Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jersey City, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 180Number of bridges
  • 6,053ft / 1,845mTotal length
  • $471,236,000Total costs
  • 3,642,138Total average daily traffic
  • 219,597Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jersey City
  • No street view available for this location

New bridges in Jersey City, NJ - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 61910-1919
  • 161920-1929
  • 271930-1939
  • 581950-1959
  • 21960-1969
  • 21970-1979
  • 121980-1989
  • 91990-1999
  • 82000-2009
  • 352010-2019
  • 32020-2022
Reconstructed bridges in Jersey City, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11900-1909
  • 01910-1919
  • 01920-1929
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 41980-1989
  • 61990-1999
  • 22000-2009
  • 82010-2019
  • 12020-2022
Average Bridge Daily Traffic in Jersey City, NJ
Average Bridge Truck Traffic in Jersey City, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Excellent
  • 12.7%Very good
  • 32.4%Good
  • 32.4%Satisfactory
  • 12.7%Fair
  • 4.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.5%Excellent
  • 11.8%Very good
  • 21.1%Good
  • 26.3%Satisfactory
  • 25.0%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.6%Excellent
  • 10.5%Very good
  • 14.5%Good
  • 39.5%Satisfactory
  • 23.7%Fair
  • 5.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Excellent
  • 28.6%Good
  • 14.3%Satisfactory
  • 42.9%Fair
Find on map >>   Show street view

Structure Number: 91316,  Location: 0.5 MILE S.E.OF JFK BLVD. (Lat: 40.688350,  Lng: -74.097761),  Route carried "on" structure: State highway 440,  Year Built: 1991,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 23,570 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,760 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GARFIELD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.677,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.1m (125.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 38.1m (125.0ft),  Out-to-Out Width: 41.7m (136.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 92215,  Location: 0.11 Miles N of NJ 440 (Lat: 40.684911,  Lng: -74.092150),  Route carried "on" structure: State highway 185,  Year Built: 1985,  Status: Open,  Structure Length: 19.32m (63.39ft),  Average Daily Traffic: 13,685 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,420 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: NJ 440 NB,Conrail & PJR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 56.4m (185.0ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 950163,  Location: 0.7 MI NW OF NJTPK EX.14B (Lat: 40.711550,  Lng: -74.075319),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1913,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 14,345 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,214 (year 2040),  Design Load: H 20,  Features Intersected: HUDSON-BERGEN LIGHT RAIL,  Facility Carried by Structure: OCEAN AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 4.2m (13.8ft),  Right: 4.2m (13.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $619,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,094,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 950164,  Location: 0.7 MI NW of NJTPK EX 14B (Lat: 40.711211,  Lng: -74.074100),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 3,978 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,856 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: NJT Hudson Bergen LT RL,  Facility Carried by Structure: Clerk Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,743,000,  Roadway Improvement Cost: $1,186,000,  Total Project Cost: $17,787,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 951165,  Location: 0.8MI E OF US9&NJ495 JCT (Lat: 40.731361,  Lng: -74.053261),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 10,573 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,901 (year 2041),  Features Intersected: ABND BERGEN CO BRANCH,  Facility Carried by Structure: PALISADES AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 3,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Superstructure: Poor,  Substructure: Poor,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,128,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $3,277,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 951166,  Location: 50' South of NJ 139 (Lat: 40.732900,  Lng: -74.054981),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 12,927 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,773 (year 2041),  Features Intersected: BERGEN CO LINE (ABNDND),  Facility Carried by Structure: BALDWIN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 95416,  Location: 0.26 Mi S of RT 1+9T (Lat: 40.735350,  Lng: -74.067000),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 11,620 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,180 (year 2040),  Features Intersected: Passaic & Harimus Branch,  Facility Carried by Structure: Tonnele Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $851,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,698,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 954162,  Location: 0.47 MI S of RT 139 (Lat: 40.730592,  Lng: -74.061228),  Route carried "on" structure: City street ,  Year Built: 1924,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 15,560 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,990 (year 2040),  Features Intersected: Passaic & Harimus Branch,  Facility Carried by Structure: Summit Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 954163,  Location: 0.4 MI S of RT 139 (Lat: 40.729331,  Lng: -74.059911),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 38,705 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,750 (year 2040),  Features Intersected: Conrail & Path,  Facility Carried by Structure: Baldwin Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 2,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $2,367,000,  Roadway Improvement Cost: $159,000,  Total Project Cost: $5,473,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 954164,  Location: 1600FT SE OF JOURNAL SQ. (Lat: 40.728150,  Lng: -74.058369),  Route carried "on" structure: City street CR693,  Year Built: 1918,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 1,170 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,404 (year 2041),  Features Intersected: PATH&CONRAIL,  Facility Carried by Structure: CHESTNUT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 95816,  Location: 0.1MI SE OF NJTPK INT 14B (Lat: 40.700131,  Lng: -74.068511),  Route carried "on" structure: City street ,  Year Built: 1976,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 23,333 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,471 (year 2041),  Design Load: HL 93,  Features Intersected: NATIONAL STORAGE BRANCH,  Facility Carried by Structure: CAVEN POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 85.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,119,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $3,456,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 962154,  Location: 0.92MI NE NJTPK EXIT 14A (Lat: 40.694969,  Lng: -74.083600),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 3,396 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,143 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: HBLR&CONRAIL,  Facility Carried by Structure: CHAPEL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 79.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,864,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 962155,  Location: 0.57MI NE NJTPK EXIT 14A (Lat: 40.691369,  Lng: -74.088231),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 8,237 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,050 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: HBLR & CONRAIL (MP 3.27),  Facility Carried by Structure: LINDEN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $945,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $1,957,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100002,  Location: 290 ft. east of CR 615 (Lat: 40.577469,  Lng: -74.960719),  Route carried "on" structure: County highway 579,  Year Built: 1984,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,736 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,484 (year 2041),  Design Load: HS 20,  Features Intersected: CAPOOLONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 110002,  Location: 1.2 mile West of US 1 (Lat: 40.296089,  Lng: -74.704911),  Route carried "on" structure: County highway 583,  Year Built: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 18,605 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,700 (year 2041),  Features Intersected: SHIPETAUKIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.773,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 382304C,  Location: Jersey City, NJ (Lat: 40.634431,  Lng: -74.144950),  Route carried "on" structure: State highway 440,  Year Built: 2017,  Status: Open,  Structure Length: 72.57m (238.09ft),  Average Daily Traffic: 26,420 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 32,232 (year 2041),  Design Load: HL 93,  Features Intersected: Innis Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: Private,  Approaching Roadway Width: 14.6m (47.9ft),  Navigation Control: Yes ( Vertical Clearance: 30.2m (99.1ft), Horizontal Clearance: 30.2m (99.1ft)),  Material/Design: Prestressed concrete,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 82.9m (272.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: N00324,  Location: 1 MI E OF NEWARK BAY (Lat: 40.688333,  Lng: -74.103333),  Route carried "on" structure: Interstate 78,  Year Built: 1954,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 95,800 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 116,850 (year 2040),  Design Load: HS 20,  Features Intersected: AVENUE C,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.345,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 36.0m (118.1ft),  Out-to-Out Width: 38.8m (127.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.33m (14.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $1,000,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00339,  Location: I-SEC.RT.440 & HUD.CO.EXT (Lat: 40.686939,  Lng: -74.098950),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 95,790 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 116,850 (year 2040),  Design Load: HS 20,  Features Intersected: GARFIELD AVENUE,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.634,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00353B,  Location: I-SEC RT.440 &HUD.CO.EXT. (Lat: 40.686836,  Lng: -74.099044),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 18,675 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,780 (year 2040),  Design Load: HS 20,  Features Intersected: GARFIELD AVENUE,  Facility Carried by Structure: TPK HCE IN14A RPWT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.795,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00353C,  Location: I-SEC.RT.440 &HUD.CO.EXT. (Lat: 40.687831,  Lng: -74.098211),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 1954,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 17,950 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 21,900 (year 2040),  Design Load: HS 20,  Features Intersected: GARFIELD AVENUE,  Facility Carried by Structure: TPK HCE IN14A RPTW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.795,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00353D,  Location: 1.5 MI E OF NEWARK BAY (Lat: 40.685700,  Lng: -74.096119),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 29.93m (98.20ft),  Average Daily Traffic: 6,315 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,706 (year 2040),  Design Load: HS 20,  Features Intersected: NJ RTE.440 & CONRAIL,  Facility Carried by Structure: TPK HCE IN14A RPTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.795,  Lanes on structure: 1,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00353H,  Location: 1.07 Mile E of Newark Bay (Lat: 40.681361,  Lng: -74.096778),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 2017,  Status: Open,  Structure Length: 13.53m (44.39ft),  Average Daily Traffic: 22,820 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 27,845 (year 2040),  Design Load: HL 93,  Features Intersected: Route 440,  Facility Carried by Structure: RAMPS PORT/TP-440
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.795,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00353I,  Location: 1.10 Mile E of Newark Bay (Lat: 40.679583,  Lng: -74.095222),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 2017,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,880 (year 2040),  Design Load: HL 93,  Features Intersected: PORT JERSEY BLVD,  Facility Carried by Structure: INT 14A Ramp TP-44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.795,  Lanes on structure: 1,  Lanes under structure: 6,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00373,  Location: 1.7 MI E OF NEWARK BAY (Lat: 40.686239,  Lng: -74.092419),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 69.46m (227.89ft),  Average Daily Traffic: 74,100 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 90,375 (year 2040),  Design Load: HS 20,  Features Intersected: NJ440,RAMPS ET-TW &RR,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.795,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 28,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 69.46m (227.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $100,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00412,  Location: 2 MI E OF NEWARK BAY (Lat: 40.689400,  Lng: -74.086569),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 95,750 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 116,825 (year 2040),  Design Load: HS 20,  Features Intersected: LINDEN AVENUE,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.874,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N00452,  Location: 2.5 MI E OF NEWARK BAY (Lat: 40.607222,  Lng: -74.939722),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 11.52m (37.80ft),  Average Daily Traffic: 97,675 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 117,210 (year 2040),  Design Load: HS 20,  Features Intersected: CHAPEL AVENUE & L.V.RR.,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.550,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.52m (37.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $200,000,  Total Project Cost: $200,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00534,  Location: 3.2 MI E OF NEWARK BAY (Lat: 4.072222,  Lng: -74.069931),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 16.12m (52.89ft),  Average Daily Traffic: 95,750 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 116,825 (year 2040),  Design Load: HS 20,  Features Intersected: RR, BAYVIEW & PLANT RD,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.805,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.12m (52.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $20,000,000,  Roadway Improvement Cost: $2,000,000,  Total Project Cost: $22,000,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00556A,  Location: 3.4 MI E OF NEWARK BAY (Lat: 40.702550,  Lng: -74.066519),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 93,084 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 111,701 (year 2040),  Design Load: HS 20,  Features Intersected: INTERCHANGE 14B RP.TE-WT,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.078,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 29.8m (97.8ft),  Out-to-Out Width: 34.3m (112.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00556B,  Location: 3.5 MI E OF NEWARK BAY (Lat: 40.702258,  Lng: -74.075781),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 47.88m (157.09ft),  Average Daily Traffic: 7,775 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,475 (year 2040),  Design Load: HS 20,  Features Intersected: CONRAIL,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 29 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 47.88m (157.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,400,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $2,880,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00566,  Location: 3.6 MI E OF NEWARK BAY (Lat: 40.703833,  Lng: -74.065917),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Status: Open,  Structure Length: 11.98m (39.30ft),  Average Daily Traffic: 93,084 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 111,701 (year 2040),  Design Load: HS 20,  Features Intersected: CONRAIL,  Facility Carried by Structure: NJ TPK EXTENSION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.513,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 33.3m (109.3ft),  Out-to-Out Width: 35.2m (115.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00649,  Location: 2 MI SW OF HOLLAND TUNNEL (Lat: 40.712144,  Lng: -74.054119),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 130.12m (426.90ft),  Average Daily Traffic: 71,396 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 87,116 (year 2040),  Design Load: HS 20,  Features Intersected: RR & 5 ROADS,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.012,  Lanes on structure: 5,  Lanes under structure: 16,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 29 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 50.9m (167.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 33.5m (109.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: N00680E,  Location: 1.6 MI SW HOLLAND TUNNEL (Lat: 40.717783,  Lng: -74.055758),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 1955,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 18.23m (59.81ft),  Average Daily Traffic: 10,073 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,292 (year 2040),  Design Load: HS 20,  Features Intersected: COLDEN ST, GRAND ST,  Facility Carried by Structure: GRAND ST OFF RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.138,  Lanes on structure: 2,  Lanes under structure: 7,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.15m (69.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $150,000,  Total Project Cost: $150,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00680W,  Location: 1.6 MI SW HOLLAND TUNNEL (Lat: 40.717853,  Lng: -74.056192),  Route carried "on" structure: Ramp Interstate 78,  Year Built: 1955,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 22.52m (73.88ft),  Average Daily Traffic: 10,275 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,538 (year 2040),  Design Load: HS 20,  Features Intersected: COLDEN ST,GRAND ST,  Facility Carried by Structure: GRAND ST ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.138,  Lanes on structure: 1,  Lanes under structure: 7,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 9,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.15m (69.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $150,000,  Total Project Cost: $150,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00713,  Location: 1 MI SW OF HOLLAND TUNNEL (Lat: 40.717586,  Lng: -74.056000),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 71.78m (235.50ft),  Average Daily Traffic: 68,706 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 83,834 (year 2040),  Design Load: HS 20,  Features Intersected: CONRAIL WALDO YARD & STS,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.235,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 26,  Length of Maximum Span: 50.3m (165.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 26.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00752,  Location: .5 MI SW HOLLAND TUNNEL (Lat: 40.726578,  Lng: -74.053125),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 62.24m (204.20ft),  Average Daily Traffic: 64,172 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 78,303 (year 2040),  Design Load: H 20,  Features Intersected: NEWARK,7TH,3RD,&CONRAIL,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.458,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 25,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 30.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 54.86m (179.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $150,000,  Total Project Cost: $150,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N00790E,  Location: .2 MI SW HOLLAND TUNNEL (Lat: 40.730278,  Lng: -74.051336),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 61.05m (200.30ft),  Average Daily Traffic: 30,515 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,234 (year 2040),  Design Load: HS 20,  Features Intersected: MONMOUTH,COLES,& CONRAIL,  Facility Carried by Structure: NJ TPK HUD.CO.EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.860,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 25,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 61.05m (200.30ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Discuss Jersey City, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.