  • National Bridge Inventory (NBI) Statistics
  • 83Number of bridges
  • 912ft / 278mTotal length
  • $128,270,000Total costs
  • 495,239Total average daily traffic
  • 124,355Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clinton
  • No street view available for this location

New bridges in Clinton, OK - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41930-1939
  • 11940-1949
  • 201950-1959
  • 311960-1969
  • 101980-1989
  • 61990-1999
  • 72000-2009
  • 32010-2019
Reconstructed bridges in Clinton, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Clinton, OK
Average Bridge Truck Traffic in Clinton, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.5%Very good
  • 55.8%Good
  • 17.3%Satisfactory
  • 13.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.5%Very good
  • 53.8%Good
  • 21.2%Satisfactory
  • 13.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 19.2%Very good
  • 48.1%Good
  • 11.5%Satisfactory
  • 19.2%Fair
  • 1.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 47.7%Good
  • 27.3%Satisfactory
  • 15.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 63.6%Good
  • 27.3%Satisfactory
Find on map >>   Show street view

Structure Number: 865,  Location: 3N 7.5W OF WEATHERFORD (Lat: 35.566011,  Lng: -98.837114),  Route carried "on" structure: County highway E1000,  Year Built: 1920,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 64 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 2619,  Location: 0.3 MI N WASHITA C/L (Lat: 35.470097,  Lng: -98.975561),  Route carried "on" structure: US 183,  Year Built: 1930,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,280 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $395,000,  Total Project Cost: $671,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 3192,  Location: 3.7 MI E JCT I-40 BUS (Lat: 35.515842,  Lng: -98.846161),  Route carried "on" structure: ServiceUS 40,  Year Built: 1930,  Status: Posted for load,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.643,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 7.59m (24.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $1,041,000,  Total Project Cost: $1,767,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5349,  Location: 2.8 MI N WASHITA C/L (Lat: 35.503544,  Lng: -98.964408),  Route carried "on" structure: US 183,  Year Built: 1937,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 7,400 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,840 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $562,000,  Total Project Cost: $953,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 7299,  Location: .5N .1W OF 183&66 JCT (Lat: 35.522178,  Lng: -98.968700),  Route carried "on" structure: County highway E1030,  Year Built: 1939,  Status: Posted for load,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 480 (year 2040),  Features Intersected: FMRC R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $271,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9805,  Location: 1.5N. 2.7E. OF CLINTON (Lat: 35.537497,  Lng: -98.918075),  Route carried "on" structure: County highway E1020,  Year Built: 1941,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 38 (year 2040),  Features Intersected: TURTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.23m (17.16ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $426,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12926,  Location: 0.7 MI E JCT US-183 (Lat: 35.515431,  Lng: -98.953689),  Route carried "on" structure: Business State highway 40B,  Year Built: 1953,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,400 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: I-40 BUS.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.826,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 90.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $685,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13123,  Location: .5 MI E JCT US183 (Lat: 35.515394,  Lng: -98.958000),  Route carried "on" structure: Business State highway 40B,  Year Built: 1953,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 24.44m (80.18ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,200 (year 2040),  Design Load: HS 20,  Features Intersected: WASHITA RIVER,  Facility Carried by Structure: I-40 BUS.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 6.758,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 24.44m (80.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $5,330,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $10,386,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14064,  Location: 4.2 MI NE WASHITA C/L (Lat: 35.479825,  Lng: -99.074503),  Route carried "on" structure: Interstate 40,  Year Built: 1958,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 19,100 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 30,560 (year 2040),  Design Load: HS 20,  Features Intersected: HACKBERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.677,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $556,000,  Roadway Improvement Cost: $917,000,  Total Project Cost: $1,556,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14065,  Location: 5.8 MI NE WASHITA C/L (Lat: 35.479800,  Lng: -99.046169),  Route carried "on" structure: Interstate 40,  Year Built: 1958,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 30,400 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.252,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $466,000,  Roadway Improvement Cost: $769,000,  Total Project Cost: $1,305,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14101,  Location: 5.5 MI NE WASHITA C/L (Lat: 35.480158,  Lng: -99.051222),  Route carried "on" structure: Interstate 40,  Year Built: 1958,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 14,880 (year 2040),  Design Load: HS 20,  Features Intersected: HAGGARD ROAD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.802,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $1,393,000,  Total Project Cost: $2,364,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14102,  Location: 5.5 MI NE WASHITA C/L (Lat: 35.479861,  Lng: -99.051222),  Route carried "on" structure: Interstate 40,  Year Built: 1958,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 9,550 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 15,280 (year 2040),  Design Load: HS 20,  Features Intersected: HAGGARD ROAD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.802,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $1,393,000,  Total Project Cost: $2,364,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14293,  Location: 7.2 MI NE WASHITA C/L (Lat: 35.481378,  Lng: -99.021194),  Route carried "on" structure: Interstate 40,  Year Built: 1959,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 19,100 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 30,560 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.537,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $901,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14404,  Location: 2.0 MI E JCT U.S. 183 (Lat: 35.515169,  Lng: -98.930597),  Route carried "on" structure: Business State highway 40B,  Year Built: 1959,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,520 (year 2040),  Design Load: H 20,  Features Intersected: TURTLE CREEK,  Facility Carried by Structure: I-40 BUS. EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.758,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $963,000,  Roadway Improvement Cost: $1,588,000,  Total Project Cost: $2,695,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14432,  Location: 7.0 MI NE WASHITA C/L (Lat: 35.480278,  Lng: -99.025000),  Route carried "on" structure: County highway N2231,  Year Built: 1959,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 175 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 280 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: PARKERSBURG RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.183,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14448,  Location: 9.0 MI NE WASHITA C/L (Lat: 35.495556,  Lng: -98.993889),  Route carried "on" structure: County highway 3021,  Year Built: 1959,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 2,240 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: SOUTH 28TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.497,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 33.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14455,  Location: EB OFF-RAMP CLINTON KMART (Lat: 35.497222,  Lng: -98.985278),  Route carried "on" structure: Business State highway 40B,  Year Built: 1959,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,800 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: I-40 BUS.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.42m (24.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $952,000,  Roadway Improvement Cost: $1,571,000,  Total Project Cost: $2,665,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 14477,  Location: 9.2 MI NE WASHITA C/L (Lat: 35.496511,  Lng: -98.990969),  Route carried "on" structure: Interstate 40,  Year Built: 1959,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 9,250 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 14,800 (year 2040),  Design Load: HS 20,  Features Intersected: FMRC RR & RED WHEAT DR.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 23.797,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,133,000,  Roadway Improvement Cost: $3,519,000,  Total Project Cost: $5,972,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14478,  Location: 9.2 MI NE WASHITA C/L (Lat: 35.496153,  Lng: -98.991017),  Route carried "on" structure: Interstate 40,  Year Built: 1959,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 9,550 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 15,280 (year 2040),  Design Load: HS 20,  Features Intersected: FMRC RR & RED WHEAT DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.797,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,133,000,  Roadway Improvement Cost: $3,519,000,  Total Project Cost: $5,972,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15016,  Location: CLINTON &183 1N 2.5W (Lat: 35.539308,  Lng: -99.010208),  Route carried "on" structure: County highway E1020,  Year Built: 1960,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: BARNITZ CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $386,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15027,  Location: 3.7 MI E JCT I-40 BUS (Lat: 35.517008,  Lng: -98.846064),  Route carried "on" structure: Interstate 40,  Year Built: 1960,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 23,000 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 36,800 (year 2040),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.613,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $803,000,  Roadway Improvement Cost: $1,325,000,  Total Project Cost: $2,248,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 15139,  Location: 0.7 MI E JCT I-40 BUS (Lat: 35.515833,  Lng: -98.905833),  Route carried "on" structure: County highway N2300,  Year Built: 1960,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: TRAVIS DAIRY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15143,  Location: 4.3 MI E JCT I-40 BUS (Lat: 35.520000,  Lng: -98.834722),  Route carried "on" structure: County highway N2330,  Year Built: 1960,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 101 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 162 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: NS 233 CO. RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.691,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15162,  Location: 2.3 MI E JCT I-40 BUS. (Lat: 35.515833,  Lng: -98.870278),  Route carried "on" structure: County highway 2003,  Year Built: 1960,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,680 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: CUSTER CITY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.410,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17344,  Location: 4.8 MI E JCT S.H. 44 (Lat: 35.508672,  Lng: -99.090536),  Route carried "on" structure: State highway 73,  Year Built: 1968,  Status: Open,  Structure Length: 7.97m (26.15ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,760 (year 2040),  Design Load: HS 20,  Features Intersected: WASHITA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.578,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.38m (34.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $826,000,  Roadway Improvement Cost: $1,364,000,  Total Project Cost: $2,314,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17389,  Location: 0.8 MI E JCT I-40 BUS. (Lat: 35.499947,  Lng: -98.970794),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 18,900 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 30,240 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.670,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17391,  Location: 0.7 MI E JCT U.S. 183 (Lat: 35.499833,  Lng: -98.951764),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 19,900 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 31,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.424,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 90.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $407,000,  Total Project Cost: $691,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17493,  Location: 0.3 MI E JCT U.S. 183 (Lat: 35.500000,  Lng: -98.958611),  Route carried "on" structure: County highway N2270,  Year Built: 1969,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 125 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 20,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: GLENN SMITH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.778,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $995,000,  Total Project Cost: $1,689,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17504,  Location: SOUTH EDGE CLINTON (Lat: 35.500278,  Lng: -98.964722),  Route carried "on" structure: US 183,  Year Built: 1969,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,600 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,760 (year 2040),  Design Load: HS 20,  Features Intersected: I-40 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.134,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $924,000,  Roadway Improvement Cost: $1,524,000,  Total Project Cost: $2,586,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 17505,  Location: SOUTH EDGE CLINTON (Lat: 35.500278,  Lng: -98.964722),  Route carried "on" structure: US 183,  Year Built: 1969,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,700 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,920 (year 2040),  Design Load: HS 20,  Features Intersected: I-40 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.134,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $924,000,  Roadway Improvement Cost: $1,524,000,  Total Project Cost: $2,586,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 17512,  Location: 2.8 MI E JCT U.S. 183 (Lat: 35.513675,  Lng: -98.918872),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 9,950 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 15,920 (year 2040),  Design Load: HS 20,  Features Intersected: I-40 BUS. EB UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.802,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,137,000,  Roadway Improvement Cost: $1,876,000,  Total Project Cost: $3,184,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 17524,  Location: 2.5 MI E JCT U.S. 183 (Lat: 35.511389,  Lng: -98.923611),  Route carried "on" structure: County highway N2298,  Year Built: 1969,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: H 15,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: TURTLE CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.303,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.70m (31.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $1,286,000,  Total Project Cost: $2,183,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17528,  Location: 2.8 MI E JCT U.S. 183 (Lat: 35.513778,  Lng: -98.919431),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 9,750 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 15,600 (year 2040),  Design Load: HS 20,  Features Intersected: I-40 BUS. EB UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.802,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,137,000,  Roadway Improvement Cost: $1,876,000,  Total Project Cost: $3,184,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 1758,  Location: 9.0 MI E JCT S.H. 44 (Lat: 35.508594,  Lng: -99.016464),  Route carried "on" structure: State highway 73,  Year Built: 1969,  Status: Open,  Structure Length: 9.97m (32.71ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,760 (year 2040),  Design Load: HS 20,  Features Intersected: WASHITA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.272,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.67m (38.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $914,000,  Roadway Improvement Cost: $1,508,000,  Total Project Cost: $2,560,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17581,  Location: SOUTH EDGE CLINTON (Lat: 35.498833,  Lng: -98.977194),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 9,450 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 15,120 (year 2040),  Design Load: HS 20,  Features Intersected: GNBC R.R. & NEPTUNE DR.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 25.894,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.15m (49.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,694,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,657,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 17582,  Location: SOUTH EDGE CLINTON (Lat: 35.499192,  Lng: -98.976917),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 9,250 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 14,800 (year 2040),  Design Load: HS 20,  Features Intersected: GNBC R.R. & NEPTUNE DR.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 16.090,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.15m (49.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,694,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,657,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 17597,  Location: 1.3 MI E JCT US 183 (Lat: 35.502431,  Lng: -98.943019),  Route carried "on" structure: Interstate 40,  Year Built: 1969,  Status: Open,  Structure Length: 18.38m (60.30ft),  Average Daily Traffic: 9,950 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 15,920 (year 2040),  Design Load: HS 20,  Features Intersected: WASHITA RIV.& CO. RD UND
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 31.022,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.38m (60.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,346,000,  Roadway Improvement Cost: $3,871,000,  Total Project Cost: $6,568,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1973,  Location: 1.7 MI N JCT I-40 BUS. (Lat: 35.536683,  Lng: -98.967028),  Route carried "on" structure: US 183,  Year Built: 1980,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 5,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,640 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.366,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 20281,  Location: 1.4 MI N SH 73 (Lat: 35.528586,  Lng: -98.993778),  Route carried "on" structure: County highway 2022,  Year Built: 1982,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 640 (year 2040),  Design Load: HS 20,  Features Intersected: WASHITA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $585,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous