Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,325Number of bridges
- 39,718ft / 12,106mTotal length
- $98,718,000Total costs
- 180,570,830Total average daily traffic
- 9,950,919Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Los Angeles
- No street view available for this location
- New bridges - historical statistics
- 121900-1909
- 41910-1919
- 431920-1929
- 721930-1939
- 1701940-1949
- 5201950-1959
- 6961960-1969
- 3091970-1979
- 1881980-1989
- 2231990-1999
- 512000-2009
- 372010-2019
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 31930-1939
- 51940-1949
- 181950-1959
- 501960-1969
- 341970-1979
- 461980-1989
- 421990-1999
- 702000-2009
- 132010-2019
- Bridge Condition - Deck
- 81.7%Good
- 1.1%Satisfactory
- 15.5%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 0.5%Very good
- 89.2%Good
- 1.1%Satisfactory
- 9.2%Fair
- Bridge Condition - Substructure
- 94.1%Good
- 2.3%Satisfactory
- 3.4%Fair
- 0.2%Poor
- Bridge Condition - Channel
- 16.2%Excellent
- 77.2%Very good
- 2.7%Good
- 2.2%Satisfactory
- 1.7%Fair
- 0.5%Poor
- 0.2%Serious
- Bridge Condition - Culverts
- 76.5%Good
- 23.5%Satisfactory
Find on map >> Show street view
Structure Number: 53 2017L, Location: 07-LA-210-R0.84-LA (Lat: 34.322953, Lng: -118.479436), Route carried "under" structure: City street L893, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 2,100 (year 2016), Truck Traffic: 2%, Features Intersected: YARNELL STREET, Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.8m (147.0ft)
Structure Number: 53 2017L, Location: 07-LA-210-R0.84-LA (Lat: 34.322953, Lng: -118.479436), Route carried "under" structure: City street L893, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 2,100 (year 2016), Truck Traffic: 2%, Features Intersected: YARNELL STREET, Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.8m (147.0ft)
Find on map >> Show street view
Structure Number: 53 2017R, Location: 07-LA-210-R0.84-LA (Lat: 34.322744, Lng: -118.479386), Route carried "under" structure: City street L893, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 2,100 (year 2016), Truck Traffic: 2%, Features Intersected: YARNELL STREET, Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.8m (147.0ft)
Structure Number: 53 2017R, Location: 07-LA-210-R0.84-LA (Lat: 34.322744, Lng: -118.479386), Route carried "under" structure: City street L893, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 2,100 (year 2016), Truck Traffic: 2%, Features Intersected: YARNELL STREET, Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.8m (147.0ft)
Find on map >> Show street view
Structure Number: 53 2018, Location: 07-LA-002-R17.52-LA (Lat: 34.128228, Lng: -118.229133), Route carried "under" structure: State highway 2, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 143,000 (year 2011), Truck Traffic: 8%, Features Intersected: STATE ROUTE 2, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 17.520, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 53 2018, Location: 07-LA-002-R17.52-LA (Lat: 34.128228, Lng: -118.229133), Route carried "under" structure: State highway 2, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 143,000 (year 2011), Truck Traffic: 8%, Features Intersected: STATE ROUTE 2, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 17.520, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 53 2031L, Location: 07-LA-047-R0.17-LA (Lat: 33.748856, Lng: -118.288097), Route carried "under" structure: City street , Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 17,200 (year 2020), Truck Traffic: 2%, Features Intersected: PACIFIC AVE, Facility Carried by Structure: STATE ROUTE 47 WB
Minimum Vertical Clearance: 7.21m (23.65ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2031L, Location: 07-LA-047-R0.17-LA (Lat: 33.748856, Lng: -118.288097), Route carried "under" structure: City street , Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 17,200 (year 2020), Truck Traffic: 2%, Features Intersected: PACIFIC AVE, Facility Carried by Structure: STATE ROUTE 47 WB
Minimum Vertical Clearance: 7.21m (23.65ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2031R, Location: 07-LA-047-R0.17-LA (Lat: 33.748422, Lng: -118.288097), Route carried "under" structure: City street , Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 17,200 (year 2020), Truck Traffic: 2%, Features Intersected: PACIFIC AVE, Facility Carried by Structure: STATE ROUTE 47 EB
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.1m (134.8ft)
Structure Number: 53 2031R, Location: 07-LA-047-R0.17-LA (Lat: 33.748422, Lng: -118.288097), Route carried "under" structure: City street , Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 17,200 (year 2020), Truck Traffic: 2%, Features Intersected: PACIFIC AVE, Facility Carried by Structure: STATE ROUTE 47 EB
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.1m (134.8ft)
Find on map >> Show street view
Structure Number: 53 2046, Location: 07-LA-110-R0.75-LA (Lat: 33.746486, Lng: -118.292544), Route carried "under" structure: State highway 110, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 44,250 (year 2009), Truck Traffic: 3%, Features Intersected: STATE ROUTE 110, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 0.750, Lanes under structure: 7, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 53 2046, Location: 07-LA-110-R0.75-LA (Lat: 33.746486, Lng: -118.292544), Route carried "under" structure: State highway 110, Year Built: 1970, Structure Length: 0. m, Average Daily Traffic: 44,250 (year 2009), Truck Traffic: 3%, Features Intersected: STATE ROUTE 110, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 0.750, Lanes under structure: 7, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 53 2058, Location: 07-LA-118-R1.47 (Lat: 34.277739, Lng: -118.610572), Route carried "under" structure: State highway 118, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 155,000 (year 2020), Truck Traffic: 5%, Features Intersected: SR 118, Facility Carried by Structure: MOVIE LANE
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 1.470, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.2m (108.9ft)
Structure Number: 53 2058, Location: 07-LA-118-R1.47 (Lat: 34.277739, Lng: -118.610572), Route carried "under" structure: State highway 118, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 155,000 (year 2020), Truck Traffic: 5%, Features Intersected: SR 118, Facility Carried by Structure: MOVIE LANE
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 1.470, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.2m (108.9ft)
Find on map >> Show street view
Structure Number: 53 2062K, Location: 07-LA-010-19.20-LA (Lat: 34.055539, Lng: -118.200856), Route carried "under" structure: Interstate 10, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2005), Truck Traffic: 1%, Features Intersected: METROLINK & I 10 BUSWAY
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 19.240, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 2062K, Location: 07-LA-010-19.20-LA (Lat: 34.055539, Lng: -118.200856), Route carried "under" structure: Interstate 10, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2005), Truck Traffic: 1%, Features Intersected: METROLINK & I 10 BUSWAY
Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 19.240, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 2063K, Location: 07-LA-010-19.25-LA (Lat: 34.056025, Lng: -118.200928), Route carried "under" structure: Interstate 10, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2005), Truck Traffic: 1%, Features Intersected: METROLINK & I-10 BUSWAY
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 19.280, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 2063K, Location: 07-LA-010-19.25-LA (Lat: 34.056025, Lng: -118.200928), Route carried "under" structure: Interstate 10, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2005), Truck Traffic: 1%, Features Intersected: METROLINK & I-10 BUSWAY
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 19.280, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 2095, Location: 07-LA-118-R12.40-LA (Lat: 34.272114, Lng: -118.428886), Route carried "under" structure: City street L352, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2010), Truck Traffic: 2%, Features Intersected: SAN FERNANDO RD, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.9m (127.6ft)
Structure Number: 53 2095, Location: 07-LA-118-R12.40-LA (Lat: 34.272114, Lng: -118.428886), Route carried "under" structure: City street L352, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2010), Truck Traffic: 2%, Features Intersected: SAN FERNANDO RD, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.9m (127.6ft)
Find on map >> Show street view
Structure Number: 53 2102G, Location: 07-LA-118-R13.94-LA (Lat: 34.285753, Lng: -118.410428), Route carried "under" structure: Interstate 210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 121,363 (year 2010), Truck Traffic: 6%, Features Intersected: ROUTE 210, PAXTON RA
Minimum Vertical Clearance: 9.75m (31.99ft), Kilometerpoint: 5.910, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 67.1m (220.1ft)
Structure Number: 53 2102G, Location: 07-LA-118-R13.94-LA (Lat: 34.285753, Lng: -118.410428), Route carried "under" structure: Interstate 210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 121,363 (year 2010), Truck Traffic: 6%, Features Intersected: ROUTE 210, PAXTON RA
Minimum Vertical Clearance: 9.75m (31.99ft), Kilometerpoint: 5.910, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 67.1m (220.1ft)
Find on map >> Show street view
Structure Number: 53 2103G, Location: 07-LA-118-R13.89-LA (Lat: 34.286431, Lng: -118.409297), Route carried "under" structure: City street 6210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 19,441 (year 2010), Truck Traffic: 2%, Features Intersected: PAXTON ST & FOOTHILL BL, Facility Carried by Structure: E118-E210 CONN
Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.0m (190.3ft)
Structure Number: 53 2103G, Location: 07-LA-118-R13.89-LA (Lat: 34.286431, Lng: -118.409297), Route carried "under" structure: City street 6210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 19,441 (year 2010), Truck Traffic: 2%, Features Intersected: PAXTON ST & FOOTHILL BL, Facility Carried by Structure: E118-E210 CONN
Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.0m (190.3ft)
Find on map >> Show street view
Structure Number: 53 2103G, Location: 07-LA-118-R13.89-LA (Lat: 34.286431, Lng: -118.409297), Route carried "under" structure: City street L608, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,479 (year 2012), Truck Traffic: 2%, Features Intersected: PAXTON ST & FOOTHILL BL, Facility Carried by Structure: E118-E210 CONN
Minimum Vertical Clearance: 7.11m (23.33ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.0m (190.3ft)
Structure Number: 53 2103G, Location: 07-LA-118-R13.89-LA (Lat: 34.286431, Lng: -118.409297), Route carried "under" structure: City street L608, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 10,479 (year 2012), Truck Traffic: 2%, Features Intersected: PAXTON ST & FOOTHILL BL, Facility Carried by Structure: E118-E210 CONN
Minimum Vertical Clearance: 7.11m (23.33ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.0m (190.3ft)
Find on map >> Show street view
Structure Number: 53 2104F, Location: 07-LA-210-R6.08-LA (Lat: 34.286950, Lng: -118.408947), Route carried "under" structure: Ramp Interstate 210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2015), Truck Traffic: 8%, Features Intersected: ROUTE 210, PAXTON, FOOTH
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.080, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 53 2104F, Location: 07-LA-210-R6.08-LA (Lat: 34.286950, Lng: -118.408947), Route carried "under" structure: Ramp Interstate 210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2015), Truck Traffic: 8%, Features Intersected: ROUTE 210, PAXTON, FOOTH
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.080, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 53 2104F, Location: 07-LA-210-R6.08-LA (Lat: 34.286950, Lng: -118.408947), Route carried "under" structure: Interstate 210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 108,000 (year 2017), Truck Traffic: 8%, Features Intersected: ROUTE 210, PAXTON, FOOTH
Minimum Vertical Clearance: 6.75m (22.15ft), Kilometerpoint: 6.080, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 53 2104F, Location: 07-LA-210-R6.08-LA (Lat: 34.286950, Lng: -118.408947), Route carried "under" structure: Interstate 210, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 108,000 (year 2017), Truck Traffic: 8%, Features Intersected: ROUTE 210, PAXTON, FOOTH
Minimum Vertical Clearance: 6.75m (22.15ft), Kilometerpoint: 6.080, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 53 212, Location: 07-LA-118-R13.68-LA (Lat: 34.284897, Lng: -118.412208), Route carried "under" structure: City street L603, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,350 (year 2010), Truck Traffic: 2%, Features Intersected: DRONFIELD AVENUE, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.8m (127.3ft)
Structure Number: 53 212, Location: 07-LA-118-R13.68-LA (Lat: 34.284897, Lng: -118.412208), Route carried "under" structure: City street L603, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,350 (year 2010), Truck Traffic: 2%, Features Intersected: DRONFIELD AVENUE, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.8m (127.3ft)
Find on map >> Show street view
Structure Number: 53 2137K, Location: 07-LA-134-R11.60-LA (Lat: 34.141761, Lng: -118.183789), Route carried "under" structure: State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 214,000 (year 2017), Truck Traffic: 3%, Features Intersected: STATE ROUTE 134
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 11.600, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 61.3m (201.1ft)
Structure Number: 53 2137K, Location: 07-LA-134-R11.60-LA (Lat: 34.141761, Lng: -118.183789), Route carried "under" structure: State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 214,000 (year 2017), Truck Traffic: 3%, Features Intersected: STATE ROUTE 134
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 11.600, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 61.3m (201.1ft)
Find on map >> Show street view
Structure Number: 53 214, Location: 07-LA-134-R11.68-LA (Lat: 34.142181, Lng: -118.182256), Route carried "under" structure: Ramp State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 11,801 (year 2014), Truck Traffic: 3%, Features Intersected: ST RTE 134 & OFF-RAMP, Facility Carried by Structure: PATRICIAN WAY
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 11.680, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.1m (154.5ft)
Structure Number: 53 214, Location: 07-LA-134-R11.68-LA (Lat: 34.142181, Lng: -118.182256), Route carried "under" structure: Ramp State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 11,801 (year 2014), Truck Traffic: 3%, Features Intersected: ST RTE 134 & OFF-RAMP, Facility Carried by Structure: PATRICIAN WAY
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 11.680, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.1m (154.5ft)
Find on map >> Show street view
Structure Number: 53 214, Location: 07-LA-134-R11.68-LA (Lat: 34.142181, Lng: -118.182256), Route carried "under" structure: State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 214,000 (year 2017), Truck Traffic: 3%, Features Intersected: ST RTE 134 & OFF-RAMP, Facility Carried by Structure: PATRICIAN WAY
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 11.690, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.1m (154.5ft)
Structure Number: 53 214, Location: 07-LA-134-R11.68-LA (Lat: 34.142181, Lng: -118.182256), Route carried "under" structure: State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 214,000 (year 2017), Truck Traffic: 3%, Features Intersected: ST RTE 134 & OFF-RAMP, Facility Carried by Structure: PATRICIAN WAY
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 11.690, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.1m (154.5ft)
Find on map >> Show street view
Structure Number: 53 2148K, Location: 07-LA-134-R11.52-LA (Lat: 34.141142, Lng: -118.185461), Route carried "under" structure: Ramp State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 6,401 (year 2014), Truck Traffic: 2%, Features Intersected: FIGUEROA ST-E134 ON RAMP
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 11.520, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2148K, Location: 07-LA-134-R11.52-LA (Lat: 34.141142, Lng: -118.185461), Route carried "under" structure: Ramp State highway 134, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 6,401 (year 2014), Truck Traffic: 2%, Features Intersected: FIGUEROA ST-E134 ON RAMP
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 11.520, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2151L, Location: 07-LA-134-R11.44-LA (Lat: 34.143044, Lng: -118.185889), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,650 (year 2010), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: STATE ROUTE 134 WB
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.0m (98.4ft)
Structure Number: 53 2151L, Location: 07-LA-134-R11.44-LA (Lat: 34.143044, Lng: -118.185889), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,650 (year 2010), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: STATE ROUTE 134 WB
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.0m (98.4ft)
Find on map >> Show street view
Structure Number: 53 2151R, Location: 07-LA-134-R11.44-LA (Lat: 34.142825, Lng: -118.186017), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,650 (year 2010), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: STATE ROUTE 134 EB
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.0m (98.4ft)
Structure Number: 53 2151R, Location: 07-LA-134-R11.44-LA (Lat: 34.142825, Lng: -118.186017), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,650 (year 2010), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: STATE ROUTE 134 EB
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.0m (98.4ft)
Find on map >> Show street view
Structure Number: 53 2151S, Location: 07-LA-134-R11.44-LA (Lat: 34.142731, Lng: -118.186081), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,650 (year 2010), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: E134-FIGUEROA OFF
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.1m (98.8ft)
Structure Number: 53 2151S, Location: 07-LA-134-R11.44-LA (Lat: 34.142731, Lng: -118.186081), Route carried "under" structure: City street , Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 9,650 (year 2010), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: E134-FIGUEROA OFF
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.1m (98.8ft)
Find on map >> Show street view
Structure Number: 53 2182, Location: 07-LA-118-R2.55-LA (Lat: 34.273472, Lng: -118.592469), Route carried "under" structure: City street L554, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 34,243 (year 2020), Truck Traffic: 2%, Features Intersected: DESOTO AVE, BROWNS CYN W, Facility Carried by Structure: STATE ROUTE 118
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 64.0m (210.0ft)
Structure Number: 53 2182, Location: 07-LA-118-R2.55-LA (Lat: 34.273472, Lng: -118.592469), Route carried "under" structure: City street L554, Year Built: 1971, Structure Length: 0. m, Average Daily Traffic: 34,243 (year 2020), Truck Traffic: 2%, Features Intersected: DESOTO AVE, BROWNS CYN W, Facility Carried by Structure: STATE ROUTE 118
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 64.0m (210.0ft)
Find on map >> Show street view
Structure Number: 53 2187, Location: 07-LA-210-R14.15-LA (Lat: 34.234775, Lng: -118.291369), Route carried "under" structure: City street L584, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2017), Truck Traffic: 2%, Features Intersected: LA TUNA CANYON RD UC, Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 2187, Location: 07-LA-210-R14.15-LA (Lat: 34.234775, Lng: -118.291369), Route carried "under" structure: City street L584, Year Built: 1975, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2017), Truck Traffic: 2%, Features Intersected: LA TUNA CANYON RD UC, Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 2211, Location: 07-LA-405-46.83-LA (Lat: 34.265539, Lng: -118.471842), Route carried "under" structure: State highway 118, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 205,000 (year 2019), Truck Traffic: 8%, Features Intersected: SR 118, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 9.810, Lanes on structure: 11, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 2211, Location: 07-LA-405-46.83-LA (Lat: 34.265539, Lng: -118.471842), Route carried "under" structure: State highway 118, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 205,000 (year 2019), Truck Traffic: 8%, Features Intersected: SR 118, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 9.810, Lanes on structure: 11, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 2212F, Location: 07-LA-118-R9.83-LA (Lat: 34.264361, Lng: -118.472733), Route carried "under" structure: Interstate 405, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 254,000 (year 2020), Truck Traffic: 4%, Features Intersected: I 405,SR 118,CHATSWORTH
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 46.820, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 53 2212F, Location: 07-LA-118-R9.83-LA (Lat: 34.264361, Lng: -118.472733), Route carried "under" structure: Interstate 405, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 254,000 (year 2020), Truck Traffic: 4%, Features Intersected: I 405,SR 118,CHATSWORTH
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 46.820, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 53 2212F, Location: 07-LA-118-R9.83-LA (Lat: 34.264361, Lng: -118.472733), Route carried "under" structure: State highway 118, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 155,715 (year 2010), Truck Traffic: 7%, Features Intersected: I 405,SR 118,CHATSWORTH
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 9.830, Lanes on structure: 2, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 53 2212F, Location: 07-LA-118-R9.83-LA (Lat: 34.264361, Lng: -118.472733), Route carried "under" structure: State highway 118, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 155,715 (year 2010), Truck Traffic: 7%, Features Intersected: I 405,SR 118,CHATSWORTH
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 9.830, Lanes on structure: 2, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 53 2213, Location: 07-LA-118-R10.07-LA (Lat: 34.265669, Lng: -118.467625), Route carried "under" structure: City street 6118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 33,000 (year 2020), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: SR 118
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 53 2213, Location: 07-LA-118-R10.07-LA (Lat: 34.265669, Lng: -118.467625), Route carried "under" structure: City street 6118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 33,000 (year 2020), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: SR 118
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 53 2213F, Location: 07-LA-118-R10.08-LA (Lat: 34.266506, Lng: -118.467625), Route carried "under" structure: City street 6118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 37,000 (year 2020), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: W118-S405 CONNECTR
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 53 2213F, Location: 07-LA-118-R10.08-LA (Lat: 34.266506, Lng: -118.467625), Route carried "under" structure: City street 6118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 37,000 (year 2020), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: W118-S405 CONNECTR
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 53 2216G, Location: 07-LA-405-46.80-LA (Lat: 34.261914, Lng: -118.471697), Route carried "under" structure: State highway 118, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 210,000 (year 2019), Truck Traffic: 10%, Features Intersected: I 405, SR 118, CHATSWRTH
Minimum Vertical Clearance: 18.29m (60.01ft), Kilometerpoint: 9.750, Lanes on structure: 4, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Structure Number: 53 2216G, Location: 07-LA-405-46.80-LA (Lat: 34.261914, Lng: -118.471697), Route carried "under" structure: State highway 118, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 210,000 (year 2019), Truck Traffic: 10%, Features Intersected: I 405, SR 118, CHATSWRTH
Minimum Vertical Clearance: 18.29m (60.01ft), Kilometerpoint: 9.750, Lanes on structure: 4, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Find on map >> Show street view
Structure Number: 53 2216G, Location: 07-LA-405-46.80-LA (Lat: 34.261914, Lng: -118.471697), Route carried "under" structure: City street L598, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 3,500 (year 2011), Truck Traffic: 2%, Features Intersected: I 405, SR 118, CHATSWRTH, Facility Carried by Structure: N405-E&W118 CONN
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Structure Number: 53 2216G, Location: 07-LA-405-46.80-LA (Lat: 34.261914, Lng: -118.471697), Route carried "under" structure: City street L598, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 3,500 (year 2011), Truck Traffic: 2%, Features Intersected: I 405, SR 118, CHATSWRTH, Facility Carried by Structure: N405-E&W118 CONN
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Find on map >> Show street view
Structure Number: 53 2217H, Location: 07-LA-118-R9.74-LA (Lat: 34.263147, Lng: -118.472667), Route carried "under" structure: Bypass Interstate 405, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 4,800 (year 2020), Truck Traffic: 2%, Features Intersected: S405-DEVONSHIRE ST OFFRP
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 46.640, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft)
Structure Number: 53 2217H, Location: 07-LA-118-R9.74-LA (Lat: 34.263147, Lng: -118.472667), Route carried "under" structure: Bypass Interstate 405, Year Built: 1977, Structure Length: 0. m, Average Daily Traffic: 4,800 (year 2020), Truck Traffic: 2%, Features Intersected: S405-DEVONSHIRE ST OFFRP
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 46.640, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft)
Find on map >> Show street view
Structure Number: 53 2314, Location: 07-LA-090-R1.72-LA (Lat: 33.985114, Lng: -118.413958), Route carried "under" structure: City street L121, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 17,000 (year 2011), Truck Traffic: 2%, Features Intersected: CENTINELA AVE, Facility Carried by Structure: ROUTE 90
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 2314, Location: 07-LA-090-R1.72-LA (Lat: 33.985114, Lng: -118.413958), Route carried "under" structure: City street L121, Year Built: 1972, Structure Length: 0. m, Average Daily Traffic: 17,000 (year 2011), Truck Traffic: 2%, Features Intersected: CENTINELA AVE, Facility Carried by Structure: ROUTE 90
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 2324L, Location: 07-LA-118-R11.42L-LA (Lat: 34.266853, Lng: -118.443989), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 10%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: STATE ROUTE 118 WB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 39.390, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.7m (117.1ft)
Structure Number: 53 2324L, Location: 07-LA-118-R11.42L-LA (Lat: 34.266853, Lng: -118.443989), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 10%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: STATE ROUTE 118 WB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 39.390, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.7m (117.1ft)
Find on map >> Show street view
Structure Number: 53 2324R, Location: 07-LA-118-R11.42R-LA (Lat: 34.266489, Lng: -118.443678), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 8%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: STATE ROUTE 118 EB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 39.360, Lanes on structure: 3, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 53 2324R, Location: 07-LA-118-R11.42R-LA (Lat: 34.266489, Lng: -118.443678), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 8%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: STATE ROUTE 118 EB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 39.360, Lanes on structure: 3, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 53 2325K, Location: 07-LA-118-R11.42L-LA (Lat: 34.267036, Lng: -118.444169), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 10%, Features Intersected: ROUTE 5, Facility Carried by Structure: LAUREL CYN BL ON R
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 39.410, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.2m (108.9ft)
Structure Number: 53 2325K, Location: 07-LA-118-R11.42L-LA (Lat: 34.267036, Lng: -118.444169), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 10%, Features Intersected: ROUTE 5, Facility Carried by Structure: LAUREL CYN BL ON R
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 39.410, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.2m (108.9ft)
Find on map >> Show street view
Structure Number: 53 2326S, Location: 07-LA-118-R11.43R-LA (Lat: 34.266356, Lng: -118.443469), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 275,825 (year 2010), Truck Traffic: 8%, Features Intersected: ROUTE 5, Facility Carried by Structure: LAUREL CYN BL OFF
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 39.350, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 2326S, Location: 07-LA-118-R11.43R-LA (Lat: 34.266356, Lng: -118.443469), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 275,825 (year 2010), Truck Traffic: 8%, Features Intersected: ROUTE 5, Facility Carried by Structure: LAUREL CYN BL OFF
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 39.350, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 2327F, Location: 07-LA-118-R11.52L-LA (Lat: 34.263847, Lng: -118.441997), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 133,500 (year 2010), Truck Traffic: 4%, Features Intersected: ROUTES 5 & 118,LAUREL CY
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 11.520, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.6m (175.9ft)
Structure Number: 53 2327F, Location: 07-LA-118-R11.52L-LA (Lat: 34.263847, Lng: -118.441997), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 133,500 (year 2010), Truck Traffic: 4%, Features Intersected: ROUTES 5 & 118,LAUREL CY
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 11.520, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.6m (175.9ft)
Find on map >> Show street view
Structure Number: 53 2327F, Location: 07-LA-118-R11.52L-LA (Lat: 34.263847, Lng: -118.441997), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 275,825 (year 2010), Truck Traffic: 8%, Features Intersected: ROUTES 5 & 118,LAUREL CY
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 39.300, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.6m (175.9ft)
Structure Number: 53 2327F, Location: 07-LA-118-R11.52L-LA (Lat: 34.263847, Lng: -118.441997), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 275,825 (year 2010), Truck Traffic: 8%, Features Intersected: ROUTES 5 & 118,LAUREL CY
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 39.300, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.6m (175.9ft)
Find on map >> Show street view
Structure Number: 53 2328G, Location: 07-LA-118-R11.41R-LA (Lat: 34.263831, Lng: -118.442175), Route carried "under" structure: Ramp Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 31,022 (year 2020), Truck Traffic: 3%, Features Intersected: PAXTON ON/OFF RA, CHAN
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 39.200, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 53 2328G, Location: 07-LA-118-R11.41R-LA (Lat: 34.263831, Lng: -118.442175), Route carried "under" structure: Ramp Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 31,022 (year 2020), Truck Traffic: 3%, Features Intersected: PAXTON ON/OFF RA, CHAN
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 39.200, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 53 2328G, Location: 07-LA-118-R11.41R-LA (Lat: 34.263831, Lng: -118.442175), Route carried "under" structure: Ramp Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 28,084 (year 2010), Truck Traffic: 2%, Features Intersected: PAXTON ON/OFF RA, CHAN
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 39.200, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 53 2328G, Location: 07-LA-118-R11.41R-LA (Lat: 34.263831, Lng: -118.442175), Route carried "under" structure: Ramp Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 28,084 (year 2010), Truck Traffic: 2%, Features Intersected: PAXTON ON/OFF RA, CHAN
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 39.200, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 53 2329G, Location: 07-LA-005-39.31-LA (Lat: 34.264764, Lng: -118.441247), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 276,650 (year 2011), Truck Traffic: 8%, Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 39.310, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.4m (208.0ft)
Structure Number: 53 2329G, Location: 07-LA-005-39.31-LA (Lat: 34.264764, Lng: -118.441247), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 276,650 (year 2011), Truck Traffic: 8%, Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 39.310, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.4m (208.0ft)
Find on map >> Show street view
Structure Number: 53 2329G, Location: 07-LA-005-39.31-LA (Lat: 34.264764, Lng: -118.441247), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 133,798 (year 2011), Truck Traffic: 3%, Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 5.86m (19.23ft), Kilometerpoint: 11.420, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.4m (208.0ft)
Structure Number: 53 2329G, Location: 07-LA-005-39.31-LA (Lat: 34.264764, Lng: -118.441247), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 133,798 (year 2011), Truck Traffic: 3%, Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 5.86m (19.23ft), Kilometerpoint: 11.420, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.4m (208.0ft)
Find on map >> Show street view
Structure Number: 53 2329G, Location: 07-LA-005-39.31-LA (Lat: 34.264764, Lng: -118.441247), Route carried "under" structure: Ramp State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 4,527 (year 2011), Truck Traffic: 1%, Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 11.420, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.4m (208.0ft)
Structure Number: 53 2329G, Location: 07-LA-005-39.31-LA (Lat: 34.264764, Lng: -118.441247), Route carried "under" structure: Ramp State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 4,527 (year 2011), Truck Traffic: 1%, Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 11.420, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.4m (208.0ft)
Find on map >> Show street view
Structure Number: 53 2330F, Location: 07-LA-005-39.36-LA (Lat: 34.266311, Lng: -118.442453), Route carried "under" structure: Ramp State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 2,515 (year 2011), Truck Traffic: 1%, Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 11.440, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 2330F, Location: 07-LA-005-39.36-LA (Lat: 34.266311, Lng: -118.442453), Route carried "under" structure: Ramp State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 2,515 (year 2011), Truck Traffic: 1%, Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 11.440, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 2330F, Location: 07-LA-005-39.36-LA (Lat: 34.266311, Lng: -118.442453), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 276,650 (year 2011), Truck Traffic: 8%, Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 39.360, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 2330F, Location: 07-LA-005-39.36-LA (Lat: 34.266311, Lng: -118.442453), Route carried "under" structure: Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 276,650 (year 2011), Truck Traffic: 8%, Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 39.360, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 2330F, Location: 07-LA-005-39.36-LA (Lat: 34.266311, Lng: -118.442453), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 133,798 (year 2011), Truck Traffic: 3%, Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 11.440, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 2330F, Location: 07-LA-005-39.36-LA (Lat: 34.266311, Lng: -118.442453), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 133,798 (year 2011), Truck Traffic: 3%, Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 11.440, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 2345F, Location: 07-LA-118-R11.56L-LA (Lat: 34.267750, Lng: -118.441967), Route carried "under" structure: City street L408, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 14,504 (year 2010), Truck Traffic: 2%, Features Intersected: LAUREL CANYON BLVD, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.0m (183.7ft)
Structure Number: 53 2345F, Location: 07-LA-118-R11.56L-LA (Lat: 34.267750, Lng: -118.441967), Route carried "under" structure: City street L408, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 14,504 (year 2010), Truck Traffic: 2%, Features Intersected: LAUREL CANYON BLVD, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.0m (183.7ft)
Find on map >> Show street view
Structure Number: 53 2350G, Location: 07-LA-005-39.15-LA (Lat: 34.264533, Lng: -118.440789), Route carried "under" structure: Bypass Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 4,440 (year 2012), Truck Traffic: 2%, Features Intersected: N5-PAXTON & PAXTON-N5
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 39.150, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.2m (164.7ft)
Structure Number: 53 2350G, Location: 07-LA-005-39.15-LA (Lat: 34.264533, Lng: -118.440789), Route carried "under" structure: Bypass Interstate 5, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 4,440 (year 2012), Truck Traffic: 2%, Features Intersected: N5-PAXTON & PAXTON-N5
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 39.150, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.2m (164.7ft)
Find on map >> Show street view
Structure Number: 53 2357, Location: 07-LA-118-R11.05L-LA (Lat: 34.265600, Lng: -118.450014), Route carried "under" structure: City street L402, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 8,008 (year 2020), Truck Traffic: 2%, Features Intersected: ARLETA AVE, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.000, Lanes on structure: 13, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.0m (164.0ft)
Structure Number: 53 2357, Location: 07-LA-118-R11.05L-LA (Lat: 34.265600, Lng: -118.450014), Route carried "under" structure: City street L402, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 8,008 (year 2020), Truck Traffic: 2%, Features Intersected: ARLETA AVE, Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.000, Lanes on structure: 13, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.0m (164.0ft)
Find on map >> Show street view
Structure Number: 53 2395, Location: 07-LA-118-R7.80-LA (Lat: 34.278378, Lng: -118.502347), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: BALBOA BLVD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 7.800, Lanes on structure: 8, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.6m (146.3ft)
Structure Number: 53 2395, Location: 07-LA-118-R7.80-LA (Lat: 34.278378, Lng: -118.502347), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: BALBOA BLVD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 7.800, Lanes on structure: 8, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.6m (146.3ft)
Find on map >> Show street view
Structure Number: 53 2396, Location: 07-LA-118-R8.05-LA (Lat: 34.277892, Lng: -118.497922), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: STATE ROUTE 118, Facility Carried by Structure: RUFFNER AVE
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 8.050, Lanes on structure: 2, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 52.1m (170.9ft)
Structure Number: 53 2396, Location: 07-LA-118-R8.05-LA (Lat: 34.277892, Lng: -118.497922), Route carried "under" structure: State highway 118, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: STATE ROUTE 118, Facility Carried by Structure: RUFFNER AVE
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 8.050, Lanes on structure: 2, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 52.1m (170.9ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street L100, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2006), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street L100, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2006), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 16,350 (year 2015), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 16,350 (year 2015), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 61,500 (year 2009), Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 7.49m (24.57ft), Kilometerpoint: 24.940, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 61,500 (year 2009), Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 7.49m (24.57ft), Kilometerpoint: 24.940, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 8,110 (year 2015), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 8,110 (year 2015), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400L, Location: 07-LA-105-R0.39-LA (Lat: 33.931533, Lng: -118.398897), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street L100, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2006), Truck Traffic: 3%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street L100, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2006), Truck Traffic: 3%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 8,110 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 8,110 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2009), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: Ramp City street L100, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2006), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: Ramp City street L100, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2006), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 61,500 (year 2009), Truck Traffic: 3%, Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.940, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2400R, Location: 07-LA-105-R0.39-LA (Lat: 33.931203, Lng: -118.398167), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 61,500 (year 2009), Truck Traffic: 3%, Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.940, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2401R, Location: 07-LA-105-R7.56-LA (Lat: 33.928392, Lng: -118.278506), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 1%, Features Intersected: BROADWAY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 53 2401R, Location: 07-LA-105-R7.56-LA (Lat: 33.928392, Lng: -118.278506), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 1%, Features Intersected: BROADWAY, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 53 2402, Location: 07-LA-110-13.85-LA (Lat: 33.929489, Lng: -118.282472), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2020), Truck Traffic: 2%, Features Intersected: S110-W105 CONNECTOR RAMP, Facility Carried by Structure: FIGUEROA ST
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 13.850, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.2m (128.6ft)
Structure Number: 53 2402, Location: 07-LA-110-13.85-LA (Lat: 33.929489, Lng: -118.282472), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2020), Truck Traffic: 2%, Features Intersected: S110-W105 CONNECTOR RAMP, Facility Carried by Structure: FIGUEROA ST
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 13.850, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.2m (128.6ft)
Find on map >> Show street view
Structure Number: 53 2403G, Location: 07-LA-105-R7.20-LA (Lat: 33.928039, Lng: -118.284036), Route carried "under" structure: City street L042, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2006), Truck Traffic: 1%, Features Intersected: UP RR,117TH ST, FIGUEROA, Facility Carried by Structure: E105-S110 CONN
Minimum Vertical Clearance: 9.09m (29.82ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 53 2403G, Location: 07-LA-105-R7.20-LA (Lat: 33.928039, Lng: -118.284036), Route carried "under" structure: City street L042, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2006), Truck Traffic: 1%, Features Intersected: UP RR,117TH ST, FIGUEROA, Facility Carried by Structure: E105-S110 CONN
Minimum Vertical Clearance: 9.09m (29.82ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 53 2403G, Location: 07-LA-105-R7.20-LA (Lat: 33.928039, Lng: -118.284036), Route carried "under" structure: City street Q713, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 1%, Features Intersected: UP RR,117TH ST, FIGUEROA, Facility Carried by Structure: E105-S110 CONN
Minimum Vertical Clearance: 9.09m (29.82ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 53 2403G, Location: 07-LA-105-R7.20-LA (Lat: 33.928039, Lng: -118.284036), Route carried "under" structure: City street Q713, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 1%, Features Intersected: UP RR,117TH ST, FIGUEROA, Facility Carried by Structure: E105-S110 CONN
Minimum Vertical Clearance: 9.09m (29.82ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Ramp State highway 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 5.90m (19.36ft), Kilometerpoint: 7.390, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Ramp State highway 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 5.90m (19.36ft), Kilometerpoint: 7.390, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 6.55m (21.49ft), Kilometerpoint: 7.390, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 6.55m (21.49ft), Kilometerpoint: 7.390, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 115,000 (year 2006), Truck Traffic: 6%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 5.80m (19.03ft), Kilometerpoint: 7.390, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 115,000 (year 2006), Truck Traffic: 6%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 5.80m (19.03ft), Kilometerpoint: 7.390, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Bypass City street L042, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT, Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 12.20m (40.03ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Bypass City street L042, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT, Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 12.20m (40.03ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: City street L138, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT, Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: City street L138, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT, Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: City street Q720, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,300 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT, Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 7.60m (24.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: City street Q720, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 1,300 (year 2006), Truck Traffic: 1%, Features Intersected: ROUTE 105, 110, LRT, Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 7.60m (24.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Ramp Interstate 110, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2006), Truck Traffic: 2%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 7.60m (24.93ft), Kilometerpoint: 13.950, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Ramp Interstate 110, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2006), Truck Traffic: 2%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 7.60m (24.93ft), Kilometerpoint: 13.950, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 21,000 (year 2006), Truck Traffic: 8%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Structure Number: 53 2404G, Location: 07-LA-105-R7.02-LA (Lat: 33.928261, Lng: -118.287156), Route carried "under" structure: Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 21,000 (year 2006), Truck Traffic: 8%, Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.4m (214.6ft)
Find on map >> Show street view
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 291,000 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.31m (23.98ft), Kilometerpoint: 13.850, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.31m (23.98ft), Kilometerpoint: 13.850, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 92,750 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.950, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 92,750 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.950, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.700, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.700, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: City street L042, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,500 (year 2006), Truck Traffic: 1%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: City street L042, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 5,500 (year 2006), Truck Traffic: 1%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: City street L139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 8,800 (year 2006), Truck Traffic: 1%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2405L, Location: 07-LA-105-R7.26-LA (Lat: 33.928817, Lng: -118.282944), Route carried "under" structure: City street L139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 8,800 (year 2006), Truck Traffic: 1%, Features Intersected: I 110,BROADWAY,FIGUEROA, Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2405R, Location: 07-LA-105-R7.26-LA (Lat: 33.928361, Lng: -118.282911), Route carried "under" structure: Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 247,000 (year 2006), Truck Traffic: 6%, Features Intersected: I 110,S110-E105,FIGUEROA, Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 53 2405R, Location: 07-LA-105-R7.26-LA (Lat: 33.928361, Lng: -118.282911), Route carried "under" structure: Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 247,000 (year 2006), Truck Traffic: 6%, Features Intersected: I 110,S110-E105,FIGUEROA, Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 53 2405R, Location: 07-LA-105-R7.26-LA (Lat: 33.928361, Lng: -118.282911), Route carried "under" structure: Bypass Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,S110-E105,FIGUEROA, Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 53 2405R, Location: 07-LA-105-R7.26-LA (Lat: 33.928361, Lng: -118.282911), Route carried "under" structure: Bypass Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,S110-E105,FIGUEROA, Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)