- Plumbing sys: maintained, backflow device instal
- Floors,walls,ceilings (physical facilities):design, maintained, good repair, Outer openings protect
|
12/15/2015 |
- Warewashing: Sanitize at ppm/temp
- Floors,walls,ceilings (physical facilities):design, maintained, good repair, Outer openings protect
|
9/30/2015 |
No violation noted during this evaluation. | 3/3/2015 |
No violation noted during this evaluation. | 12/16/2014 |
- Plumbing sys: maintained, backflow device instal
|
9/30/2014 |
No violation noted during this evaluation. | 2/25/2014 |
No violation noted during this evaluation. | 9/10/2013 |
No violation noted during this evaluation. | 1/8/2013 |
- Food & non-food contact surfaces cleanable, design
- Toliet facilities: accessible, properly constructed, cleaned Self closures
- Floors,walls,ceilings (physical facilities):design, maintained, good repair, Outer openings protect
|
8/14/2012 |
- Floors,walls,ceilings (physical facilities):design, maintained, good repair, Outer openings protect
|
4/10/2012 |
No violation noted during this evaluation. | 10/11/2011 |
No violation noted during this evaluation. | 4/12/2011 |
- Floors, walls, ceilings in good repair, clean, constructed properly.
|
10/5/2010 |
- Floors, walls, ceilings in good repair, clean, constructed properly.
|
4/20/2010 |
- Floors, walls, ceilings in good repair, clean, constructed properly.
|
11/17/2009 |
Restaurant representatives - add corrected or new information about Lane Public School, 601 W. Mcgee Creek Rd., Lane, OK 74555 »