Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Camden, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 88Number of bridges
  • 3,494ft / 1,065mTotal length
  • $163,079,000Total costs
  • 2,853,316Total average daily traffic
  • 196,626Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Camden
  • No street view available for this location

New bridges in Camden, NJ - historical statistics
  • New bridges - historical statistics
  • 31900-1909
  • 21910-1919
  • 81920-1929
  • 21940-1949
  • 201950-1959
  • 71960-1969
  • 321970-1979
  • 91980-1989
  • 21990-1999
  • 32010-2019
Reconstructed bridges in Camden, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 11970-1979
  • 01980-1989
  • 31990-1999
  • 62000-2009
  • 22010-2019
Average Bridge Daily Traffic in Camden, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Excellent
  • 2.3%Very good
  • 43.2%Good
  • 36.4%Satisfactory
  • 9.1%Fair
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.3%Excellent
  • 10.9%Very good
  • 26.1%Good
  • 45.7%Satisfactory
  • 13.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.3%Very good
  • 26.1%Good
  • 58.7%Satisfactory
  • 8.7%Fair
  • 2.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 64.3%Good
  • 7.1%Satisfactory
Find on map >>   Show street view

Structure Number: 45516,  Location: 0.34 mi South of CR603 (Lat: 39.916931,  Lng: -75.119739),  Route carried "on" structure: County highway 551,  Year Built: 1904,  Year Reconstructed: 1945,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 3,868 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,720 (year 2041),  Features Intersected: VINELAND SECONDARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.288,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,148,000,  Roadway Improvement Cost: $3,678,000,  Total Project Cost: $6,253,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 4500001,  Location: 2 MILES WEST OF US 130 (Lat: 39.842311,  Lng: -75.384931),  Route carried "on" structure: US 322,  Year Built: 1974,  Status: Open,  Structure Length: 424.13m (1391.50ft),  Average Daily Traffic: 39,131 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,747 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DELAWARE RIVER
Minimum Vertical Clearance: 4.46m (14.63ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: Local Toll Authority,  Approaching Roadway Width: 18.3m (60.0ft),  Navigation Control: Yes ( Vertical Clearance: 56.7m (186.0ft), Horizontal Clearance: 243.8m (799.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 74,  Length of Maximum Span: 501.1m (1,644.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 424.10m (1391.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $88,128,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $106,000,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4500004,  Location: 1.0 MI E OF WW BRIDGE (Lat: 39.901600,  Lng: -75.110569),  Route carried "on" structure: Ramp Interstate 76,  Year Built: 1957,  Status: Open,  Structure Length: 28.35m (93.01ft),  Average Daily Traffic: 7,900 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,700 (year 2040),  Design Load: HS 20,  Features Intersected: I-676,  Facility Carried by Structure: RAMP BW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 4500005,  Location: 2.75 MI E OF WW BRIDGE (Lat: 39.901219,  Lng: -75.098219),  Route carried "on" structure: Ramp Interstate 76,  Year Built: 1957,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 15,830 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,315 (year 2040),  Design Load: HS 20,  Features Intersected: CRESCENT BLVD (US 130),  Facility Carried by Structure: RAMPS BE-BW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 76,  Subroute: 37),  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 4500007,  Location: 0.75 MI E OF WW BRIDGE (Lat: 39.902600,  Lng: -75.112150),  Route carried "on" structure: Ramp Interstate 76,  Year Built: 1957,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,100 (year 2040),  Design Load: HS 20,  Features Intersected: COLLINGS AVENUE (CR 630),  Facility Carried by Structure: RAMP FB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 4500008,  Location: 0.75 MI E OF WW BRIDGE (Lat: 39.902731,  Lng: -75.115661),  Route carried "on" structure: Ramp Interstate 76,  Year Built: 1957,  Status: Open,  Structure Length: 57.73m (189.40ft),  Average Daily Traffic: 8,065 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,900 (year 2040),  Design Load: HS 20,  Features Intersected: I-76 & I-676,  Facility Carried by Structure: RAMP BE
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 1.674,  Lanes on structure: 3,  Lanes under structure: 13,  Base Highway Network: Yes,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 450001,  Location: CITY OF CAMDEN (Lat: 39.953761,  Lng: -75.140681),  Route carried "on" structure: Interstate 676,  Year Built: 1926,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 249.02m (816.99ft),  Average Daily Traffic: 104,658 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 127,703 (year 2040),  Features Intersected: DEL RIV,I-95,RR&ROADS
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 7.355,  Lanes on structure: 7,  Lanes under structure: 28,  Toll: Toll bridge,  Owner: Local Toll Authority,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 39.3m (128.9ft), Horizontal Clearance: 243.8m (799.9ft)),  Material/Design: Steel,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 87,  Length of Maximum Span: 533.4m (1,750.0ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 23.7m (77.8ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 252.80m (829.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,932,000,  Roadway Improvement Cost: $5,693,000,  Total Project Cost: $26,095,000 ( Estimate for 2040),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 406156,  Location: 0.63 MI S OF 30-537 JCT (Lat: 39.938761,  Lng: -75.093111),  Route carried "under" structure: US 30,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 87,080 (year 2020),  Truck Traffic: 4%,  Features Intersected: US 30,  Facility Carried by Structure: BAIRD BLVD(CO 608)
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 4.007,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 406159,  Location: 0.6 MI.E.BEN FRANKLIN BR. (Lat: 39.943331,  Lng: -75.106669),  Route carried "under" structure: Ramp US 30,  Year Built: 1925,  Structure Length: 0. m,  Average Daily Traffic: 3,513 (year 2021),  Truck Traffic: 1%,  Features Intersected: US RTE 30,SERVICE ROADS,  Facility Carried by Structure: FEDERALST (RT 537)
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 406159,  Location: 0.6 MI.E.BEN FRANKLIN BR. (Lat: 39.943331,  Lng: -75.106669),  Route carried "under" structure: ServiceCity street ,  Year Built: 1925,  Structure Length: 0. m,  Average Daily Traffic: 3,513 (year 2021),  Truck Traffic: 1%,  Features Intersected: US RTE 30,SERVICE ROADS,  Facility Carried by Structure: FEDERALST (RT 537)
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 406159,  Location: 0.6 MI.E.BEN FRANKLIN BR. (Lat: 39.943331,  Lng: -75.106669),  Route carried "under" structure: US 30,  Year Built: 1925,  Structure Length: 0. m,  Average Daily Traffic: 94,272 (year 2021),  Truck Traffic: 4%,  Features Intersected: US RTE 30,SERVICE ROADS,  Facility Carried by Structure: FEDERALST (RT 537)
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 406161,  Location: 0.15 MI S OF CO 537 (Lat: 39.942000,  Lng: -75.105769),  Route carried "under" structure: US 30,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 95,860 (year 2020),  Truck Traffic: 4%,  Features Intersected: US 30,  Facility Carried by Structure: FLANDERS AVENUE
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 2.816,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 41815,  Location: AT I-676 & I-76 JCT (Lat: 39.902089,  Lng: -75.111431),  Route carried "under" structure: Interstate 676,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 32,295 (year 2021),  Truck Traffic: 9%,  Features Intersected: I-676NB,  Facility Carried by Structure: CR 630
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 418151,  Location: .2MI NORTH OF NEWTON CR (Lat: 39.902500,  Lng: -75.113061),  Route carried "under" structure: Interstate 676,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 32,290 (year 2021),  Truck Traffic: 9%,  Features Intersected: I-676 SB,  Facility Carried by Structure: CR 630
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 418155,  Location: 1.14 MI NORTH OF I-76 JCT (Lat: 39.912389,  Lng: -75.115639),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 7,502 (year 2020),  Truck Traffic: 4%,  Features Intersected: MORGAN BLVD.,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.338,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 418156,  Location: 1.51 M NORTH OF I-76 (Lat: 39.916731,  Lng: -75.116169),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 1,726 (year 2020),  Truck Traffic: 3%,  Features Intersected: CHELTON AVENUE & CONRAIL,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 7.09m (23.26ft),  Kilometerpoint: 0.435,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 418157,  Location: 1.73 MILES N OF I-76 JCT (Lat: 39.921161,  Lng: -75.116039),  Route carried "under" structure: County highway 603,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 4,381 (year 2020),  Truck Traffic: 4%,  Features Intersected: FERRY AVENUE (CR 603),  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 1.287,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 418158,  Location: 1.87 MILES NORTH OF I-76 (Lat: 39.923361,  Lng: -75.115939),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 3,225 (year 2020),  Truck Traffic: 3%,  Features Intersected: CARL MILLER BLVD,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.966,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 41816,  Location: 1.23 MILES SOUTH OF US 30 (Lat: 39.928969,  Lng: -75.115100),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 7,047 (year 2020),  Truck Traffic: 3%,  Features Intersected: ATLANTIC AVENUE,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.143,  Lanes on structure: 7,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 418161,  Location: 1MI SOUTH OF RT 30 (Lat: 39.930981,  Lng: -75.113500),  Route carried "under" structure: County highway 607,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2021),  Truck Traffic: 4%,  Features Intersected: CITY STS,RAMP TO KAIGHNS,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 2.543,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 418161,  Location: 1MI SOUTH OF RT 30 (Lat: 39.930981,  Lng: -75.113500),  Route carried "under" structure: Ramp Interstate 676,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,280 (year 2021),  Truck Traffic: 3%,  Features Intersected: CITY STS,RAMP TO KAIGHNS
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 2.478,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 418161,  Location: 1MI SOUTH OF RT 30 (Lat: 39.930981,  Lng: -75.113500),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2021),  Truck Traffic: 3%,  Features Intersected: CITY STS,RAMP TO KAIGHNS,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 418161,  Location: 1MI SOUTH OF RT 30 (Lat: 39.930981,  Lng: -75.113500),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2021),  Truck Traffic: 3%,  Features Intersected: CITY STS,RAMP TO KAIGHNS,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 418161,  Location: 1MI SOUTH OF RT 30 (Lat: 39.930981,  Lng: -75.113500),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2021),  Truck Traffic: 3%,  Features Intersected: CITY STS,RAMP TO KAIGHNS,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.692,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 418161,  Location: 1MI SOUTH OF RT 30 (Lat: 39.930981,  Lng: -75.113500),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,200 (year 2021),  Truck Traffic: 3%,  Features Intersected: CITY STS,RAMP TO KAIGHNS,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.191,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 43015,  Location: .62 MI SOUTH OF US 30 (Lat: 39.936961,  Lng: -75.111711),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,855 (year 2020),  Truck Traffic: 3%,  Features Intersected: PINE STREET,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 430151,  Location: 0.54 MILES S OF US 30 JCT (Lat: 39.937881,  Lng: -75.111919),  Route carried "under" structure: County highway 561,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 8,143 (year 2020),  Truck Traffic: 4%,  Features Intersected: HADDON AVE (CR 561),  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 81.417,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 430152,  Location: .4MI SOUTH OF US 30 (Lat: 39.939961,  Lng: -75.112550),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 6,097 (year 2020),  Truck Traffic: 4%,  Features Intersected: NEWTON AVE,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.064,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 430162,  Location: .22 MILES SOUTH OF US 30 (Lat: 39.942469,  Lng: -75.113211),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 10,945 (year 2020),  Truck Traffic: 3%,  Features Intersected: MLK BLVD & NJT,  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 430164,  Location: 0.41S of CR. 561 (Lat: 39.943869,  Lng: -75.113439),  Route carried "under" structure: County highway 537,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 12,828 (year 2020),  Truck Traffic: 4%,  Features Intersected: FEDERAL&MARKET ST(CR537),  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 1.304,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 430164,  Location: 0.41S of CR. 561 (Lat: 39.943869,  Lng: -75.113439),  Route carried "under" structure: Spur County highway 537S,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 12,828 (year 2020),  Truck Traffic: 4%,  Features Intersected: FEDERAL&MARKET ST(CR537),  Facility Carried by Structure: I-676
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.435,  Lanes on structure: 7,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 430165,  Location: 0.05 MI. EAST OF I-676JCT (Lat: 39.945139,  Lng: -75.113019),  Route carried "under" structure: Ramp US 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 10,478 (year 2020),  Truck Traffic: 4%,  Features Intersected: US30 & RAMPS FROM 7TH ST,  Facility Carried by Structure: 10TH STREET
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 2.028,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 430165,  Location: 0.05 MI. EAST OF I-676JCT (Lat: 39.945139,  Lng: -75.113019),  Route carried "under" structure: Ramp US 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 9,271 (year 2020),  Truck Traffic: 4%,  Features Intersected: US30 & RAMPS FROM 7TH ST,  Facility Carried by Structure: 10TH STREET
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 2.028,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 430165,  Location: 0.05 MI. EAST OF I-676JCT (Lat: 39.945139,  Lng: -75.113019),  Route carried "under" structure: US 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 60,404 (year 2020),  Truck Traffic: 4%,  Features Intersected: US30 & RAMPS FROM 7TH ST,  Facility Carried by Structure: 10TH STREET
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 2.028,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 430166,  Location: 1.3mile S of Ben Franklin (Lat: 39.945369,  Lng: -75.113669),  Route carried "under" structure: US 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 59,810 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 30 AND RAMPS C&LE,  Facility Carried by Structure: I-676 NB
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 1.947,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 430166,  Location: 1.3mile S of Ben Franklin (Lat: 39.945369,  Lng: -75.113669),  Route carried "under" structure: Ramp State highway 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 5,565 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 30 AND RAMPS C&LE,  Facility Carried by Structure: I-676 NB
Minimum Vertical Clearance: 6.81m (22.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 430166,  Location: 1.3mile S of Ben Franklin (Lat: 39.945369,  Lng: -75.113669),  Route carried "under" structure: Ramp State highway 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 148 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 30 AND RAMPS C&LE,  Facility Carried by Structure: I-676 NB
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 430167,  Location: 1.2 MI EAST OF DELAWARE R (Lat: 39.945981,  Lng: -75.114889),  Route carried "under" structure: Ramp US 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2020),  Truck Traffic: 4%,  Features Intersected: RAMPS C & LE,  Facility Carried by Structure: I-676 SB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 2.157,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 430168,  Location: 1.06 MI. S OF PA ST LINE (Lat: 39.946650,  Lng: -75.116350),  Route carried "under" structure: Interstate 676,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 77,901 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-676 AND US 30,  Facility Carried by Structure: NORTH 7TH STREET
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 5.938,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 430168,  Location: 1.06 MI. S OF PA ST LINE (Lat: 39.946650,  Lng: -75.116350),  Route carried "under" structure: US 30,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 61,692 (year 2020),  Truck Traffic: 4%,  Features Intersected: I-676 AND US 30,  Facility Carried by Structure: NORTH 7TH STREET
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.706,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 450162,  Location: 2.0MI NE OF US38&I676 JCT (Lat: 39.959161,  Lng: -75.080419),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 16 (year 2021),  Truck Traffic: 1%,  Features Intersected: BRDNTWN SCNDRY, NJT, RD,  Facility Carried by Structure: 36TH ST (CR 611)
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 45516,  Location: 0.34 mi South of CR603 (Lat: 39.916931,  Lng: -75.119739),  Route carried "under" structure: Other road ,  Year Built: 1904,  Structure Length: 0. m,  Average Daily Traffic: 6 (year 2021),  Truck Traffic: 1%,  Features Intersected: VINELAND SECONDARY,  Facility Carried by Structure: BROADWAY (CR 551)
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 9.8m (32.2ft)

Find on map >>   Show street view

Structure Number: 4500004,  Location: 1.0 MI E OF WW BRIDGE (Lat: 39.901600,  Lng: -75.110569),  Route carried "under" structure: Interstate 676,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 70,370 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-676,  Facility Carried by Structure: RAMP BW
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 4500005,  Location: 2.75 MI E OF WW BRIDGE (Lat: 39.901219,  Lng: -75.098219),  Route carried "under" structure: US 130,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 48,300 (year 2018),  Truck Traffic: 4%,  Features Intersected: CRESCENT BLVD (US 130),  Facility Carried by Structure: RAMPS BE-BW
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 45.271,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 4500007,  Location: 0.75 MI E OF WW BRIDGE (Lat: 39.902600,  Lng: -75.112150),  Route carried "under" structure: County highway 630,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2020),  Truck Traffic: 3%,  Features Intersected: COLLINGS AVENUE (CR 630),  Facility Carried by Structure: RAMP FB
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.515,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 4500008,  Location: 0.75 MI E OF WW BRIDGE (Lat: 39.902731,  Lng: -75.115661),  Route carried "under" structure: Interstate 76,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 110,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-76 & I-676,  Facility Carried by Structure: RAMP BE
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 3.557,  Lanes on structure: 3,  Lanes under structure: 10,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 4500008,  Location: 0.75 MI E OF WW BRIDGE (Lat: 39.902731,  Lng: -75.115661),  Route carried "under" structure: Interstate 676,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 67,500 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-76 & I-676,  Facility Carried by Structure: RAMP BE
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.354,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 450001,  Location: CITY OF CAMDEN (Lat: 39.953761,  Lng: -75.140681),  Route carried "under" structure: City street ,  Year Built: 1926,  Structure Length: 0. m,  Average Daily Traffic: 1,312 (year 2020),  Truck Traffic: 1%,  Features Intersected: DEL RIV,I-95,RR&ROADS,  Facility Carried by Structure: I676,US30,PATCO
Minimum Vertical Clearance: 4.17m (13.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 18,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 533.4m (1,750.0ft)

Find on map >>   Show street view

Structure Number: 450001,  Location: CITY OF CAMDEN (Lat: 39.953761,  Lng: -75.140681),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1926,  Structure Length: 0. m,  Average Daily Traffic: 76,641 (year 2020),  Truck Traffic: 4%,  Features Intersected: DEL RIV,I-95,RR&ROADS,  Facility Carried by Structure: I676,US30,PATCO
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 533.4m (1,750.0ft)

Discuss Camden, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.