Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jasper, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 95Number of bridges
  • 1,427ft / 435mTotal length
  • $206,856,000Total costs
  • 610,307Total average daily traffic
  • 92,842Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jasper
  • No street view available for this location

New bridges in Jasper, AL - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 31930-1939
  • 71940-1949
  • 41950-1959
  • 141960-1969
  • 61970-1979
  • 31980-1989
  • 411990-1999
  • 152000-2009
Average Bridge Daily Traffic in Jasper, AL
Average Bridge Truck Traffic in Jasper, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 55.6%Good
  • 25.9%Satisfactory
  • 11.1%Fair
  • 1.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.7%Very good
  • 63.0%Good
  • 20.4%Satisfactory
  • 5.6%Fair
  • 7.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 63.0%Good
  • 20.4%Satisfactory
  • 7.4%Fair
  • 3.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 50.0%Good
  • 32.0%Satisfactory
  • 8.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.1%Good
  • 57.9%Satisfactory
Find on map >>   Show street view

Structure Number: 2,  Location: 1 MILE EAST HWY 195 (Lat: 33.908417,  Lng: -87.288250),  Route carried "on" structure: County highway ,  Year Built: 1898,  Status: Closed,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 400 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 560 (year 2032),  Design Load: H 10,  Features Intersected: BLACKWATER CREEK,  Facility Carried by Structure: COUNTRY CLUB ROAD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: October 2019,  Critical Feature Inspection Date: October 2019,  Other Special Inspection Date: April 2020,  Bridge Improvement Cost: $511,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $562,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 691,  Location: 1.1MI.NJCTAL118 (Lat: 33.865000,  Lng: -87.288300),  Route carried "on" structure: State highway 195,  Year Built: 1929,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10,140 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,373 (year 2041),  Features Intersected: Springlet of Mooneys BK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.975,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $334,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 757,  Location: 17TH ST * 1ST AVE (Lat: 33.834800,  Lng: -87.276400),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 1.48m (4.86ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 17 TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.15m (7.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $373,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1408,  Location: 3RD AVE * 25TH ST (Lat: 33.826500,  Lng: -87.277300),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,100 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2041),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: 3RD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1481,  Location: AL 69 * POLEY CREEK (Lat: 33.840800,  Lng: -87.215100),  Route carried "on" structure: State highway 69,  Year Built: 1936,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 5,100 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 6,629 (year 2041),  Design Load: H 15,  Features Intersected: Poley Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 335.251,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $598,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2221,  Location: 1 MILE N CORDOVA (Lat: 33.783333,  Lng: -87.233333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 450 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 630 (year 2032),  Features Intersected: SPOKAGE CREEK,  Facility Carried by Structure: EAST LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2222,  Location: 1 MILE S JASPER (Lat: 33.800000,  Lng: -87.233333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 450 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 630 (year 2032),  Features Intersected: FLAT BRANCH,  Facility Carried by Structure: WHITEHOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2223,  Location: 1 MILE S JASPER (Lat: 33.783333,  Lng: -87.250000),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 325 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 455 (year 2032),  Features Intersected: BATES CREEK,  Facility Carried by Structure: WHITEHOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.33m (7.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2226,  Location: 1/2 MILE N HWY 78 (Lat: 33.833333,  Lng: -87.183333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2032),  Features Intersected: POLEY CREEK,  Facility Carried by Structure: VALLEY SCHOOL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2235,  Location: 3 MILE E HWY 69 (Lat: 33.783333,  Lng: -87.366667),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 350 (year 1991),  Truck Traffic: 20%,  Average Future Daily Traffic: 790 (year 2032),  Features Intersected: LITTLE INDIAN CREEK,  Facility Carried by Structure: TUTWILER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $294,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2253,  Location: AL 5 * DRY CREEK (Lat: 33.911300,  Lng: -87.375875),  Route carried "on" structure: State highway 5,  Year Built: 1940,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 4,070 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,096 (year 2040),  Design Load: H 15,  Features Intersected: Dry Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 288.213,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $571,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 319,  Location: 8 TH AVE * 19 TH ST (Lat: 33.832400,  Lng: -87.284000),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Posted for load,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: 8 TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.4m (27.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.39m (7.84ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $469,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3654,  Location: 26TH ST * 3RD AVE (Lat: 33.733333,  Lng: -87.233333),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 26TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.0m,  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $969,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 409,  Location: .5M.SO. AL 124 INTER. (Lat: 33.807453,  Lng: -87.333056),  Route carried "on" structure: State highway 69,  Year Built: 1951,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 4,170 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,421 (year 2041),  Design Load: H 15,  Features Intersected: BNSF RailRoad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 316.844,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,299,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,429,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5458,  Location: AL 5 * TOWN CREEK (Lat: 33.849589,  Lng: -87.273672),  Route carried "on" structure: State highway 5,  Year Built: 1956,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 5,610 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 7,024 (year 2041),  Design Load: H 15,  Features Intersected: Town Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 280.375,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,032,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,135,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5473,  Location: WRIGHT ST * 3RD AVE (Lat: 33.841600,  Lng: -87.277400),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 1,860 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: WRIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $327,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6885,  Location: 1 MILE S HWY 78 (Lat: 33.847000,  Lng: -87.380100),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 210 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2032),  Design Load: H 15,  Features Intersected: BURTON CREEK,  Facility Carried by Structure: HOLLY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $296,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6886,  Location: 1 1/2 MILE S HWY 78 (Lat: 33.844800,  Lng: -87.400600),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 225 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2032),  Design Load: H 15,  Features Intersected: PAUL CREEK,  Facility Carried by Structure: HOLLY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6891,  Location: 2 MILES E HWY 269 (Lat: 33.766667,  Lng: -87.250000),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 225 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 315 (year 2032),  Design Load: H 15,  Features Intersected: CANE CREEK,  Facility Carried by Structure: MANUAL HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $172,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 7132,  Location: .6 MI W of Blackwell road (Lat: 33.864306,  Lng: -87.405111),  Route carried "on" structure: State highway 118,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,050 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,445 (year 2041),  Design Load: H 15,  Features Intersected: Paul Creek
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 83.042,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $969,000 ( Estimate for 2019),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7133,  Location: .5 MI E I-22 (Lat: 33.854167,  Lng: -87.400111),  Route carried "on" structure: State highway 118,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,050 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,445 (year 2041),  Design Load: H 15,  Features Intersected: Cold Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.525,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $640,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7134,  Location: 0.04 MI E of Blackwell Rd (Lat: 33.859594,  Lng: -87.378589),  Route carried "on" structure: State highway 118,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,050 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,445 (year 2041),  Design Load: H 15,  Features Intersected: Burton Creek
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 85.537,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $645,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $710,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7295,  Location: 4 MILE N JASPER (Lat: 33.904556,  Lng: -87.228472),  Route carried "on" structure: County highway 51,  Year Built: 1961,  Status: Posted for load,  Structure Length: 9.52m (31.23ft),  Average Daily Traffic: 700 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,200 (year 2033),  Design Load: H 15,  Features Intersected: BLACKWATER CREEK,  Facility Carried by Structure: WALSTON BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 10.47m (34.35ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,722,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,894,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7638,  Location: US 78 * AL 5 (Lat: 33.848586,  Lng: -87.285786),  Route carried "on" structure: State highway 5,  Year Built: 1962,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 23,120 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 28,946 (year 2041),  Design Load: HS 20,  Features Intersected: US-78
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.585,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.37m (17.62ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,400,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,540,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9997,  Location: 18TH ST * 2ND AVE (Lat: 33.770000,  Lng: -87.280000),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 18TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,028,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,131,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10107,  Location: AL-257 * BLACKWATER CK (Lat: 33.908669,  Lng: -87.257142),  Route carried "on" structure: State highway 257,  Year Built: 1969,  Status: Open,  Structure Length: 10.03m (32.91ft),  Average Daily Traffic: 7,960 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,205 (year 2041),  Design Load: HS 20,  Features Intersected: Blackwater Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.370,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.96m (35.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,382,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $3,720,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10108,  Location: AL-257 * ROCK CK (Lat: 33.925736,  Lng: -87.239275),  Route carried "on" structure: State highway 257,  Year Built: 1969,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 8,290 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,628 (year 2041),  Design Load: HS 15,  Features Intersected: Rock Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.945,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,044,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,148,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10113,  Location: AL-269 * BURLINGTON RR (Lat: 33.816306,  Lng: -87.282792),  Route carried "on" structure: State highway 269,  Year Built: 1967,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 5,690 (year 2013),  Truck Traffic: 18%,  Average Future Daily Traffic: 6,943 (year 2041),  Design Load: HS 20,  Features Intersected: BNSF Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.374,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.98m (19.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,846,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,031,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10272,  Location: 18TH ST * AL 69 (Lat: 33.793333,  Lng: -87.296667),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: 18TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $439,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $483,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10306,  Location: 18TH ST * SOU RR (Lat: 33.766667,  Lng: -87.266667),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 7,500 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,000 (year 2041),  Design Load: HS 20,  Features Intersected: SOUTHERN RAILROAD,  Facility Carried by Structure: 18TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.019,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.75m (18.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,683,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $2,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10741,  Location: RUSSELVILLE RD * CHEROKEE (Lat: 33.750000,  Lng: -87.250000),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2040),  Design Load: H 15,  Features Intersected: TANYARD CREEK,  Facility Carried by Structure: RUSSELVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10911,  Location: 1 MILE S HWY 124 (Lat: 33.802167,  Lng: -87.367583),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 3.98m (13.06ft),  Average Daily Traffic: 325 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 524 (year 2032),  Design Load: H 15,  Features Intersected: LOST CREEK,  Facility Carried by Structure: PLEASANT GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $744,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $818,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 11167,  Location: 1/4 MILE W HWY 5 (Lat: 33.900000,  Lng: -87.366667),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 145 (year 1995),  Truck Traffic: 1%,  Average Future Daily Traffic: 203 (year 2032),  Design Load: H 10,  Features Intersected: DRY CREEK,  Facility Carried by Structure: NICHOLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 69.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $219,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 11954,  Location: 500 FT N HWY 78 (Lat: 33.867700,  Lng: -87.371200),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Closed,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 30 (year 1991),  Average Future Daily Traffic: 42 (year 2025),  Design Load: H 10,  Features Intersected: BURTON CREEK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.7m (15.4ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2005,  Critical Feature Inspection Date: January 2005,  Other Special Inspection Date: January 2005,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $145,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 13348,  Location: AL-69 * 19TH ST (Lat: 33.831972,  Lng: -87.283806),  Route carried "on" structure: State highway 69,  Year Built: 1984,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 8,190 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,646 (year 2037),  Design Load: HS 20,  Features Intersected: Tanyard Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 322.834,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,061,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,167,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13618,  Location: 20TH ST * TOWN CREEK (Lat: 33.831667,  Lng: -87.275000),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 6,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 20TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14254,  Location: 1.7 MILES NORTH AL 269 (Lat: 33.850742,  Lng: -87.302814),  Route carried "on" structure: State highway 69,  Year Built: 1987,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,050 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,665 (year 2041),  Design Load: HS 20,  Features Intersected: Stream
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.570,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,516,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,668,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15643,  Location: 2 MILE EAST HWY 195 (Lat: 33.950000,  Lng: -87.283333),  Route carried "on" structure: County highway 27,  Year Built: 1991,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 550 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2016),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,677,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $1,845,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16281,  Location: 19TH STREET * AL. AVE (Lat: 33.758333,  Lng: -87.283333),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 8,600 (year 2020),  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 19TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.9m (42.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,240,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16322,  Location: 0.5 Miles East AL-269 (Lat: 33.806639,  Lng: -87.270467),  Route carried "on" structure: Interstate 22,  Year Built: 1998,  Status: Open,  Structure Length: 41.76m (137.01ft),  Average Daily Traffic: 7,420 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,053 (year 2041),  Design Load: HS 20,  Features Intersected: NS Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.871,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Number Of Approach Spans: 6,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.76m (137.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $16,607,000,  Roadway Improvement Cost: $1,661,000,  Total Project Cost: $18,268,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Jasper, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.