Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Verona, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 417ft / 127mTotal length
  • $50,464,000Total costs
  • 246,374Total average daily traffic
  • 20,229Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Verona
  • No street view available for this location

New bridges in Verona, NY - historical statistics
  • New bridges - historical statistics
  • 4Before 1900
  • 21900-1909
  • 11910-1919
  • 61920-1929
  • 41930-1939
  • 11940-1949
  • 231950-1959
  • 31960-1969
  • 11970-1979
  • 11980-1989
  • 51990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Verona, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 21990-1999
  • 02000-2009
  • 72010-2019
Average Bridge Daily Traffic in Verona, NY
Average Bridge Truck Traffic in Verona, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.6%Excellent
  • 11.4%Very good
  • 8.6%Good
  • 20.0%Satisfactory
  • 37.1%Fair
  • 11.4%Poor
  • 2.9%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 13.9%Very good
  • 11.1%Good
  • 16.7%Satisfactory
  • 27.8%Fair
  • 19.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 11.1%Very good
  • 13.9%Good
  • 22.2%Satisfactory
  • 27.8%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.1%Excellent
  • 10.3%Very good
  • 23.1%Good
  • 30.8%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 27.3%Good
  • 36.4%Satisfactory
  • 18.2%Fair
  • 18.2%Serious
Find on map >>   Show street view

Structure Number: 102199,  Location: 0.2 MI E JCT RTS 31 & 316 (Lat: 43.154378,  Lng: -75.718094),  Route carried "on" structure: State highway 31,  Year Built: 2013,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 4,264 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,290 (year 2040),  Design Load: HL 93,  Features Intersected: ONEIDA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: June 2012,  Bridge Improvement Cost: $1,120,000,  Roadway Improvement Cost: $656,000,  Total Project Cost: $1,776,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1022,  Location: 01MI EJCT RTS 31+46 (Lat: 43.148347,  Lng: -75.674819),  Route carried "on" structure: State highway 31,  Year Built: 1960,  Status: Posted for load-capacity,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,119 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,144 (year 2040),  Design Load: HS 20,  Features Intersected: OLD ERIE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.765,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 73.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: October 2017,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $281,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102201,  Location: 27MI E JCT RTS 31+46 (Lat: 43.139075,  Lng: -75.624325),  Route carried "on" structure: State highway 31,  Year Built: 1932,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 4,119 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,144 (year 2040),  Design Load: H 20,  Features Intersected: BRANDY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.013,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $629,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102202,  Location: 07MI W JCT RTS 365+31 (Lat: 43.134386,  Lng: -75.590822),  Route carried "on" structure: State highway 31,  Year Built: 1932,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 4,119 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,144 (year 2040),  Design Load: H 15,  Features Intersected: STONY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.845,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $407,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 102203,  Location: 06MI W JCT RTS 365+31 (Lat: 43.134044,  Lng: -75.588642),  Route carried "on" structure: State highway 31,  Year Built: 1937,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,119 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,144 (year 2040),  Design Load: H 20,  Features Intersected: STONY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.022,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $298,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102204,  Location: 0.5 MI W JCT RTS 365 & 31 (Lat: 43.133797,  Lng: -75.586772),  Route carried "on" structure: State highway 31,  Year Built: 1990,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 4,119 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,003 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.166,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,088,000,  Roadway Improvement Cost: $637,000,  Total Project Cost: $1,726,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10257,  Location: 1.7 MI E JCT RTS 46 & 49 (Lat: 43.218578,  Lng: -75.558250),  Route carried "on" structure: State highway 46,  Year Built: 1991,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 4,947 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,977 (year 2040),  Design Load: HS 20,  Features Intersected: STONEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.991,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $392,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $621,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104226,  Location: 04MI S JCT RTS 234+365 (Lat: 43.124681,  Lng: -75.573964),  Route carried "on" structure: State highway 31,  Year Built: 1954,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 4,327 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,513 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.663,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,277,000,  Roadway Improvement Cost: $748,000,  Total Project Cost: $2,025,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1046709,  Location: .3 MI S JCT SH234 & SH365 (Lat: 43.124125,  Lng: -75.589325),  Route carried "on" structure: State highway 365,  Year Built: 1954,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 15,996 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,071 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX EB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.500,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.94m (22.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,604,000,  Roadway Improvement Cost: $2,110,000,  Total Project Cost: $5,714,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220611,  Location: 2 MI SE STATE BRIDGE (Lat: 43.129514,  Lng: -75.645442),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 222 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 311 (year 2036),  Design Load: H 15,  Features Intersected: BRANDY BROOK,  Facility Carried by Structure: FOSTER CORNERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $253,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220613,  Location: 4 MI N OF VERONA (Lat: 43.188431,  Lng: -75.562789),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 106 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 148 (year 2036),  Features Intersected: STONY CREEK,  Facility Carried by Structure: WEHLING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $283,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220614,  Location: 1 MI.W.JCT.90 & 26 (Lat: 43.147244,  Lng: -75.528314),  Route carried "on" structure: Other road ,  Year Built: 1972,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 82 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 115 (year 2037),  Features Intersected: MUD CREEK,  Facility Carried by Structure: CR50 REBER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $136,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220616,  Location: AT VERONA (Lat: 43.140194,  Lng: -75.525639),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 82 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 115 (year 2037),  Design Load: HS 20,  Features Intersected: BRANCH MUD CREEK,  Facility Carried by Structure: REBER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $259,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220617,  Location: 1.5 MI SE STATE BRIDGE (Lat: 43.127703,  Lng: -75.660181),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 461 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 645 (year 2036),  Design Load: HS 20,  Features Intersected: BRANDY BROOK,  Facility Carried by Structure: FOSTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $180,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220618,  Location: .2 MI NW OF DURHAMVILLE (Lat: 43.131428,  Lng: -75.681553),  Route carried "on" structure: Other road ,  Year Built: 1906,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 267 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 374 (year 2036),  Design Load: HL 93,  Features Intersected: BRANDY BROOK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $363,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 226656,  Location: .25 MI S OF I90 IN VERONA (Lat: 43.108742,  Lng: -75.650317),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 729 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,021 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: CR 48
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.42m (17.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,562,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 226839,  Location: 2 MI SW STATE BRIDGE (Lat: 43.139789,  Lng: -75.706644),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 81 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 113 (year 2038),  Design Load: H 20,  Features Intersected: ONEIDA CREEK OVERFLOW,  Facility Carried by Structure: SWALLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $120,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331098,  Location: .5 MI E VERONA BEACH ST P (Lat: 43.171408,  Lng: -75.705436),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,014 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,420 (year 2037),  Design Load: H 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: POPPLETON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $205,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331099,  Location: 3 MI NW STATE BRIDGE (Lat: 43.174975,  Lng: -75.722242),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,014 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,420 (year 2037),  Design Load: H 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: POPPLETON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $502,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331121,  Location: 4 MI SE JCT SH 49 & SH 46 (Lat: 43.196792,  Lng: -75.556308),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 233 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 326 (year 2036),  Features Intersected: STONY CREEK,  Facility Carried by Structure: CR 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $379,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331122,  Location: 2.5 MI SE OF NEW LONDON (Lat: 43.174214,  Lng: -75.559667),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,392 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,949 (year 2038),  Features Intersected: BRANCH OF STONY CREEK,  Facility Carried by Structure: CR52 BLACKMAN CORN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $454,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331123,  Location: 2.0 MI SE OF NEW LONDON (Lat: 43.181611,  Lng: -75.566886),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,392 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,949 (year 2038),  Design Load: H 20,  Features Intersected: STONY CREEK,  Facility Carried by Structure: CR52 BLACKMAN CORN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.624,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $506,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331124,  Location: 3 MI SW JCT RTS 365 & 26 (Lat: 43.154836,  Lng: -75.543550),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,125 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,575 (year 2037),  Features Intersected: MUD CREEK,  Facility Carried by Structure: CR52 BLACKMAN CORN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.212,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $220,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331125,  Location: 6 MI NW OF VERONA (Lat: 43.202278,  Lng: -75.552497),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 409 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 573 (year 2029),  Design Load: H 20,  Features Intersected: STONY CREEK,  Facility Carried by Structure: CR60A STONEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $562,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331126,  Location: VERONA (Lat: 43.160561,  Lng: -75.543608),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 337 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 472 (year 2036),  Features Intersected: MUD CREEK,  Facility Carried by Structure: CR83 ONEIDA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $202,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331128,  Location: VERONA (Lat: 43.151883,  Lng: -75.581719),  Route carried "on" structure: Other road ,  Year Built: 1953,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 205 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 287 (year 2039),  Design Load: HL 93,  Features Intersected: STONY CREEK,  Facility Carried by Structure: DWYER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.363,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 90.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $373,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 401062,  Location: 2.4 MI.S.JCT.RTES.13+49 (Lat: 43.195414,  Lng: -75.728542),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 13.59m (44.59ft),  Average Daily Traffic: 7,045 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,349 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ACCESS ROAD, BARGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 28.0m (91.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 73.1m (239.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.59m (44.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,546,000,  Roadway Improvement Cost: $1,491,000,  Total Project Cost: $4,036,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 402569,  Location: NORTH OF NEW LONDON (Lat: 43.207981,  Lng: -75.592492),  Route carried "on" structure: State highway 46,  Year Built: 1959,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 3,230 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,369 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE CANAL TRAIL, ERIE B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.741,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 13.1m (43.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Excellent,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.75m (31.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $1,655,000,  Roadway Improvement Cost: $969,000,  Total Project Cost: $2,624,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 442608,  Location: 3.3 MI.E.SH 13 & CANAL (Lat: 43.206106,  Lng: -75.670194),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 7.06m (23.16ft),  Average Daily Traffic: 1,232 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,725 (year 2027),  Design Load: HL 93,  Features Intersected: Mud road or clearing use,  Facility Carried by Structure: HIGGINSVILLE ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 5.841,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 6.1m (20.0ft), Horizontal Clearance: 31.7m (104.0ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 70.1m (230.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.06m (23.16ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2012,  Bridge Improvement Cost: $1,557,000,  Roadway Improvement Cost: $912,000,  Total Project Cost: $2,469,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 442627,  Location: 1.2 MI E SH 13 & BG CANAL (Lat: 43.204189,  Lng: -75.711039),  Route carried "on" structure: Other road ,  Year Built: 1918,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 31 (year 2014),  Average Future Daily Traffic: 43 (year 2034),  Design Load: HL 93,  Features Intersected: WOOD CREEK,  Facility Carried by Structure: COVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $434,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 442634,  Location: IN NEW LONDON (Lat: 43.205472,  Lng: -75.587144),  Route carried "on" structure: County highway ,  Year Built: 1865,  Year Reconstructed: 1925,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,132 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,585 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: CR50 MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $264,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442635,  Location: 1.4 MI.S.W.OF NEW LONDON (Lat: 43.200939,  Lng: -75.611933),  Route carried "on" structure: Other road ,  Year Built: 1927,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 124 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 174 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: LOCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $257,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442636,  Location: 2 MI SW OF NEW LONDON (Lat: 43.194039,  Lng: -75.620611),  Route carried "on" structure: County highway ,  Year Built: 1865,  Year Reconstructed: 1925,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 282 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 395 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: CR52 SENN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.443,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $254,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442637,  Location: 3 MI.S.W.OF NEW LONDON (Lat: 43.185478,  Lng: -75.631128),  Route carried "on" structure: Other road ,  Year Built: 1927,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 232 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 325 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: COLLINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.464,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $297,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442638,  Location: 5 MI EAST OF SYLVAN BEACH (Lat: 43.176933,  Lng: -75.646467),  Route carried "on" structure: Other road ,  Year Built: 1865,  Year Reconstructed: 1925,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 74 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 104 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: HIGGINSVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $234,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442639,  Location: 4.3 MI.S.W.OF NEW LONDON (Lat: 43.171306,  Lng: -75.648483),  Route carried "on" structure: Other road ,  Year Built: 1865,  Year Reconstructed: 1927,  Status: Posted for load-capacity,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 720 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,008 (year 2038),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: GERMANY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $339,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 44264,  Location: 5 MI S.W. OF NEW LONDON (Lat: 43.162389,  Lng: -75.661306),  Route carried "on" structure: Other road ,  Year Built: 1927,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 55 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 77 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: DUNBARTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $323,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 442641,  Location: 5.6 MI S.W.OF NEW LONDON (Lat: 43.156225,  Lng: -75.670358),  Route carried "on" structure: Other road ,  Year Built: 1927,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 368 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 515 (year 2037),  Features Intersected: OLD ERIE CANAL,  Facility Carried by Structure: MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $339,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Verona, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.