  • 45Number of bridges
  • 620ft / 189mTotal length
  • $20,419,000Total costs
  • 1,400,283Total average daily traffic
  • 140,851Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Newark
  • No street view available for this location

New bridges in Newark, DE - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 21940-1949
  • 21950-1959
  • 211960-1969
  • 91970-1979
  • 31980-1989
  • 11990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Newark, DE - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 41970-1979
  • 21980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Newark, DE
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.7%Very good
  • 51.9%Good
  • 40.7%Satisfactory
  • 3.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.4%Good
  • 55.2%Satisfactory
  • 3.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.3%Good
  • 79.3%Satisfactory
  • 10.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.0%Very good
  • 24.0%Good
  • 52.0%Satisfactory
  • 12.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 55.6%Good
  • 44.4%Satisfactory
Find on map >>   Show street view

Structure Number: 1229 303,  Location: EAST OF NEWARK (Lat: 39.696139,  Lng: -75.719658),  Route carried "on" structure: County highway 303,  Year Built: 2000,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 316 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 392 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: MIDDLE RUN,  Facility Carried by Structure: OLD POSSUM PARK RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.140,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $60,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1229A011,  Location: EAST OF NEWARK (Lat: 39.694322,  Lng: -75.720325),  Route carried "on" structure: State highway 2,  Year Built: 1948,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 25,648 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 31,878 (year 2042),  Features Intersected: MUDDY RUN
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 8.290,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1229B011,  Location: WINDY HILLS, N/E NEWARK (Lat: 39.692450,  Lng: -75.724203),  Route carried "on" structure: State highway 2,  Year Built: 1955,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 15.16m (49.74ft),  Average Daily Traffic: 20,390 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,343 (year 2043),  Design Load: HS 20,  Features Intersected: WHITE CLAY CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 7.837,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.12m (49.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,992,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $4,488,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1231 013,  Location: NORTH NEWARK (Lat: 39.689422,  Lng: -75.748717),  Route carried "on" structure: County highway 13,  Year Built: 1947,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 17,396 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,621 (year 2042),  Design Load: H 20,  Features Intersected: WHITE CLAY CREEK,  Facility Carried by Structure: PAPER MILL RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.690,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $936,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1274 312,  Location: N/W OF NEWARK (Lat: 39.706519,  Lng: -75.785153),  Route carried "on" structure: County highway 312,  Year Built: 2014,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,186 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,474 (year 2042),  Design Load: HS 20,  Features Intersected: E. BRANCH CHRISTINA CRK,  Facility Carried by Structure: WEDGEWOOD RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.510,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.14m (3.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $312,000
Find on map >>   Show street view

Structure Number: 1275 312,  Location: WEST OF NEWARK (Lat: 39.700572,  Lng: -75.787272),  Route carried "on" structure: County highway 312,  Year Built: 1969,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,186 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,474 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: WEDGEWOOD RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1276 041,  Location: NEWARK (Lat: 39.690700,  Lng: -75.776822),  Route carried "on" structure: State highway 273,  Year Built: 1991,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 6,877 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,628 (year 2043),  Design Load: HS 25 or greater,  Features Intersected: CHRISTINA CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 1277 363,  Location: N/W NEWARK (Lat: 39.689058,  Lng: -75.777089),  Route carried "on" structure: County highway 363,  Year Built: 1968,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 561 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 697 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: CHURCH RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1280 36,  Location: WEST OF NEWARK (Lat: 39.677553,  Lng: -75.781019),  Route carried "on" structure: County highway 360,  Year Built: 1962,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,011 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,228 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: BARKSDALE RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.630,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.9m (45.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1281 366,  Location: NEWARK (Lat: 39.664089,  Lng: -75.773961),  Route carried "on" structure: State highway 4,  Year Built: 1980,  Status: Open,  Structure Length: 8.42m (27.62ft),  Average Daily Traffic: 36,174 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 45,388 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: CHRISTINA PARKWAY
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.1m (46.3ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1282 366,  Location: NEWARK (Lat: 39.662886,  Lng: -75.772197),  Route carried "on" structure: State highway 4,  Year Built: 1980,  Status: Open,  Structure Length: 11.52m (37.80ft),  Average Daily Traffic: 36,174 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,388 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: AMTRAK & CONRAIL,  Facility Carried by Structure: CHRISTINA PARKWAY
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.1m (46.3ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1320 397,  Location: WEST OF NEWARK (Lat: 39.654736,  Lng: -75.781733),  Route carried "on" structure: County highway 397,  Year Built: 1977,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,431 (year 2042),  Design Load: HS 20,  Features Intersected: AMTRAK,  Facility Carried by Structure: OTTS CHAPEL RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 3.347,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1322 011,  Location: S/W OF NEWARK (Lat: 39.669375,  Lng: -75.771672),  Route carried "on" structure: State highway 2,  Year Built: 1968,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 28,734 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 35,714 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CHRISTINA CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 2.250,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.7m (48.2ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 30.0m (98.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1323 011,  Location: S/W NEWARK (Lat: 39.656458,  Lng: -75.786058),  Route carried "on" structure: State highway 2,  Year Built: 1968,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 30,426 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,817 (year 2042),  Design Load: HS 20,  Features Intersected: WEST BRANCH
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.350,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 30.2m (99.1ft),  Out-to-Out Width: 39.9m (130.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1324 397,  Location: WEST OF NEWARK (Lat: 39.655731,  Lng: -75.782578),  Route carried "on" structure: County highway 397,  Year Built: 1972,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,431 (year 2042),  Design Load: HS 20,  Features Intersected: WEST BRANCH,  Facility Carried by Structure: OTTS CHAPEL RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 3.490,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 1325 397,  Location: S.W. OF NEWARK (Lat: 39.651272,  Lng: -75.780239),  Route carried "on" structure: County highway 397,  Year Built: 2010,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,144 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: PERSIMMON RUN,  Facility Carried by Structure: OTTS CHAPEL RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 3.042,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 26.1m (85.6ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 33.8m (110.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 1326 364,  Location: SOUTH NEWARK (Lat: 39.653583,  Lng: -75.754417),  Route carried "on" structure: County highway 364,  Year Built: 1961,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.66m (5.45ft),  Average Daily Traffic: 8,596 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,684 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: W.CHESTNUT HILL RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 3.220,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $285,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1327 364,  Location: SOUTH NEWARK (Lat: 39.654264,  Lng: -75.753367),  Route carried "on" structure: County highway 364,  Year Built: 1984,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 8,596 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,785 (year 2043),  Design Load: HS 20,  Features Intersected: TRIB OF CHRISTINA CRK,  Facility Carried by Structure: CHESTNUT HILL RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1336 026,  Location: S. OF NEWARK (Lat: 39.640028,  Lng: -75.736236),  Route carried "on" structure: County highway 26,  Year Built: 1922,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 21,137 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 26,271 (year 2042),  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: OLD BALTIMORE PIKE
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.764,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $354,000
Find on map >>   Show street view

Structure Number: 1341 6014,  Location: SOUTH NEWARK (Lat: 39.649044,  Lng: -75.748261),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1970,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 862 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,071 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.130,  Lanes on structure: 1,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.7m (61.4ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1345 367,  Location: SOUTH NEWARK (Lat: 39.651017,  Lng: -75.750769),  Route carried "on" structure: County highway 367,  Year Built: 1961,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 5,826 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,241 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: WELSH TRACT RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $285,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1555 356,  Location: NEWARK (Lat: 39.675308,  Lng: -75.736194),  Route carried "on" structure: State highway 72,  Year Built: 1979,  Status: Open,  Structure Length: 12.16m (39.90ft),  Average Daily Traffic: 34,746 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 43,186 (year 2042),  Design Load: HS 20,  Features Intersected: AMTRAK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 14.082,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1622 314,  Location: EAST OF NEWARK (Lat: 39.695342,  Lng: -75.720153),  Route carried "on" structure: State highway 72,  Year Built: 1953,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 14,399 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,066 (year 2043),  Design Load: HS 20,  Features Intersected: MIDDLE RUN
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.097,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1641 387,  Location: NEWARK (Lat: 39.670119,  Lng: -75.753039),  Route carried "on" structure: State highway 896,  Year Built: 1936,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 17.13m (56.20ft),  Average Daily Traffic: 18,612 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,133 (year 2042),  Design Load: HS 20,  Features Intersected: AMTRAK & CONRAIL,  Facility Carried by Structure: S. COLLEGE AVE
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 12.710,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1645 351,  Location: NEWARK (Lat: 39.677475,  Lng: -75.729250),  Route carried "on" structure: County highway 351,  Year Built: 1976,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 12,050 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,977 (year 2042),  Design Load: HS 20,  Features Intersected: AMTRAK,  Facility Carried by Structure: MARROWS RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.640,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1649 387,  Location: SOUTH NEWARK (Lat: 39.649100,  Lng: -75.747589),  Route carried "on" structure: State highway 896,  Year Built: 1962,  Status: Open,  Structure Length: 3.76m (12.34ft),  Average Daily Traffic: 17,498 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,748 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: S. COLLEGE AVE. NB
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 10.490,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.8m (68.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $840,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1649A387,  Location: SOUTH NEWARK (Lat: 39.649075,  Lng: -75.747783),  Route carried "on" structure: State highway 896,  Year Built: 1970,  Status: Open,  Structure Length: 3.70m (12.14ft),  Average Daily Traffic: 17,498 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,748 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK,  Facility Carried by Structure: S. COLLEGE AVE. SB
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 18.230,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.8m (68.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1672 026,  Location: S. OF NEWARK (Lat: 39.641350,  Lng: -75.733058),  Route carried "on" structure: County highway 26,  Year Built: 2000,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 15,080 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,743 (year 2042),  Design Load: HS 20,  Features Intersected: TRIB. TO CHRISTINA CREEK,  Facility Carried by Structure: OLD BALTIMORE PIKE
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 5.102,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1696 36,  Location: NEWARK (Lat: 39.678917,  Lng: -75.764003),  Route carried "on" structure: County highway 360,  Year Built: 1970,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 681 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 846 (year 2042),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: APPLE RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 2.160,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,035,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1702 367,  Location: SOUTH OF NEWARK (Lat: 39.646675,  Lng: -75.758833),  Route carried "on" structure: County highway 367,  Year Built: 1962,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 5,826 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,241 (year 2042),  Design Load: HS 20,  Features Intersected: I 95 / JFK MEM HGWY,  Facility Carried by Structure: WELSH TRACT RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.1m (85.6ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1703 387,  Location: SOUTH OF NEWARK (Lat: 39.646906,  Lng: -75.746011),  Route carried "on" structure: State highway 896,  Year Built: 1963,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 24,512 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,466 (year 2042),  Design Load: HS 20,  Features Intersected: I 95 / JFK MEM HGWY,  Facility Carried by Structure: S. COLLEGE AVE. NB
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 10.187,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.1m (108.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1703A387,  Location: SOUTH OF NEWARK (Lat: 39.646903,  Lng: -75.746247),  Route carried "on" structure: State highway 896,  Year Built: 1970,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 24,512 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,466 (year 2042),  Design Load: HS 20,  Features Intersected: I 95, DELAWARE TURNPIKE,  Facility Carried by Structure: S. COLLEGE AVE. SB
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 10.187,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.1m (108.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1704 056,  Location: SOUTH NEWARK (Lat: 39.647058,  Lng: -75.742486),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.55m (11.65ft),  Average Daily Traffic: 50,098 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 62,268 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 49.053,  Lanes on structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1705 056,  Location: SOUTH NEWARK (Lat: 39.646817,  Lng: -75.742444),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.61m (11.84ft),  Average Daily Traffic: 63,628 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 79,084 (year 2042),  Design Load: HS 20,  Features Intersected: CHRISTINA CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.088,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.61m (11.84ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1706 056,  Location: SOUTH OF NEWARK (Lat: 39.648094,  Lng: -75.734867),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 154,413 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 191,924 (year 2042),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.731,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 47.5m (155.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.9m (29.2ft),  Curb-To-Curb Width: 49.4m (162.1ft),  Out-to-Out Width: 51.5m (169.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1708 056,  Location: SOUTH OF NEWARK (Lat: 39.648922,  Lng: -75.732078),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 63,629 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 79,086 (year 2042),  Design Load: HS 20,  Features Intersected: SR72
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.989,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.5m (70.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 21.5m (70.5ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1709 056,  Location: SOUTH OF NEWARK (Lat: 39.648681,  Lng: -75.732008),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 63,629 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 79,086 (year 2042),  Design Load: HS 20,  Features Intersected: SR 72/S. CHAPER ST.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.989,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 21.1m (69.2ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1711 348,  Location: EAST OF NEWARK (Lat: 39.658550,  Lng: -75.696872),  Route carried "on" structure: County highway 348,  Year Built: 1963,  Status: Open,  Structure Length: 15.62m (51.25ft),  Average Daily Traffic: 14,585 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,128 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: I 95 / JFK MEM HGWY,  Facility Carried by Structure: SALEM CHURCH RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 43.7m (143.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.64m (51.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,949,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,924,000,  Deck Structure Type: Concrete Cast-file-Place