Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oro Valley, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 860ft / 262mTotal length
  • $1,000Total costs
  • 267,477Total average daily traffic
  • 15,702Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oro Valley
  • No street view available for this location

New bridges in Oro Valley, AZ - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11960-1969
  • 81980-1989
  • 291990-1999
  • 62000-2009
  • 32010-2019
Average Bridge Daily Traffic in Oro Valley, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 23.1%Good
  • 69.2%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 61.5%Very good
  • 38.5%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.1%Very good
  • 76.9%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Very good
  • 75.6%Good
  • 20.0%Satisfactory
  • 2.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.8%Very good
  • 85.3%Good
  • 2.9%Satisfactory
Find on map >>   Show street view

Structure Number: 20052,  Location: 2.1 mi N Tangerine Rd (Lat: 32.456200,  Lng: -110.930500),  Route carried "under" structure: Other road ,  Year Built: 2015,  Structure Length: 0. m,  Features Intersected: Wildlife Crossing,  Facility Carried by Structure: SR 77
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.5m (50.9ft)

Discuss Oro Valley, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.