Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ennis, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 154Number of bridges
  • 2,621ft / 799mTotal length
  • $46,000Total costs
  • 1,243,793Total average daily traffic
  • 174,396Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ennis
  • No street view available for this location

New bridges in Ennis, TX - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 31940-1949
  • 131950-1959
  • 81960-1969
  • 71970-1979
  • 191980-1989
  • 511990-1999
  • 92000-2009
  • 332010-2019
  • 72020-2022
Reconstructed bridges in Ennis, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 31970-1979
  • 31980-1989
  • 11990-1999
  • 42000-2009
  • 72010-2019
Average Bridge Daily Traffic in Ennis, TX
Average Bridge Truck Traffic in Ennis, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.8%Very good
  • 67.8%Good
  • 16.1%Satisfactory
  • 2.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 31.0%Very good
  • 35.6%Good
  • 29.9%Satisfactory
  • 3.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.6%Very good
  • 50.6%Good
  • 27.6%Satisfactory
  • 9.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Very good
  • 37.3%Good
  • 33.3%Satisfactory
  • 10.8%Fair
  • 1.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.0%Very good
  • 62.5%Good
  • 30.0%Satisfactory
  • 2.5%Fair
Find on map >>   Show street view

Structure Number: 18071000920433,  Location: 0.8 MI N OF FM 1181 (Lat: 32.334364,  Lng: -96.615467),  Route carried "under" structure: State highway 34,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2011),  Truck Traffic: 11%,  Features Intersected: SH 34,  Facility Carried by Structure: IH 45 NB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 17.619,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180710009204331,  Location: 0.8 MI N OF FM 1181 (Lat: 32.334258,  Lng: -96.615892),  Route carried "under" structure: State highway 34,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 3,900 (year 2011),  Truck Traffic: 14%,  Features Intersected: SH 34,  Facility Carried by Structure: IH 45 SB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 12.928,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180710009204332,  Location: 2.2 MI S OF FM 879 (Lat: 32.347719,  Lng: -96.624086),  Route carried "under" structure: Interstate 45,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 37,870 (year 2013),  Truck Traffic: 23%,  Features Intersected: IH 45,  Facility Carried by Structure: CRISP RD
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 14.632,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 180710009204333,  Location: 1.3 MI S OF FM 879 (Lat: 32.359375,  Lng: -96.631878),  Route carried "under" structure: Interstate 45,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 37,870 (year 2013),  Truck Traffic: 23%,  Features Intersected: IH 45
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 14.491,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180710009205334,  Location: 2.1 MI S OF SH 34 (Lat: 32.310489,  Lng: -96.596381),  Route carried "under" structure: US 287,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 6,900 (year 2011),  Truck Traffic: 15%,  Features Intersected: FM 85,  Facility Carried by Structure: IH 45 NB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 28.646,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 180710009205335,  Location: 2.1 MI S OF SH 34 (Lat: 32.310514,  Lng: -96.596867),  Route carried "under" structure: State highway 85,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 7,200 (year 2011),  Truck Traffic: 15%,  Features Intersected: FM 85,  Facility Carried by Structure: IH 45 SB
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 9.724,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 180710009205336,  Location: 0.8 MI S OF SH 34 (Lat: 32.324683,  Lng: -96.608844),  Route carried "under" structure: Interstate 45,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 37,090 (year 2013),  Truck Traffic: 22%,  Features Intersected: IH 45,  Facility Carried by Structure: FM 1181
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 11.703,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 18071001720818,  Location: 6.1 MI W OF IH 45 (Lat: 32.317389,  Lng: -96.656933),  Route carried "under" structure: US 287,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 13,820 (year 2013),  Truck Traffic: 15%,  Features Intersected: US 287,  Facility Carried by Structure: ENNIS PKWY
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 180710017208182,  Location: 4.5 MI W OF IH 45 (Lat: 32.300447,  Lng: -96.639161),  Route carried "under" structure: State highway 34,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 5,550 (year 2011),  Features Intersected: SH 34,  Facility Carried by Structure: US 287 SB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 16.095,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 180710017208453,  Location: 4.5 MI W OF IH 45 (Lat: 32.300364,  Lng: -96.638733),  Route carried "under" structure: State highway 34,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 5,550 (year 2011),  Features Intersected: SH 34,  Facility Carried by Structure: US 287 NB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 16.095,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 180710017208454,  Location: 6.2 MI W OF IH 45 (Lat: 32.319303,  Lng: -96.658508),  Route carried "under" structure: Business State highway 287,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 4,600 (year 2011),  Features Intersected: BUS 287 SB
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 7.854,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 180710017208455,  Location: 0.10 MI S OF US 287 (Lat: 32.319444,  Lng: -96.659722),  Route carried "under" structure: State highway 287,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2013),  Truck Traffic: 1%,  Features Intersected: LITTLE MUSTANG CREEK
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 180710017208457,  Location: 0.50 MI NW of SH 34 (Lat: 32.307142,  Lng: -96.644633),  Route carried "under" structure: State highway 287,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2013),  Truck Traffic: 1%,  Features Intersected: US 287,  Facility Carried by Structure: LAMPASAS EB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 180710017208458,  Location: 0.50 NI NW of SH 34 (Lat: 32.307533,  Lng: -96.644469),  Route carried "under" structure: State highway 287,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2013),  Features Intersected: US 287,  Facility Carried by Structure: LAMPASAS WB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 180710017208482,  Location: 2.2 MI W OF IH 45 (Lat: 32.289039,  Lng: -96.603892),  Route carried "under" structure: State highway 1183,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 710 (year 2019),  Truck Traffic: 7%,  Features Intersected: US 287 NB,  Facility Carried by Structure: US 287 NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 180710017208483,  Location: 2.1 MI W OF IH 45 (Lat: 32.288828,  Lng: -96.603375),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 5%,  Features Intersected: US 287 SBML,  Facility Carried by Structure: US 287 SBML
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 180710017208484,  Location: 3.2 MI W OF IH 45 (Lat: 32.289728,  Lng: -96.621761),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 4,753 (year 2019),  Truck Traffic: 3%,  Features Intersected: US 287 NB,  Facility Carried by Structure: US 287 NB
Minimum Vertical Clearance: 5.13m (16.83ft),  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 180710017208485,  Location: 1.3 MI W OF IH 45 (Lat: 32.289247,  Lng: -96.589967),  Route carried "under" structure: City street ,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1,141 (year 2019),  Truck Traffic: 3%,  Features Intersected: US 287 NB,  Facility Carried by Structure: US 287 NB
Minimum Vertical Clearance: 5.11m (16.77ft),  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 180710017208486,  Location: 0.8 MI W OF IH 45 (Lat: 32.289019,  Lng: -96.589839),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 5%,  Features Intersected: US 287 SBML,  Facility Carried by Structure: US 287 SBML
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 180710017208487,  Location: 3.2 MI W OF IH 45 (Lat: 32.289533,  Lng: -96.621819),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 5%,  Features Intersected: US 287 SBML,  Facility Carried by Structure: US 287 SBML
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 180710017212179,  Location: 6.2 MI W OF IH 45 (Lat: 32.319772,  Lng: -96.659836),  Route carried "under" structure: Business State highway 287,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 4,600 (year 2011),  Features Intersected: BUS 287 SB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 7.854,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 180710017212361,  Location: 0.05 MI W OF IH 45 (Lat: 32.296967,  Lng: -96.572711),  Route carried "under" structure: ServiceInterstate 45,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Features Intersected: SPRR & IH 45 SBFR,  Facility Carried by Structure: US 287 CONN W-N
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 7.133,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 180710017212362,  Location: 0.05 MI W OF IH 45 (Lat: 32.296294,  Lng: -96.571489),  Route carried "under" structure: ServiceInterstate 45,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Features Intersected: SPRR & IH 45 SBFR,  Facility Carried by Structure: US 287 CONN W-S
Minimum Vertical Clearance: 8.61m (28.25ft),  Kilometerpoint: 7.133,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 180710017212363,  Location: 0.05 MI W OF IH 45 (Lat: 32.296583,  Lng: -96.571831),  Route carried "under" structure: ServiceInterstate 45,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Features Intersected: SPRR & IH 45 SBFR,  Facility Carried by Structure: US 287 NB
Minimum Vertical Clearance: 8.43m (27.66ft),  Kilometerpoint: 7.133,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180710017212364,  Location: 0.05 MI W OF IH 45 (Lat: 32.296489,  Lng: -96.571650),  Route carried "under" structure: ServiceInterstate 45,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Features Intersected: SPRR & IH 45 SBFR,  Facility Carried by Structure: US 287 SB
Minimum Vertical Clearance: 8.74m (28.67ft),  Kilometerpoint: 7.133,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 180710017212367,  Location: US 287 AT IH 45 (Lat: 32.297881,  Lng: -96.569658),  Route carried "under" structure: Interstate 45,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Features Intersected: IH 45,  Facility Carried by Structure: US 287 NB
Minimum Vertical Clearance: 9.17m (30.09ft),  Kilometerpoint: 7.133,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 180710017212368,  Location: US 287 AT IH 45 (Lat: 32.297747,  Lng: -96.569369),  Route carried "under" structure: Interstate 45,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Features Intersected: IH 45,  Facility Carried by Structure: US 287 SB
Minimum Vertical Clearance: 9.07m (29.76ft),  Kilometerpoint: 7.133,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Discuss Ennis, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.