Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Providence, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 52ft / 15.9mTotal length
  • $7,403,000Total costs
  • 5,784Total average daily traffic
  • 324Total average daily truck traffic
  • 7,525Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Providence
  • No street view available for this location

New bridges in Providence, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 11930-1939
  • 11950-1959
  • 11980-1989
  • 21990-1999
  • 42000-2009
  • 22010-2019
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 18.2%Very good
  • 36.4%Good
  • 18.2%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Excellent
  • 54.5%Very good
  • 9.1%Good
  • 9.1%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 36.4%Very good
  • 36.4%Good
  • 27.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 42.9%Good
  • 21.4%Satisfactory
  • 7.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Excellent
  • 33.3%Very good
Find on map >>   Show street view

Structure Number: 22028,  Location: 4.5 MI W LAKE DESOLATION (Lat: 43.130339,  Lng: -74.080267),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 38 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 53 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HANS CREEK,  Facility Carried by Structure: HANS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.3m (50.2ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $977,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 220281,  Location: 4 MI NNW JCT SH 147 & 29 (Lat: 43.131208,  Lng: -74.078311),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 38 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 53 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HANS CREEK,  Facility Carried by Structure: HANS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $579,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $918,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 220282,  Location: 4MI NNWJCT NY 147& NY29 (Lat: 43.131475,  Lng: -74.076708),  Route carried "on" structure: Other road ,  Year Built: 1914,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 38 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 53 (year 2040),  Design Load: HL 93,  Features Intersected: HANS CREEK,  Facility Carried by Structure: HANS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.800,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $399,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220283,  Location: 4 MI N NW JCT NY147+NY29 (Lat: 43.130939,  Lng: -74.074892),  Route carried "on" structure: Other road ,  Year Built: 1982,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 38 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 53 (year 2040),  Design Load: HS 20,  Features Intersected: HANS CREEK,  Facility Carried by Structure: HANS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $666,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220284,  Location: 4 MI NW JCT NY147(Lat: 43.123122,  Lng: -74.090669),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 47 (year 2020),  Average Future Daily Traffic: 66 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HANS CREEK,  Facility Carried by Structure: SLEEZER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $525,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 226,  Location: 3 MI NE JCT NY29&NY147 (Lat: 43.102383,  Lng: -73.998453),  Route carried "on" structure: Other road ,  Year Built: 1907,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 469 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 657 (year 2040),  Features Intersected: ALDER CREEK,  Facility Carried by Structure: ANTIOCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $464,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226004,  Location: 1.5 MI NW JCT SH149 &SH29 (Lat: 43.080572,  Lng: -74.074767),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 905 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,267 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ALDER CREEK,  Facility Carried by Structure: POTTER HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $404,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227114,  Location: 0.15 m E Wileytown Rd. (Lat: 43.124722,  Lng: -74.006722),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 0.79m (2.59ft),  Design Load: HS 25 or greater,  Features Intersected: LAKE NANCY INLET,  Facility Carried by Structure: BLACK BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $228,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330427,  Location: 4 MI NNW JCT SH147 & SH29 (Lat: 43.129608,  Lng: -74.081300),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 38 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 53 (year 2040),  Design Load: H 20,  Features Intersected: HANS CREEK,  Facility Carried by Structure: HANS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.349,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $731,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330428,  Location: 2 MI NW JCT NY147&NY29 (Lat: 43.075031,  Lng: -74.098653),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,603 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,672 (year 2040),  Features Intersected: KENYETTO CREEK,  Facility Carried by Structure: FISH HOUSE RD CR14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $339,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330472,  Location: 2.5 MI NE RT.29 & 147 (Lat: 43.089078,  Lng: -74.038581),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 405 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 567 (year 2037),  Design Load: HS 20,  Features Intersected: ALDER CREEK,  Facility Carried by Structure: CR16 BARKRSVLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.910,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $285,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330473,  Location: 2.5 MI NE SH 29 < SH 147 (Lat: 43.088694,  Lng: -74.038914),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 389 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 545 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ALDER CREEK,  Facility Carried by Structure: CR 13,FAYVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $397,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330474,  Location: 2.8 MI NW NY29(Lat: 43.088586,  Lng: -74.078069),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 888 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,243 (year 2037),  Design Load: H 20,  Features Intersected: CADMAN CREEK,  Facility Carried by Structure: BARKERSVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Excellent,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $364,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330475,  Location: 6 MI S OF EDINBURG (Lat: 43.127775,  Lng: -74.102375),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 888 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,243 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: HANS CREEK,  Facility Carried by Structure: CR 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.155,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $706,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Providence, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.