Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lima, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 91Number of bridges
  • 1,214ft / 370mTotal length
  • $1,422,000Total costs
  • 956,591Total average daily traffic
  • 229,604Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lima
  • No street view available for this location

New bridges in Lima, OH - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 21950-1959
  • 211960-1969
  • 151970-1979
  • 31980-1989
  • 71990-1999
  • 82000-2009
  • 322010-2019
Reconstructed bridges in Lima, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 21980-1989
  • 01990-1999
  • 02000-2009
  • 02010-2019
  • 22020-2022
Average Bridge Daily Traffic in Lima, OH
Average Bridge Truck Traffic in Lima, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 29.2%Excellent
  • 12.5%Very good
  • 40.3%Good
  • 13.9%Satisfactory
  • 1.4%Fair
  • 1.4%Poor
  • 1.4%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.6%Excellent
  • 19.4%Very good
  • 30.6%Good
  • 12.5%Satisfactory
  • 5.6%Fair
  • 1.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Excellent
  • 25.0%Very good
  • 38.9%Good
  • 12.5%Satisfactory
  • 1.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.8%Excellent
  • 45.1%Very good
  • 23.5%Good
  • 17.6%Satisfactory
  • 3.9%Fair
  • 2.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 201723,  Location: 1.16 Mi N of Breese Rd (Lat: 40.698411,  Lng: -84.108231),  Route carried "under" structure: Interstate 75,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 36,366 (year 2016),  Truck Traffic: 35%,  Features Intersected: TWP RD 13 MCCLAIN RD,  Facility Carried by Structure: TR 13 McCLAIN RD
Minimum Vertical Clearance: 6.46m (21.19ft),  Kilometerpoint: 5.279,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 201812,  Location: 2.11 Mi N of Breese Rd (Lat: 40.699081,  Lng: -84.090250),  Route carried "under" structure: State highway 65,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 4,582 (year 2015),  Truck Traffic: 10%,  Features Intersected: IR-75,  Facility Carried by Structure: IR 75 SB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 6.116,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 20182,  Location: 2.11 Mi N of Breese Rd. (Lat: 40.698831,  Lng: -84.090261),  Route carried "under" structure: State highway 65,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 4,582 (year 2015),  Truck Traffic: 10%,  Features Intersected: IR-75,  Facility Carried by Structure: IR 75 NB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 6.116,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 201936,  Location: .85 Mi N of Sr 65 (Lat: 40.702250,  Lng: -84.075719),  Route carried "under" structure: Interstate 75,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 36,343 (year 2016),  Truck Traffic: 34%,  Features Intersected: CR 196 HANTHORN RD,  Facility Carried by Structure: CR 196 HANTHORN RD
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 8.175,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 20196,  Location: ONE MILE SOUTH OF SR 309 (Lat: 40.717069,  Lng: -84.075569),  Route carried "under" structure: Interstate 75,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 36,343 (year 2016),  Truck Traffic: 34%,  Features Intersected: TR 192 E 4TH ST,  Facility Carried by Structure: TR 192 E 4TH ST
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 9.762,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 202037,  Location: .92 MI N OF 4TH STREET (Lat: 40.730450,  Lng: -84.075669),  Route carried "under" structure: State highway 117,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 21,540 (year 2015),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 75,  Facility Carried by Structure: IR 75 SB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 29.773,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 202053,  Location: .92 MI N OF 4TH STREET (Lat: 40.730461,  Lng: -84.075350),  Route carried "under" structure: State highway 117,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 21,540 (year 2015),  Truck Traffic: 6%,  Features Intersected: INTERSTATE-75,  Facility Carried by Structure: IR 75 NB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 29.773,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 202177,  Location: 1MILE NORTH 0F SR. 309 (Lat: 40.742369,  Lng: -84.075839),  Route carried "under" structure: Interstate 75,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 38,482 (year 2016),  Truck Traffic: 34%,  Features Intersected: CR190 RESERVOIR RD,  Facility Carried by Structure: CR190 RESERVOIR RD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 12.572,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 202266,  Location: 0.43 Mile N. Ottawa River (Lat: 40.755711,  Lng: -84.075739),  Route carried "under" structure: State highway 81,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 13,666 (year 2015),  Truck Traffic: 10%,  Features Intersected: IR 75,  Facility Carried by Structure: IR 75 SB
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 30.368,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 202274,  Location: 0.43 mile N. Ottawa River (Lat: 40.755761,  Lng: -84.075439),  Route carried "under" structure: State highway 81,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 13,666 (year 2015),  Truck Traffic: 10%,  Features Intersected: IR-75,  Facility Carried by Structure: IR 75 NB
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 30.368,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 202282,  Location: 1.1 mi. North of SR81 (Lat: 40.770400,  Lng: -84.070561),  Route carried "under" structure: Interstate 75,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 33,459 (year 2016),  Truck Traffic: 38%,  Features Intersected: CR 162 STEWART RD,  Facility Carried by Structure: CR 162 STEWART RD
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 15.933,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 202312,  Location: 1.5 mi. North of SR 81 (Lat: 40.774539,  Lng: -84.066039),  Route carried "under" structure: Interstate 75,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 33,459 (year 2016),  Truck Traffic: 38%,  Features Intersected: CR 110 BIBLE RD,  Facility Carried by Structure: CR 110 BIBLE RD
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 16.510,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 202347,  Location: 4.3 mi. South of USR 30 (Lat: 40.783111,  Lng: -84.051300),  Route carried "under" structure: Interstate 75,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 33,459 (year 2016),  Truck Traffic: 38%,  Features Intersected: CR 165 SLABTOWN RD,  Facility Carried by Structure: CR 165 SLABTOWN RD
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 19.151,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 202371,  Location: 3.8 mi. South of USR 30 (Lat: 40.789061,  Lng: -84.044019),  Route carried "under" structure: Interstate 75,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 33,516 (year 2016),  Truck Traffic: 36%,  Features Intersected: CR 106 BLUELICK RD,  Facility Carried by Structure: CR 106 BLUELICK RD
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 18.976,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 203637,  Location: 7.76 mi. East of IR75 (Lat: 40.826831,  Lng: -84.135769),  Route carried "under" structure: US 30,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 9,675 (year 2015),  Truck Traffic: 43%,  Features Intersected: S.R.115,  Facility Carried by Structure: SR 115
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 16.914,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Discuss Lima, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.