Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,325Number of bridges
  • 39,718ft / 12,106mTotal length
  • $98,718,000Total costs
  • 180,570,830Total average daily traffic
  • 9,950,919Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Los Angeles
  • No street view available for this location

New bridges in Los Angeles, CA - historical statistics
  • New bridges - historical statistics
  • 121900-1909
  • 41910-1919
  • 431920-1929
  • 721930-1939
  • 1701940-1949
  • 5201950-1959
  • 6961960-1969
  • 3091970-1979
  • 1881980-1989
  • 2231990-1999
  • 512000-2009
  • 372010-2019
Reconstructed bridges in Los Angeles, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 31930-1939
  • 51940-1949
  • 181950-1959
  • 501960-1969
  • 341970-1979
  • 461980-1989
  • 421990-1999
  • 702000-2009
  • 132010-2019
Average Bridge Truck Traffic in Los Angeles, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 81.7%Good
  • 1.1%Satisfactory
  • 15.5%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 0.5%Very good
  • 89.2%Good
  • 1.1%Satisfactory
  • 9.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 94.1%Good
  • 2.3%Satisfactory
  • 3.4%Fair
  • 0.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.2%Excellent
  • 77.2%Very good
  • 2.7%Good
  • 2.2%Satisfactory
  • 1.7%Fair
  • 0.5%Poor
  • 0.2%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 76.5%Good
  • 23.5%Satisfactory
Find on map >>   Show street view

Structure Number: 53 2017L,  Location: 07-LA-210-R0.84-LA (Lat: 34.322953,  Lng: -118.479436),  Route carried "under" structure: City street L893,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2016),  Truck Traffic: 2%,  Features Intersected: YARNELL STREET,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 53 2017R,  Location: 07-LA-210-R0.84-LA (Lat: 34.322744,  Lng: -118.479386),  Route carried "under" structure: City street L893,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2016),  Truck Traffic: 2%,  Features Intersected: YARNELL STREET,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 53 2018,  Location: 07-LA-002-R17.52-LA (Lat: 34.128228,  Lng: -118.229133),  Route carried "under" structure: State highway 2,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 143,000 (year 2011),  Truck Traffic: 8%,  Features Intersected: STATE ROUTE 2,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 17.520,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 53 2031L,  Location: 07-LA-047-R0.17-LA (Lat: 33.748856,  Lng: -118.288097),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 17,200 (year 2020),  Truck Traffic: 2%,  Features Intersected: PACIFIC AVE,  Facility Carried by Structure: STATE ROUTE 47 WB
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 53 2031R,  Location: 07-LA-047-R0.17-LA (Lat: 33.748422,  Lng: -118.288097),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 17,200 (year 2020),  Truck Traffic: 2%,  Features Intersected: PACIFIC AVE,  Facility Carried by Structure: STATE ROUTE 47 EB
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 53 2046,  Location: 07-LA-110-R0.75-LA (Lat: 33.746486,  Lng: -118.292544),  Route carried "under" structure: State highway 110,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 44,250 (year 2009),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 110,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.750,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 53 2058,  Location: 07-LA-118-R1.47 (Lat: 34.277739,  Lng: -118.610572),  Route carried "under" structure: State highway 118,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 155,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: SR 118,  Facility Carried by Structure: MOVIE LANE
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 1.470,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 53 2062K,  Location: 07-LA-010-19.20-LA (Lat: 34.055539,  Lng: -118.200856),  Route carried "under" structure: Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2005),  Truck Traffic: 1%,  Features Intersected: METROLINK & I 10 BUSWAY
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 19.240,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 2063K,  Location: 07-LA-010-19.25-LA (Lat: 34.056025,  Lng: -118.200928),  Route carried "under" structure: Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2005),  Truck Traffic: 1%,  Features Intersected: METROLINK & I-10 BUSWAY
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 19.280,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 2095,  Location: 07-LA-118-R12.40-LA (Lat: 34.272114,  Lng: -118.428886),  Route carried "under" structure: City street L352,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2010),  Truck Traffic: 2%,  Features Intersected: SAN FERNANDO RD,  Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.9m (127.6ft)

Find on map >>   Show street view

Structure Number: 53 2102G,  Location: 07-LA-118-R13.94-LA (Lat: 34.285753,  Lng: -118.410428),  Route carried "under" structure: Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 121,363 (year 2010),  Truck Traffic: 6%,  Features Intersected: ROUTE 210, PAXTON RA
Minimum Vertical Clearance: 9.75m (31.99ft),  Kilometerpoint: 5.910,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 53 2103G,  Location: 07-LA-118-R13.89-LA (Lat: 34.286431,  Lng: -118.409297),  Route carried "under" structure: City street 6210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 19,441 (year 2010),  Truck Traffic: 2%,  Features Intersected: PAXTON ST & FOOTHILL BL,  Facility Carried by Structure: E118-E210 CONN
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 53 2103G,  Location: 07-LA-118-R13.89-LA (Lat: 34.286431,  Lng: -118.409297),  Route carried "under" structure: City street L608,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 10,479 (year 2012),  Truck Traffic: 2%,  Features Intersected: PAXTON ST & FOOTHILL BL,  Facility Carried by Structure: E118-E210 CONN
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 53 2104F,  Location: 07-LA-210-R6.08-LA (Lat: 34.286950,  Lng: -118.408947),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2015),  Truck Traffic: 8%,  Features Intersected: ROUTE 210, PAXTON, FOOTH
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 6.080,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 53 2104F,  Location: 07-LA-210-R6.08-LA (Lat: 34.286950,  Lng: -118.408947),  Route carried "under" structure: Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 108,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: ROUTE 210, PAXTON, FOOTH
Minimum Vertical Clearance: 6.75m (22.15ft),  Kilometerpoint: 6.080,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 53 212,  Location: 07-LA-118-R13.68-LA (Lat: 34.284897,  Lng: -118.412208),  Route carried "under" structure: City street L603,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,350 (year 2010),  Truck Traffic: 2%,  Features Intersected: DRONFIELD AVENUE,  Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.8m (127.3ft)

Find on map >>   Show street view

Structure Number: 53 2137K,  Location: 07-LA-134-R11.60-LA (Lat: 34.141761,  Lng: -118.183789),  Route carried "under" structure: State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 214,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 134
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 11.600,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 53 214,  Location: 07-LA-134-R11.68-LA (Lat: 34.142181,  Lng: -118.182256),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 11,801 (year 2014),  Truck Traffic: 3%,  Features Intersected: ST RTE 134 & OFF-RAMP,  Facility Carried by Structure: PATRICIAN WAY
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 11.680,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.1m (154.5ft)

Find on map >>   Show street view

Structure Number: 53 214,  Location: 07-LA-134-R11.68-LA (Lat: 34.142181,  Lng: -118.182256),  Route carried "under" structure: State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 214,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: ST RTE 134 & OFF-RAMP,  Facility Carried by Structure: PATRICIAN WAY
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 11.690,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.1m (154.5ft)

Find on map >>   Show street view

Structure Number: 53 2148K,  Location: 07-LA-134-R11.52-LA (Lat: 34.141142,  Lng: -118.185461),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 6,401 (year 2014),  Truck Traffic: 2%,  Features Intersected: FIGUEROA ST-E134 ON RAMP
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 11.520,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2151L,  Location: 07-LA-134-R11.44-LA (Lat: 34.143044,  Lng: -118.185889),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,650 (year 2010),  Truck Traffic: 2%,  Features Intersected: FIGUEROA STREET,  Facility Carried by Structure: STATE ROUTE 134 WB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.0m (98.4ft)

Find on map >>   Show street view

Structure Number: 53 2151R,  Location: 07-LA-134-R11.44-LA (Lat: 34.142825,  Lng: -118.186017),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,650 (year 2010),  Truck Traffic: 2%,  Features Intersected: FIGUEROA STREET,  Facility Carried by Structure: STATE ROUTE 134 EB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.0m (98.4ft)

Find on map >>   Show street view

Structure Number: 53 2151S,  Location: 07-LA-134-R11.44-LA (Lat: 34.142731,  Lng: -118.186081),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,650 (year 2010),  Truck Traffic: 2%,  Features Intersected: FIGUEROA STREET,  Facility Carried by Structure: E134-FIGUEROA OFF
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 53 2182,  Location: 07-LA-118-R2.55-LA (Lat: 34.273472,  Lng: -118.592469),  Route carried "under" structure: City street L554,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 34,243 (year 2020),  Truck Traffic: 2%,  Features Intersected: DESOTO AVE, BROWNS CYN W,  Facility Carried by Structure: STATE ROUTE 118
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 64.0m (210.0ft)

Find on map >>   Show street view

Structure Number: 53 2187,  Location: 07-LA-210-R14.15-LA (Lat: 34.234775,  Lng: -118.291369),  Route carried "under" structure: City street L584,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2017),  Truck Traffic: 2%,  Features Intersected: LA TUNA CANYON RD UC,  Facility Carried by Structure: INTERSTATE 210
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 2211,  Location: 07-LA-405-46.83-LA (Lat: 34.265539,  Lng: -118.471842),  Route carried "under" structure: State highway 118,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 205,000 (year 2019),  Truck Traffic: 8%,  Features Intersected: SR 118,  Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 9.810,  Lanes on structure: 11,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 2212F,  Location: 07-LA-118-R9.83-LA (Lat: 34.264361,  Lng: -118.472733),  Route carried "under" structure: Interstate 405,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 254,000 (year 2020),  Truck Traffic: 4%,  Features Intersected: I 405,SR 118,CHATSWORTH
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 46.820,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 53 2212F,  Location: 07-LA-118-R9.83-LA (Lat: 34.264361,  Lng: -118.472733),  Route carried "under" structure: State highway 118,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 155,715 (year 2010),  Truck Traffic: 7%,  Features Intersected: I 405,SR 118,CHATSWORTH
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 9.830,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 53 2213,  Location: 07-LA-118-R10.07-LA (Lat: 34.265669,  Lng: -118.467625),  Route carried "under" structure: City street 6118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 33,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: SEPULVEDA BLVD,  Facility Carried by Structure: SR 118
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 53 2213F,  Location: 07-LA-118-R10.08-LA (Lat: 34.266506,  Lng: -118.467625),  Route carried "under" structure: City street 6118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 37,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: SEPULVEDA BLVD,  Facility Carried by Structure: W118-S405 CONNECTR
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 53 2216G,  Location: 07-LA-405-46.80-LA (Lat: 34.261914,  Lng: -118.471697),  Route carried "under" structure: State highway 118,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 210,000 (year 2019),  Truck Traffic: 10%,  Features Intersected: I 405, SR 118, CHATSWRTH
Minimum Vertical Clearance: 18.29m (60.01ft),  Kilometerpoint: 9.750,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 53 2216G,  Location: 07-LA-405-46.80-LA (Lat: 34.261914,  Lng: -118.471697),  Route carried "under" structure: City street L598,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2011),  Truck Traffic: 2%,  Features Intersected: I 405, SR 118, CHATSWRTH,  Facility Carried by Structure: N405-E&W118 CONN
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 53 2217H,  Location: 07-LA-118-R9.74-LA (Lat: 34.263147,  Lng: -118.472667),  Route carried "under" structure: Bypass Interstate 405,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 2020),  Truck Traffic: 2%,  Features Intersected: S405-DEVONSHIRE ST OFFRP
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 46.640,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 53 2314,  Location: 07-LA-090-R1.72-LA (Lat: 33.985114,  Lng: -118.413958),  Route carried "under" structure: City street L121,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: CENTINELA AVE,  Facility Carried by Structure: ROUTE 90
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 2324L,  Location: 07-LA-118-R11.42L-LA (Lat: 34.266853,  Lng: -118.443989),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 291,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: STATE ROUTE 118 WB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 39.390,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 53 2324R,  Location: 07-LA-118-R11.42R-LA (Lat: 34.266489,  Lng: -118.443678),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 291,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: STATE ROUTE 118 EB
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 39.360,  Lanes on structure: 3,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 53 2325K,  Location: 07-LA-118-R11.42L-LA (Lat: 34.267036,  Lng: -118.444169),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 291,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: ROUTE 5,  Facility Carried by Structure: LAUREL CYN BL ON R
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 39.410,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 53 2326S,  Location: 07-LA-118-R11.43R-LA (Lat: 34.266356,  Lng: -118.443469),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 275,825 (year 2010),  Truck Traffic: 8%,  Features Intersected: ROUTE 5,  Facility Carried by Structure: LAUREL CYN BL OFF
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 39.350,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 2327F,  Location: 07-LA-118-R11.52L-LA (Lat: 34.263847,  Lng: -118.441997),  Route carried "under" structure: State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 133,500 (year 2010),  Truck Traffic: 4%,  Features Intersected: ROUTES 5 & 118,LAUREL CY
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 11.520,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 53 2327F,  Location: 07-LA-118-R11.52L-LA (Lat: 34.263847,  Lng: -118.441997),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 275,825 (year 2010),  Truck Traffic: 8%,  Features Intersected: ROUTES 5 & 118,LAUREL CY
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 39.300,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 53 2328G,  Location: 07-LA-118-R11.41R-LA (Lat: 34.263831,  Lng: -118.442175),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 31,022 (year 2020),  Truck Traffic: 3%,  Features Intersected: PAXTON ON/OFF RA, CHAN
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 39.200,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 53 2328G,  Location: 07-LA-118-R11.41R-LA (Lat: 34.263831,  Lng: -118.442175),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 28,084 (year 2010),  Truck Traffic: 2%,  Features Intersected: PAXTON ON/OFF RA, CHAN
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 39.200,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 53 2329G,  Location: 07-LA-005-39.31-LA (Lat: 34.264764,  Lng: -118.441247),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 276,650 (year 2011),  Truck Traffic: 8%,  Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 39.310,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 63.4m (208.0ft)

Find on map >>   Show street view

Structure Number: 53 2329G,  Location: 07-LA-005-39.31-LA (Lat: 34.264764,  Lng: -118.441247),  Route carried "under" structure: State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 133,798 (year 2011),  Truck Traffic: 3%,  Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 5.86m (19.23ft),  Kilometerpoint: 11.420,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 63.4m (208.0ft)

Find on map >>   Show street view

Structure Number: 53 2329G,  Location: 07-LA-005-39.31-LA (Lat: 34.264764,  Lng: -118.441247),  Route carried "under" structure: Ramp State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 4,527 (year 2011),  Truck Traffic: 1%,  Features Intersected: I 5 & SR 118,CONNS,WASH
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 11.420,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 63.4m (208.0ft)

Find on map >>   Show street view

Structure Number: 53 2330F,  Location: 07-LA-005-39.36-LA (Lat: 34.266311,  Lng: -118.442453),  Route carried "under" structure: Ramp State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 2,515 (year 2011),  Truck Traffic: 1%,  Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 11.440,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 53 2330F,  Location: 07-LA-005-39.36-LA (Lat: 34.266311,  Lng: -118.442453),  Route carried "under" structure: Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 276,650 (year 2011),  Truck Traffic: 8%,  Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 39.360,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 53 2330F,  Location: 07-LA-005-39.36-LA (Lat: 34.266311,  Lng: -118.442453),  Route carried "under" structure: State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 133,798 (year 2011),  Truck Traffic: 3%,  Features Intersected: ROUTES 5 & 118, & CONNS
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 11.440,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 53 2345F,  Location: 07-LA-118-R11.56L-LA (Lat: 34.267750,  Lng: -118.441967),  Route carried "under" structure: City street L408,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 14,504 (year 2010),  Truck Traffic: 2%,  Features Intersected: LAUREL CANYON BLVD,  Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 56.0m (183.7ft)

Find on map >>   Show street view

Structure Number: 53 2350G,  Location: 07-LA-005-39.15-LA (Lat: 34.264533,  Lng: -118.440789),  Route carried "under" structure: Bypass Interstate 5,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 4,440 (year 2012),  Truck Traffic: 2%,  Features Intersected: N5-PAXTON & PAXTON-N5
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 39.150,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.2m (164.7ft)

Find on map >>   Show street view

Structure Number: 53 2357,  Location: 07-LA-118-R11.05L-LA (Lat: 34.265600,  Lng: -118.450014),  Route carried "under" structure: City street L402,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 8,008 (year 2020),  Truck Traffic: 2%,  Features Intersected: ARLETA AVE,  Facility Carried by Structure: ROUTE 118
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 13,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 53 2395,  Location: 07-LA-118-R7.80-LA (Lat: 34.278378,  Lng: -118.502347),  Route carried "under" structure: State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 222,000 (year 2020),  Features Intersected: ROUTE 118,  Facility Carried by Structure: BALBOA BLVD
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 7.800,  Lanes on structure: 8,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.6m (146.3ft)

Find on map >>   Show street view

Structure Number: 53 2396,  Location: 07-LA-118-R8.05-LA (Lat: 34.277892,  Lng: -118.497922),  Route carried "under" structure: State highway 118,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 222,000 (year 2020),  Features Intersected: STATE ROUTE 118,  Facility Carried by Structure: RUFFNER AVE
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 8.050,  Lanes on structure: 2,  Lanes under structure: 14,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street L100,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 16,350 (year 2015),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: State highway 1,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 61,500 (year 2009),  Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 7.49m (24.57ft),  Kilometerpoint: 24.940,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 8,110 (year 2015),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400L,  Location: 07-LA-105-R0.39-LA (Lat: 33.931533,  Lng: -118.398897),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street L100,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2006),  Truck Traffic: 3%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 8,110 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.61m (24.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: Ramp City street L100,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: IMPERIAL HWY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2400R,  Location: 07-LA-105-R0.39-LA (Lat: 33.931203,  Lng: -118.398167),  Route carried "under" structure: State highway 1,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 61,500 (year 2009),  Truck Traffic: 3%,  Features Intersected: IMPERIAL HWY
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 24.940,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 2401R,  Location: 07-LA-105-R7.56-LA (Lat: 33.928392,  Lng: -118.278506),  Route carried "under" structure: City street L139,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: BROADWAY,  Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 53 2402,  Location: 07-LA-110-13.85-LA (Lat: 33.929489,  Lng: -118.282472),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: S110-W105 CONNECTOR RAMP,  Facility Carried by Structure: FIGUEROA ST
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 13.850,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.2m (128.6ft)

Find on map >>   Show street view

Structure Number: 53 2403G,  Location: 07-LA-105-R7.20-LA (Lat: 33.928039,  Lng: -118.284036),  Route carried "under" structure: City street L042,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: UP RR,117TH ST, FIGUEROA,  Facility Carried by Structure: E105-S110 CONN
Minimum Vertical Clearance: 9.09m (29.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 53 2403G,  Location: 07-LA-105-R7.20-LA (Lat: 33.928039,  Lng: -118.284036),  Route carried "under" structure: City street Q713,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: UP RR,117TH ST, FIGUEROA,  Facility Carried by Structure: E105-S110 CONN
Minimum Vertical Clearance: 9.09m (29.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: Ramp State highway 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 5.90m (19.36ft),  Kilometerpoint: 7.390,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: Ramp Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 7.390,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 115,000 (year 2006),  Truck Traffic: 6%,  Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 5.80m (19.03ft),  Kilometerpoint: 7.390,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: Bypass City street L042,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, 110, LRT,  Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 12.20m (40.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: City street L138,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, 110, LRT,  Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: City street Q720,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,300 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, 110, LRT,  Facility Carried by Structure: E105-N110 CONN
Minimum Vertical Clearance: 7.60m (24.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2006),  Truck Traffic: 2%,  Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 7.60m (24.93ft),  Kilometerpoint: 13.950,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2404G,  Location: 07-LA-105-R7.02-LA (Lat: 33.928261,  Lng: -118.287156),  Route carried "under" structure: Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 2006),  Truck Traffic: 8%,  Features Intersected: ROUTE 105, 110, LRT
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 7.260,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 65.4m (214.6ft)

Find on map >>   Show street view

Structure Number: 53 2405L,  Location: 07-LA-105-R7.26-LA (Lat: 33.928817,  Lng: -118.282944),  Route carried "under" structure: Interstate 110,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 291,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: I 110,BROADWAY,FIGUEROA,  Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 13.820,  Lanes on structure: 5,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 53 2405L,  Location: 07-LA-105-R7.26-LA (Lat: 33.928817,  Lng: -118.282944),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 93,700 (year 2006),  Truck Traffic: 2%,  Features Intersected: I 110,BROADWAY,FIGUEROA,  Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.31m (23.98ft),  Kilometerpoint: 13.850,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 53 2405L,  Location: 07-LA-105-R7.26-LA (Lat: 33.928817,  Lng: -118.282944),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 92,750 (year 2006),  Truck Traffic: 2%,  Features Intersected: I 110,BROADWAY,FIGUEROA,  Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 13.950,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 53 2405L,  Location: 07-LA-105-R7.26-LA (Lat: 33.928817,  Lng: -118.282944),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 93,700 (year 2006),  Truck Traffic: 2%,  Features Intersected: I 110,BROADWAY,FIGUEROA,  Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 13.700,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 53 2405L,  Location: 07-LA-105-R7.26-LA (Lat: 33.928817,  Lng: -118.282944),  Route carried "under" structure: City street L042,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2006),  Truck Traffic: 1%,  Features Intersected: I 110,BROADWAY,FIGUEROA,  Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 53 2405L,  Location: 07-LA-105-R7.26-LA (Lat: 33.928817,  Lng: -118.282944),  Route carried "under" structure: City street L139,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 8,800 (year 2006),  Truck Traffic: 1%,  Features Intersected: I 110,BROADWAY,FIGUEROA,  Facility Carried by Structure: W105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 53 2405R,  Location: 07-LA-105-R7.26-LA (Lat: 33.928361,  Lng: -118.282911),  Route carried "under" structure: Interstate 110,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 247,000 (year 2006),  Truck Traffic: 6%,  Features Intersected: I 110,S110-E105,FIGUEROA,  Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 13.820,  Lanes on structure: 5,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 53 2405R,  Location: 07-LA-105-R7.26-LA (Lat: 33.928361,  Lng: -118.282911),  Route carried "under" structure: Bypass Interstate 110,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 93,700 (year 2006),  Truck Traffic: 2%,  Features Intersected: I 110,S110-E105,FIGUEROA,  Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 13.820,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.0m (187.0ft)

Discuss Los Angeles, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.