Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Palmdale, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 55Number of bridges
  • 636ft / 194mTotal length
  • $188,000Total costs
  • 2,127,361Total average daily traffic
  • 100,755Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Palmdale
  • No street view available for this location

New bridges in Palmdale, CA - historical statistics
  • New bridges - historical statistics
  • 61950-1959
  • 211960-1969
  • 231970-1979
  • 21990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Palmdale, CA
Average Bridge Truck Traffic in Palmdale, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 56.3%Good
  • 9.4%Satisfactory
  • 28.1%Fair
  • 6.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 90.6%Good
  • 3.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.9%Good
  • 3.1%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 36.0%Excellent
  • 32.0%Very good
  • 24.0%Good
  • 8.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Very good
  • 58.3%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: AF69TTQK002501,  Location: Site 2 North Entrance/20t (Lat: 34.645267,  Lng: -118.093328),  Route carried "on" structure: ServiceOther road ,  Year Built: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 20 (year 2017),  Average Future Daily Traffic: 24 (year 2037),  Features Intersected: ANAVERDE CREEK,  Facility Carried by Structure: SITE 2 NORTH ACCES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Air Force,  Approaching Roadway Width: 8.9m (29.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $75,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: AF69TTQK009606,  Location: 0.1 miles north of 25th S (Lat: 34.609617,  Lng: -118.085367),  Route carried "on" structure: ServiceOther road ,  Year Built: 1954,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 40 (year 2017),  Average Future Daily Traffic: 48 (year 2037),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: 25TH STREET ENTRY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Air Force,  Approaching Roadway Width: 8.2m (26.9ft),  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 0.9m (3.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $30,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: AF69TTQK009607,  Location: East of Taxiway Sierra at (Lat: 34.624511,  Lng: -118.072472),  Route carried "on" structure: ServiceOther road ,  Year Built: 1954,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 10 (year 2017),  Average Future Daily Traffic: 12 (year 2037),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: PERIMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Air Force,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 0.9m (3.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $30,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 53 1419,  Location: 07-LA-014-R59.78-PMDL (Lat: 34.580964,  Lng: -118.133525),  Route carried "under" structure: State highway 138,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 33,250 (year 2017),  Truck Traffic: 5%,  Features Intersected: STATE RTE 138,  Facility Carried by Structure: STATE RTE 14
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 43.420,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.1m (59.4ft)

Find on map >>   Show street view

Structure Number: 53 1794,  Location: 07-LA-014-R57.37 (Lat: 34.546033,  Lng: -118.130739),  Route carried "under" structure: State highway 14,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: CALIFORNIA AQUEDUCT,RT14,  Facility Carried by Structure: BARREL SPRG RD OC
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 57.370,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 53 2033,  Location: 07-LA-138-51.06 (Lat: 34.546169,  Lng: -118.034625),  Route carried "under" structure: State highway 138,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 37,000 (year 2009),  Truck Traffic: 4%,  Features Intersected: ST RTE 138 (FT TEJON RD),  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 51.060,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 2178L,  Location: 07-LA-014-R60.70-PMDL (Lat: 34.594278,  Lng: -118.134581),  Route carried "under" structure: City street Q012,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2017),  Truck Traffic: 2%,  Features Intersected: TECHNOLOGY DRIVE,  Facility Carried by Structure: STATE ROUTE 14
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.6m (133.2ft)

Find on map >>   Show street view

Structure Number: 53 2178R,  Location: 07-LA-014-R60.70-PMDL (Lat: 34.594267,  Lng: -118.134269),  Route carried "under" structure: City street Q012,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2017),  Truck Traffic: 2%,  Features Intersected: TECHNOLOGY DRIVE,  Facility Carried by Structure: STATE ROUTE 14
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.2m (141.7ft)

Find on map >>   Show street view

Structure Number: 53 2179,  Location: 07-LA-014-R62.66 (Lat: 34.616444,  Lng: -118.153692),  Route carried "under" structure: State highway 14,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 89,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: ROUTE 14,  Facility Carried by Structure: AVENUE "O"
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 62.660,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 53 2222,  Location: 07-LA-014-R63.67 (Lat: 34.631044,  Lng: -118.153617),  Route carried "under" structure: State highway 14,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 92,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: ROUTE 14,  Facility Carried by Structure: AVENUE "N"
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 63.670,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 53 2376L,  Location: 07-LA-014-R61.37-PMDL (Lat: 34.601508,  Lng: -118.142433),  Route carried "under" structure: City street Q014,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 9,800 (year 2017),  Truck Traffic: 2%,  Features Intersected: RANCHO VISTA BOULEVARD,  Facility Carried by Structure: ROUTE 14 SB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.0m (157.5ft)

Find on map >>   Show street view

Structure Number: 53 2376R,  Location: 07-LA-014-R61.37-PMDL (Lat: 34.601506,  Lng: -118.142003),  Route carried "under" structure: City street Q014,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 9,800 (year 2017),  Truck Traffic: 2%,  Features Intersected: RANCHO VISTA BOULEVARD,  Facility Carried by Structure: ROUTE 14 NB
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.0m (157.5ft)

Find on map >>   Show street view

Structure Number: 53C0324,  Location: 1.0MI S/O PALMDALE BLVD (Lat: 34.567331,  Lng: -118.115000),  Route carried "under" structure: City street L639,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 7,242 (year 2012),  Truck Traffic: 3%,  Features Intersected: SIERRA HWY,  Facility Carried by Structure: SP/UP RR
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 53C081,  Location: 0.3MI S/O AVE S (Lat: 34.554953,  Lng: -118.086069),  Route carried "under" structure: City street Q026,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 24,960 (year 2012),  Truck Traffic: 2%,  Features Intersected: 25TH ST E,  Facility Carried by Structure: SPTC RR
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 14.9m (48.9ft)

Discuss Palmdale, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.