 0. m,  Features Intersected: AIKEN AVENUE,  Facility Carried by Structure: AMTRAK
Minimum Vertical Clearance: 3.78m (12.40ft),  Kilometerpoint: 0.756,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 72016,  Location: CITY OF RENSS.SECOND AVE. (Lat: 42.635811,  Lng: -73.741903),  Route carried "under" structure: City street ,  Year Built: 1930,  Structure Length: 0. m,  Features Intersected: SECOND AVENUE,  Facility Carried by Structure: AMTRAK
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.306,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Discuss Rensselaer, New York (NY) on our hugely popular New York forum.