Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gillette, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 67Number of bridges
  • 623ft / 190mTotal length
  • $1,623,000Total costs
  • 400,977Total average daily traffic
  • 31,204Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gillette
  • No street view available for this location

New bridges in Gillette, WY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 41950-1959
  • 291970-1979
  • 151980-1989
  • 61990-1999
  • 62000-2009
  • 62010-2019
Average Bridge Daily Traffic in Gillette, WY
Average Bridge Truck Traffic in Gillette, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.7%Very good
  • 40.7%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.5%Very good
  • 29.6%Good
  • 37.0%Satisfactory
  • 11.1%Fair
  • 3.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 44.4%Good
  • 44.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Very good
  • 32.1%Good
  • 17.9%Satisfactory
  • 7.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.7%Very good
  • 30.4%Good
  • 43.5%Satisfactory
  • 17.4%Fair
Find on map >>   Show street view

Structure Number: MBF,  Location: P-43 Gillette St/Douglas (Lat: 44.272097,  Lng: -105.494078),  Route carried "on" structure: State highway 59,  Year Built: 2008,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 21,193 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,670 (year 2041),  Design Load: HL 93,  Features Intersected: Homestead Trickle
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.072,  Lanes on structure: 7,  Base Highway Network: Yes (Inventory Route: ML4,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: MCO,  Location: Gillette (Lat: 44.287586,  Lng: -105.520972),  Route carried "on" structure: City street 4626,  Year Built: 2010,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 3,980 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 5,572 (year 2041),  Design Load: HL 93,  Features Intersected: I-90,  Facility Carried by Structure: Oakcrest Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.436,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 57.9m (190.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MFI,  Location: 4 Mi N Of Gillette (Lat: 44.361483,  Lng: -105.523067),  Route carried "on" structure: US 302,  Year Built: 2009,  Status: Open,  Structure Length: 1.38m (4.53ft),  Average Daily Traffic: 2,965 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,151 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Little Rawhide Creek,  Facility Carried by Structure: US 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.291,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 66.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: MQC,  Location: Gillette, Butler Spaeth R (Lat: 44.269111,  Lng: -105.483169),  Route carried "on" structure: City street 4600,  Year Built: 2007,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 5,896 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,254 (year 2041),  Design Load: HL 93,  Features Intersected: Donkey Creek,  Facility Carried by Structure: Butler Spaeth Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 157.993,  Lanes on structure: 4,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MQF,  Location: Gillette, Shoshone Ave (Lat: 44.253756,  Lng: -105.505967),  Route carried "on" structure: City street 4630,  Year Built: 2007,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 3,521 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 4,929 (year 2041),  Features Intersected: Donkey Creek,  Facility Carried by Structure: Shoshone Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.790,  Lanes on structure: 3,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 13.9m (45.6ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: NBY,  Location: Gillette - Montana Line (Lat: 44.366069,  Lng: -105.418522),  Route carried "on" structure: County highway 38N,  Year Built: 2019,  Status: Open,  Structure Length: 12.28m (40.29ft),  Average Daily Traffic: 689 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 965 (year 2041),  Design Load: HL 93,  Features Intersected: BNSF Railway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.279,  Lanes on structure: 2,  Owner: County Highway Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NCL,  Location: Gillette Streets (Lat: 44.258344,  Lng: -105.546622),  Route carried "on" structure: State highway 50,  Year Built: 2019,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 11,567 (year 2021),  Average Future Daily Traffic: 16,194 (year 2041),  Design Load: HL 93,  Features Intersected: Donkey Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.558,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: BFX,  Location: Gillette (Lat: 44.292853,  Lng: -105.531114),  Route carried "under" structure: State highway 50,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,567 (year 2021),  Truck Traffic: 4%,  Features Intersected: WYO 50 / Skyline Drive,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 2.466,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: BFY,  Location: Gillette (Lat: 44.293017,  Lng: -105.531022),  Route carried "under" structure: State highway 50,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,567 (year 2021),  Truck Traffic: 4%,  Features Intersected: WYO 50 / Skyline Drive,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 2.446,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: CDM,  Location: Gillette - Moorcroft (Lat: 44.293058,  Lng: -105.371933),  Route carried "under" structure: Interstate 90,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 4,001 (year 2021),  Truck Traffic: 13%,  Features Intersected: I-90,  Facility Carried by Structure: Cl Cnty Rd 3
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 216.497,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: CDM,  Location: Gillette - Moorcroft (Lat: 44.293058,  Lng: -105.371933),  Route carried "under" structure: Interstate 90,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 4,040 (year 2021),  Truck Traffic: 13%,  Features Intersected: I-90,  Facility Carried by Structure: Cl Cnty Rd 3
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 216.322,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: CRA,  Location: Gillette (Lat: 44.281608,  Lng: -105.510147),  Route carried "under" structure: City street 4620,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,085 (year 2021),  Truck Traffic: 1%,  Features Intersected: 4-J Road,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 1.294,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: CSC,  Location: Gillette (Lat: 44.281875,  Lng: -105.510172),  Route carried "under" structure: City street 4620,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,085 (year 2021),  Truck Traffic: 1%,  Features Intersected: 4-J Road,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 1.263,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: CYK,  Location: Gillette (Lat: 44.279447,  Lng: -105.494458),  Route carried "under" structure: State highway 59,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 30,185 (year 2021),  Truck Traffic: 6%,  Features Intersected: WYO 59,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 181.890,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: CYL,  Location: Gillette (Lat: 44.279639,  Lng: -105.494444),  Route carried "under" structure: State highway 59,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 30,185 (year 2021),  Truck Traffic: 6%,  Features Intersected: WYO 59,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 181.912,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: DAI,  Location: Gillette (Lat: 44.289819,  Lng: -105.467297),  Route carried "under" structure: Business State highway 62,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 4,485 (year 2021),  Truck Traffic: 6%,  Features Intersected: BNSF / US 14/16,  Facility Carried by Structure: I-90 EBL and WBL
Minimum Vertical Clearance: 8.56m (28.08ft),  Kilometerpoint: 205.309,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: DAK,  Location: Gillette - Moorcroft (Lat: 44.295069,  Lng: -105.426861),  Route carried "under" structure: City street ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 472 (year 2021),  Truck Traffic: 2%,  Features Intersected: Hi-Line Rd,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 167.204,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: DAL,  Location: Gillette - Moorcroft (Lat: 44.295303,  Lng: -105.426869),  Route carried "under" structure: County highway ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 472 (year 2021),  Truck Traffic: 2%,  Features Intersected: Hi-Line Rd,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 167.204,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: DIB,  Location: Gillette (Lat: 44.297500,  Lng: -105.529342),  Route carried "under" structure: State highway 59,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 7,838 (year 2021),  Truck Traffic: 3%,  Features Intersected: WYO 59,  Facility Carried by Structure: BNSF Railway
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 186.520,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: FBR,  Location: Gillette/Gurley Ave.Viad. (Lat: 44.291525,  Lng: -105.488931),  Route carried "under" structure: US 62,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 1,421 (year 2021),  Truck Traffic: 10%,  Features Intersected: BNSF / US 14/16,  Facility Carried by Structure: S Gurley Avenue
Minimum Vertical Clearance: 6.41m (21.03ft),  Kilometerpoint: 203.558,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: FIT,  Location: Gillette-Moorcroft (Lat: 44.294761,  Lng: -105.449739),  Route carried "under" structure: Interstate 90,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,750 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-90,  Facility Carried by Structure: Cl Cnty Rd 38N
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 210.077,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: FIT,  Location: Gillette-Moorcroft (Lat: 44.294761,  Lng: -105.449739),  Route carried "under" structure: Interstate 90,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,050 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-90,  Facility Carried by Structure: Cl Cnty Rd 38N
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 210.261,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: MCO,  Location: Gillette (Lat: 44.287586,  Lng: -105.520972),  Route carried "under" structure: Interstate 90,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-90,  Facility Carried by Structure: Oakcrest Drive
Minimum Vertical Clearance: 5.60m (18.37ft),  Kilometerpoint: 203.276,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: MCO,  Location: Gillette (Lat: 44.287586,  Lng: -105.520972),  Route carried "under" structure: Interstate 90,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 5,466 (year 2021),  Truck Traffic: 4%,  Features Intersected: I-90,  Facility Carried by Structure: Oakcrest Drive
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 203.445,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Discuss Gillette, Wyoming (WY) on our hugely popular Wyoming forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.