Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wareham, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 469ft / 143mTotal length
  • $101,452,000Total costs
  • 858,575Total average daily traffic
  • 27,612Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wareham
  • No street view available for this location

New bridges in Wareham, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 11910-1919
  • 31920-1929
  • 11930-1939
  • 11940-1949
  • 231960-1969
  • 131970-1979
  • 61980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Wareham, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21920-1929
  • 11930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Wareham, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.9%Good
  • 26.3%Satisfactory
  • 15.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Good
  • 41.0%Satisfactory
  • 20.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.6%Very good
  • 61.5%Good
  • 25.6%Satisfactory
  • 5.1%Fair
  • 2.6%Poor
  • 2.6%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.5%Very good
  • 52.4%Good
  • 28.6%Satisfactory
  • 4.8%Fair
  • 4.8%Poor
Find on map >>   Show street view

Structure Number: W0600145JDOTNBI,  Location: .1 MI E OF MAIN ST (Lat: 41.756817,  Lng: -70.712450),  Route carried "on" structure: US 6,  Year Built: 1992,  Status: Open,  Structure Length: 5.77m (18.93ft),  Average Daily Traffic: 28,100 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 64,751 (year 2032),  Design Load: HS 20,  Features Intersected: WATER WAREHAM RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.426,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.2m (66.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $2,735,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $4,103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W06002BP0MUNNBI,  Location: .2M NW OF MAIN ST. (Lat: 41.779958,  Lng: -70.763067),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 775 (year 2021),  Design Load: HL 93,  Features Intersected: WATER WEWEANTIC RIVER,  Facility Carried by Structure: HWY PAPER MLL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W060034AMDOTNBI,  Location: 0.5 M E OF ROCHESTER TL (Lat: 41.798508,  Lng: -70.763561),  Route carried "on" structure: State highway 28,  Year Built: 1923,  Year Reconstructed: 1932,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 20,300 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.943,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $157,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06004448MUNNBI,  Location: .8 MI SE OF ROCHESTER (Lat: 41.791167,  Lng: -70.764222),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 3,600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,843 (year 2032),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $289,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W0600642EMUNNBI,  Location: JUST N OF HORSESHOE POND (Lat: 41.770064,  Lng: -70.754408),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1930,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,142 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,265 (year 2032),  Features Intersected: WATER WEWEANTIC RIVER,  Facility Carried by Structure: HWY FEARING HILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Underwater Inspection Date: October 2019,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $1,216,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,825,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W060084C4DOT634,  Location: .6 MI E OF COUNTY RD (Lat: 41.791256,  Lng: -70.769764),  Route carried "on" structure: City street ,  Year Built: 1887,  Year Reconstructed: 1996,  Status: Closed,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 390 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,527 (year 2032),  Design Load: HS 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY PIERCEVLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 7.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 11 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $898,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W060094C5DOT634,  Location: .3 MI N OF PAPERMILL RD (Lat: 41.782256,  Lng: -70.758169),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 3,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,843 (year 2033),  Design Load: HS 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $1,054,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W060114C6DOT634,  Location: 0.7 M S OF RTE 195 (Lat: 41.767144,  Lng: -70.729694),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 26,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 37,114 (year 2033),  Design Load: HS 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.426,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Cathodic Protection
Find on map >>   Show street view

Structure Number: W060144A0DOTNBI,  Location: 0.5 MI W OF RTE 6 & 28 (Lat: 41.742567,  Lng: -70.653664),  Route carried "on" structure: City street ,  Year Built: 1914,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 13,500 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,321 (year 2031),  Features Intersected: WATER EAST RIVER,  Facility Carried by Structure: HWY ONSET AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,831,000,  Roadway Improvement Cost: $484,000,  Total Project Cost: $7,247,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W060154C3DOT634,  Location: MACRR MP 53.98 (Lat: 41.748661,  Lng: -70.627294),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 4,866 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,056 (year 2031),  Design Load: HS 20,  Features Intersected: RR MACRR,  Facility Carried by Structure: HWY ONSET AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $740,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,111,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W0601645KDOTNBI,  Location: 2 MI E OF RTE 105 (Lat: 41.738628,  Lng: -70.746083),  Route carried "on" structure: US 6,  Year Built: 1929,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 4.52m (14.83ft),  Average Daily Traffic: 9,600 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.097,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.5m (44.3ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.7m (51.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $7,774,000,  Roadway Improvement Cost: $778,000,  Total Project Cost: $11,662,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06017AW9MUNNBI,  Location: .7 MI SW OF RTE 6 (Lat: 41.747867,  Lng: -70.656122),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 7,700 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,161 (year 2031),  Design Load: HS 20,  Features Intersected: WATER EAST RIVER,  Facility Carried by Structure: HWY MAIN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.3m (109.3ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $595,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W0601845HDOTNBI,  Location: 1.3 M E OF NARROWS RD (Lat: 41.763517,  Lng: -70.688728),  Route carried "on" structure: US 6,  Year Built: 1930,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 9,210 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,425 (year 2031),  Design Load: H 20,  Features Intersected: WATER AGAWAM RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.151,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $964,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W060194ALDOTNBI,  Location: 1 MI S OF RTE 195 (Lat: 41.767628,  Lng: -70.722758),  Route carried "on" structure: State highway 28,  Year Built: 1924,  Year Reconstructed: 1932,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 12,400 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,220 (year 2031),  Design Load: H 20,  Features Intersected: WATER PARKER MILL POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.874,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2020,  Underwater Inspection Date: Febuary 2019,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $961,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W060294AEDOTNBI,  Location: .2 MI W OF DEPOT ST (Lat: 41.761431,  Lng: -70.677289),  Route carried "on" structure: US 6,  Year Built: 1949,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 21,400 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 45,800 (year 2031),  Design Load: H 20,  Features Intersected: WATER AGAWAM RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.189,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 38.5m (126.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $241,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0603349PDOTNBI,  Location: .4 M N OF RTE 28 (Lat: 41.806306,  Lng: -70.769511),  Route carried "on" structure: State highway 58,  Year Built: 1964,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 20,301 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,848 (year 2032),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,301,000,  Roadway Improvement Cost: $431,000,  Total Project Cost: $6,452,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0603446BDOTNBI,  Location: 0.5 M S OF RTE 58 (Lat: 41.800803,  Lng: -70.761114),  Route carried "on" structure: Interstate 495,  Year Built: 1964,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 23,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,840,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0603446CDOTNBI,  Location: 0.5 M S OF RTE 58 (Lat: 41.800550,  Lng: -70.761431),  Route carried "on" structure: Interstate 495,  Year Built: 1964,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 25,800 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.716,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,840,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W060354AHDOTNBI,  Location: 0.2 M N OF RTE 6 & 28 WB (Lat: 41.765008,  Lng: -70.671375),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 5,825 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,846 (year 2032),  Design Load: H 20,  Features Intersected: ST 25,  Facility Carried by Structure: HWY GLEN CHRL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,639,000,  Roadway Improvement Cost: $464,000,  Total Project Cost: $6,959,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06036465DOTNBI,  Location: .1 M W OF GLEN CHARLIE RD (Lat: 41.765753,  Lng: -70.674711),  Route carried "on" structure: State highway 25,  Year Built: 1981,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 29,152 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 49,669 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MILL POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.391,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 61.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $620,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Cathodic Protection
Find on map >>   Show street view

Structure Number: W06036466DOTNBI,  Location: .1 M W OF GLEN CHARLIE RD (Lat: 41.766106,  Lng: -70.674528),  Route carried "on" structure: State highway 25,  Year Built: 1987,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 34,531 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 49,669 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MILL POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.391,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $646,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Cathodic Protection
Find on map >>   Show street view

Structure Number: W060374AJDOTNBI,  Location: 1.5 M E OF CHARGE PND RD (Lat: 41.767758,  Lng: -70.680444),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 9,100 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,477 (year 2032),  Design Load: H 20,  Features Intersected: ST 25,  Facility Carried by Structure: HWY MAPLE SPRING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,442,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $3,664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W060384BDDOTNBI,  Location: 0.7 M E OF ELM ST (Lat: 41.776244,  Lng: -70.707358),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 1,100 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,106 (year 2032),  Design Load: H 20,  Features Intersected: ST 25,  Facility Carried by Structure: HWY CHRGE PND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $7,628,000,  Roadway Improvement Cost: $763,000,  Total Project Cost: $11,443,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06039467DOTNBI,  Location: 1.0 M S OF RTE 195 (Lat: 41.779578,  Lng: -70.718981),  Route carried "on" structure: State highway 25,  Year Built: 1967,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 29,152 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 49,748 (year 2032),  Design Load: H 20,  Features Intersected: WATER WAKINCO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $1,411,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $2,117,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06039468DOTNBI,  Location: 1.0 M S OF RTE 195 (Lat: 41.780000,  Lng: -70.718992),  Route carried "on" structure: State highway 25,  Year Built: 1967,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 34,531 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 49,748 (year 2032),  Design Load: H 20,  Features Intersected: WATER WAKINCO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $425,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W060404ADDOTNBI,  Location: 0.7 M E OF RTE 195 (Lat: 41.780006,  Lng: -70.719719),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 1,000 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,264 (year 2032),  Design Load: H 20,  Features Intersected: ST 25,  Facility Carried by Structure: HWY TIHONET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,269,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $4,904,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06041469DOTNBI,  Location: 1.5 M S OF RTE 58 (Lat: 41.792503,  Lng: -70.748292),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 23,001 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: HS 20,  Features Intersected: HWY CHARLOTTE FURNC RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $425,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0604146ADOTNBI,  Location: 1.5 M S OF RTE 58 (Lat: 41.792206,  Lng: -70.748536),  Route carried "on" structure: Interstate 495,  Year Built: 1967,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 25,730 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: HS 20,  Features Intersected: HWY CHARLOTTE FURNC RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $425,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06043487DOTNBI,  Location: AT 195 / 495: TO 495 NB (Lat: 41.783858,  Lng: -70.732033),  Route carried "on" structure: Interstate 195,  Year Built: 1967,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 6,512 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,005 (year 2032),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.604,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,264,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $3,397,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06043488DOTNBI,  Location: AT 195 / 495 TO 195 WB (Lat: 41.783994,  Lng: -70.732439),  Route carried "on" structure: Interstate 195,  Year Built: 1967,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 10,570 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,479 (year 2032),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.604,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,096,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $4,645,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06048485DOTNBI,  Location: 1.5 M E OF RTE 105 (Lat: 41.742950,  Lng: -70.761403),  Route carried "on" structure: Interstate 195,  Year Built: 1970,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 18,402 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 43,905 (year 2032),  Design Load: H 20,  Features Intersected: WATER COHACKET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.498,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06048486DOTNBI,  Location: 1.5 M E OF RTE 105 (Lat: 41.743189,  Lng: -70.761733),  Route carried "on" structure: Interstate 195,  Year Built: 1970,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 18,324 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 43,905 (year 2032),  Design Load: H 20,  Features Intersected: WATER COHACKET BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.498,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W06049489DOTNBI,  Location: 1.8 M E OF RTE 105 (Lat: 41.746347,  Lng: -70.756544),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,211 (year 2032),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY BARLOW AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,317,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $4,976,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0605048ADOTNBI,  Location: 3.3 M E OF RTE 105 (Lat: 41.764594,  Lng: -70.744611),  Route carried "on" structure: Interstate 195,  Year Built: 1971,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 18,324 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 44,694 (year 2032),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.475,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $604,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0605048BDOTNBI,  Location: 3.3 M E OF RTE 105 (Lat: 41.764231,  Lng: -70.743794),  Route carried "on" structure: Interstate 195,  Year Built: 1971,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 18,402 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 44,694 (year 2032),  Design Load: H 20,  Features Intersected: WATER WEWEANTIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.475,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $271,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0605148CDOTNBI,  Location: 3.5 M E OF RTE 105 (Lat: 41.767919,  Lng: -70.743778),  Route carried "on" structure: Interstate 195,  Year Built: 1970,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 19,307 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 44,694 (year 2032),  Design Load: H 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.232,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $118,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $178,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W0605148DDOTNBI,  Location: 3.5 M E OF RTE 105 (Lat: 41.767664,  Lng: -70.743150),  Route carried "on" structure: Interstate 195,  Year Built: 1970,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 18,402 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 44,694 (year 2032),  Design Load: H 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.232,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $108,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $163,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Wareham, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.