Bridge Statistics for Milan, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 60Number of bridges
  • 614ft / 187mTotal length
  • $13,150,000Total costs
  • 159,062Total average daily traffic
  • 14,914Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Milan
  • No street view available for this location

New bridges in Milan, TN - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 41950-1959
  • 11960-1969
  • 151970-1979
  • 131980-1989
  • 121990-1999
  • 42000-2009
  • 62010-2019
  • 12020-2022
Reconstructed bridges in Milan, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Milan, TN
Average Bridge Truck Traffic in Milan, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.0%Very good
  • 52.5%Good
  • 30.0%Satisfactory
  • 10.0%Fair
  • 2.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 22.5%Good
  • 40.0%Satisfactory
  • 22.5%Fair
  • 2.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.5%Very good
  • 37.5%Good
  • 30.0%Satisfactory
  • 22.5%Fair
  • 2.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.4%Good
  • 68.5%Satisfactory
  • 9.3%Fair
  • 1.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 29.4%Good
  • 41.2%Satisfactory
  • 23.5%Fair
  • 5.9%Poor
Find on map >>   Show street view

Structure Number: 27SR0760017,  Location: IN MILAN CITY LIMITS (Lat: 35.929367,  Lng: -88.736033),  Route carried "on" structure: Alternate US 70,  Year Built: 2013,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 7,446 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,136 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.410,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: 27SR0760,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,000,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0760019,  Location: 1.9 MI.E.OF MILAN (Lat: 35.946444,  Lng: -88.713889),  Route carried "on" structure: Alternate US 70,  Year Built: 2013,  Status: Open,  Structure Length: 14.63m (48.00ft),  Average Daily Traffic: 6,734 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,368 (year 2039),  Design Load: HL 93,  Features Intersected: RUTHERFORD FK.OBION RIVE,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.122,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 27SR0760,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.5m (80.4ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 27SR076002,  Location: 1.9 MI.E.OF MILAN (Lat: 35.946233,  Lng: -88.714217),  Route carried "on" structure: Alternate US 70,  Year Built: 2013,  Status: Open,  Structure Length: 14.63m (48.00ft),  Average Daily Traffic: 6,734 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,368 (year 2039),  Design Load: HL 93,  Features Intersected: RUTHERFORD FK.OBION RIVE,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.122,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 27SR0760,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.5m (80.4ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 27SR0760021,  Location: IN MILAN CITY LIMITS (Lat: 35.944633,  Lng: -88.715800),  Route carried "on" structure: Alternate US 70,  Year Built: 2012,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 6,734 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,368 (year 2039),  Design Load: HS 20,  Features Intersected: OVERFLOW,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.881,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 27SR0760,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 27SR0770019,  Location: 0.40 MI.E. JCT. FAS 8177 (Lat: 35.941917,  Lng: -88.833972),  Route carried "on" structure: State highway 77,  Year Built: 1984,  Status: Open,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 2,459 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,934 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.017,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 27SR0770,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 27SR1040023,  Location: IN MILAN CITY LIMITS (Lat: 35.912972,  Lng: -88.745278),  Route carried "on" structure: State highway 104,  Year Built: 1984,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 2,510 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,288 (year 2039),  Design Load: HS 20,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.414,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 27SR1040,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,249,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPAMCHOL000001,  Location: HOLSTON AAP PLANT A (Lat: 36.530569,  Lng: -82.550311),  Route carried "on" structure: ServiceOther road ,  Year Built: 1950,  Status: Closed,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 75 (year 2040),  Features Intersected: MADD CREEK,  Facility Carried by Structure: ROAD 910
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Good,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $576,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPAMCMAP00011A,  Location: SOUTH OF ROUTE 20 (Lat: 35.860631,  Lng: -88.733511),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2042),  Features Intersected: WEST FORK WOLF CR,  Facility Carried by Structure: ROUTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.91m (6.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B02,  Location: MILAN AAP (Lat: 35.887719,  Lng: -88.667311),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,400 (year 2042),  Design Load: HS 20,  Features Intersected: HALLS BRANCH CREEK,  Facility Carried by Structure: ROUTE 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B03,  Location: MILAN AAP (Lat: 35.861000,  Lng: -88.699831),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,400 (year 2042),  Design Load: HS 20,  Features Intersected: HALLS BRANCH CREEK,  Facility Carried by Structure: ROUTE 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.36m (7.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B04,  Location: MILAN AAP (Lat: 35.870139,  Lng: -88.726469),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,400 (year 2042),  Design Load: HS 20,  Features Intersected: WEST WOLF CREEK,  Facility Carried by Structure: ROUTE 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B05,  Location: MILAN AAP (Lat: 35.874561,  Lng: -88.721061),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,400 (year 2042),  Design Load: HS 20,  Features Intersected: EAST FORK WOLF CREEK,  Facility Carried by Structure: ROUTE 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B06,  Location: MILAN AAP (Lat: 35.902419,  Lng: -88.731219),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,400 (year 2042),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: ROUTE 85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.12m (10.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B08,  Location: MILAN AAP (Lat: 35.848361,  Lng: -88.715811),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 2.11m (6.92ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 60%,  Average Future Daily Traffic: 400 (year 2042),  Design Load: HS 20,  Features Intersected: CROSSING DRY CREEK,  Facility Carried by Structure: ROUTE 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B09,  Location: MILAN AAP (Lat: 35.859361,  Lng: -88.721169),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 60%,  Average Future Daily Traffic: 400 (year 2042),  Design Load: HS 20,  Features Intersected: CROSSING DRY CREEK,  Facility Carried by Structure: ROUTE A8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPAMCMAP000B1,  Location: MILAN AAP (Lat: 35.860361,  Lng: -88.700111),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 60%,  Average Future Daily Traffic: 400 (year 2042),  Design Load: HS 20,  Features Intersected: EAST WOLF CREEK,  Facility Carried by Structure: PATRO ROAD NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.7m (51.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9SR1040017,  Location: MILAN ARSENAL (Lat: 35.910389,  Lng: -88.692772),  Route carried "under" structure: State highway 104,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,348 (year 2020),  Truck Traffic: 5%,  Features Intersected: BRANCH
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.660,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Deck,  Length of Maximum Span: 12.0m (39.4ft)

Find on map >>   Show street view

Structure Number: 27015880007,  Location: .7 MI NW JCT SR43&SR104 (Lat: 35.921111,  Lng: -88.761222),  Route carried "under" structure: City street 1588,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 677 (year 2020),  Truck Traffic: 3%,  Features Intersected: ICG RAILROAD
Minimum Vertical Clearance: 2.79m (9.15ft),  Kilometerpoint: 8.256,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 4.0m (13.1ft)

Find on map >>   Show street view

Structure Number: 27SR0760015,  Location: IN MILAN (Lat: 35.926750,  Lng: -88.739333),  Route carried "under" structure: Alternate US 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 7,446 (year 2020),  Truck Traffic: 9%,  Features Intersected: CSX RR / SR 76,  Facility Carried by Structure: CSX RR
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 22.008,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Discuss Milan, Tennessee (TN) on our hugely popular Tennessee forum.