Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sumter, South Carolina (SC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 51Number of bridges
  • 591ft / 180mTotal length
  • $9,555,000Total costs
  • 412,525Total average daily traffic
  • 28,863Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sumter
  • No street view available for this location

New bridges in Sumter, SC - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 51940-1949
  • 101950-1959
  • 41960-1969
  • 61970-1979
  • 31980-1989
  • 131990-1999
  • 42000-2009
  • 52010-2019
Reconstructed bridges in Sumter, SC - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 11960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Sumter, SC
Average Bridge Truck Traffic in Sumter, SC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 58.3%Good
  • 16.7%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 52.8%Good
  • 5.6%Satisfactory
  • 16.7%Fair
  • 13.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 33.3%Good
  • 19.4%Satisfactory
  • 11.1%Fair
  • 13.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 53.3%Very good
  • 10.0%Good
  • 30.0%Satisfactory
  • 6.7%Fair
Find on map >>   Show street view

Structure Number: 703,  Location: 2 MI S OF SUMTER (Lat: 33.875717,  Lng: -80.352372),  Route carried "on" structure: US 15,  Year Built: 1935,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 5.13m (16.83ft),  Average Daily Traffic: 9,750 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,727 (year 2040),  Design Load: H 15,  Features Intersected: POCOTALIGO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.278,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.06m (19.88ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $663,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $995,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1153,  Location: TOWN OF SUMTER (Lat: 33.914447,  Lng: -80.341883),  Route carried "on" structure: State highway 152,  Year Built: 1940,  Status: Posted for load,  Structure Length: 22.04m (72.31ft),  Average Daily Traffic: 5,300 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,049 (year 2040),  Design Load: H 15,  Features Intersected: RR CSXT & DIVINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.967,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 22.76m (74.67ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,492,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $3,738,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1228,  Location: 6 MI NW OF SUMTER (Lat: 33.961533,  Lng: -80.426614),  Route carried "on" structure: US 76,  Year Built: 1941,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 25,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,733 (year 2040),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.455,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 31.7m (104.0ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 1229,  Location: 4 MI NW OF SUMTER (Lat: 33.957269,  Lng: -80.393111),  Route carried "on" structure: US 76,  Year Built: 1941,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 26,400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,216 (year 2040),  Design Load: H 15,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.903,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 34.1m (111.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.06m (6.76ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $390,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1566,  Location: TOWN OF SUMTER (Lat: 33.920722,  Lng: -80.328253),  Route carried "on" structure: Business US 76,  Year Built: 1948,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,141 (year 2040),  Design Load: H 15,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.308,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 2267,  Location: 1 MI NW OF SUMTER (Lat: 33.925819,  Lng: -80.366350),  Route carried "on" structure: State highway 119,  Year Built: 1955,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 950 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: H 10,  Features Intersected: SHOT PORCH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2625,  Location: 3 MI NW OF SUMTER (Lat: 33.957214,  Lng: -80.379800),  Route carried "on" structure: US 76,  Year Built: 2013,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 12,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 13,952 (year 2040),  Design Load: HL 93,  Features Intersected: U.S. 521
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.357,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2626,  Location: TOWN OF SUMTER (Lat: 33.945736,  Lng: -80.342586),  Route carried "on" structure: US 76,  Year Built: 1957,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 12,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 13,952 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.929,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 18.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $1,161,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2853,  Location: TOWN OF SUMTER (Lat: 33.945561,  Lng: -80.340678),  Route carried "on" structure: US 76,  Year Built: 1958,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 11,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,535 (year 2040),  Design Load: HS 20,  Features Intersected: RR SCL ABANDONED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.085,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $59,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2854,  Location: TOWN OF SUMTER (Lat: 33.937058,  Lng: -80.319586),  Route carried "on" structure: US 76,  Year Built: 1958,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 11,700 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,753 (year 2040),  Design Load: HS 20,  Features Intersected: US 401
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.470,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $65,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2855,  Location: 2 MI E OF SUMTER (Lat: 33.931392,  Lng: -80.311372),  Route carried "on" structure: US 76,  Year Built: 1958,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 11,700 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,753 (year 2040),  Design Load: HS 20,  Features Intersected: S-43-307 & RR CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.405,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2856,  Location: TOWN OF SUMTER (Lat: 33.928594,  Lng: -80.307133),  Route carried "on" structure: US 76,  Year Built: 1958,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 11,700 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,753 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 76 BUSINESS
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 31.810,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.44m (21.13ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $814,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $1,221,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3537,  Location: 2 MI NW OF SUMTER (Lat: 33.934975,  Lng: -80.364483),  Route carried "on" structure: State highway 55,  Year Built: 1960,  Year Reconstructed: 1967,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 8,500 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,305 (year 2040),  Design Load: H 10,  Features Intersected: SHOT POUCH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.582,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Very good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.06m (6.76ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $390,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3543,  Location: 4 MI NW OF SUMTER (Lat: 33.951108,  Lng: -80.394281),  Route carried "on" structure: State highway 1074,  Year Built: 1984,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,000 (year 2040),  Design Load: H 20,  Features Intersected: GREEN SWAMP BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.208,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 4221,  Location: TOWN OF SUMTER (Lat: 33.917622,  Lng: -80.336219),  Route carried "on" structure: US 15,  Year Built: 2016,  Status: Open,  Structure Length: 26.12m (85.70ft),  Average Daily Traffic: 13,600 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,384 (year 2040),  Design Load: HL 93,  Features Intersected: S-43-114/1269 & RR CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.247,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.12m (85.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4429,  Location: TOWN OF SUMTER (Lat: 33.917444,  Lng: -80.381625),  Route carried "on" structure: State highway 120,  Year Built: 1964,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 22,400 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,456 (year 2040),  Design Load: HS 20,  Features Intersected: SECOND MILL POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.796,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4669,  Location: 2 MI SW OF SUMTER (Lat: 33.908656,  Lng: -80.381022),  Route carried "on" structure: State highway 120,  Year Built: 1965,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 19,300 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,317 (year 2040),  Design Load: HS 20,  Features Intersected: RR CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.876,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.1m (75.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4671,  Location: 5 MI NW OF SUMTER (Lat: 33.971072,  Lng: -80.401614),  Route carried "on" structure: State highway 673,  Year Built: 2007,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,400 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,182 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.806,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5393,  Location: 2 MI W OF SUMTER (Lat: 33.916814,  Lng: -80.380944),  Route carried "on" structure: County highway 4301,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 225 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 288 (year 2040),  Design Load: H 10,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.222,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5866,  Location: 3 MI NW OF SUMTER (Lat: 33.937386,  Lng: -80.395983),  Route carried "on" structure: State highway 380,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 8,800 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,704 (year 2040),  Design Load: H 10,  Features Intersected: GREEN SWAMP BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.749,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $486,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5867,  Location: TOWN OF SUMTER (Lat: 33.942708,  Lng: -80.362869),  Route carried "on" structure: State highway 601,  Year Built: 2006,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHOT POUCH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.336,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6017,  Location: 4 MI SW OF SUMTER (Lat: 33.878289,  Lng: -80.391431),  Route carried "on" structure: State highway 120,  Year Built: 1971,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 6,400 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,512 (year 2040),  Design Load: HS 20,  Features Intersected: CANE SAVANNAH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.063,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6194,  Location: TOWN OF SUMTER (Lat: 33.911819,  Lng: -80.328822),  Route carried "on" structure: State highway 101,  Year Built: 2017,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,059 (year 2040),  Design Load: HL 93,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.529,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6195,  Location: TOWN OF SUMTER (Lat: 33.916175,  Lng: -80.329278),  Route carried "on" structure: State highway 114,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,792 (year 2040),  Design Load: H 10,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.763,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $387,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6196,  Location: 5 MI SW OF SUMTER (Lat: 33.878253,  Lng: -80.404503),  Route carried "on" structure: State highway 528,  Year Built: 1972,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,950 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,438 (year 2040),  Design Load: H 10,  Features Intersected: CANE SAVANNAH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.079,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6197,  Location: 4 MI NW OF SUMTER (Lat: 33.947108,  Lng: -80.403172),  Route carried "on" structure: State highway 692,  Year Built: 2008,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 5,700 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,125 (year 2040),  Design Load: HL 93,  Features Intersected: MUSH SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.613,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6585,  Location: 2 MI S OF SUMTER (Lat: 33.888108,  Lng: -80.356844),  Route carried "on" structure: State highway 522,  Year Built: 1974,  Status: Posted for load,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 3,900 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,875 (year 2040),  Design Load: H 10,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.096,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6942,  Location: 2 MI SW OF SUMTER (Lat: 33.907761,  Lng: -80.365075),  Route carried "on" structure: State highway 33,  Year Built: 2003,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 9,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,375 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.053,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 704,  Location: 1 MI NW OF SUMTER (Lat: 33.928511,  Lng: -80.366094),  Route carried "on" structure: US 521,  Year Built: 1977,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,215 (year 2040),  Design Load: H 20,  Features Intersected: SHOT POUCH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.367,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 7519,  Location: CITY OF SUMTER (Lat: 33.906067,  Lng: -80.353900),  Route carried "on" structure: US 521,  Year Built: 1981,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 19,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,248 (year 2040),  Design Load: HS 20,  Features Intersected: RR CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.598,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.22m (20.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7954,  Location: 6 MI N SUMTER (Lat: 34.012561,  Lng: -80.356208),  Route carried "on" structure: State highway 92,  Year Built: 1985,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,752 (year 2040),  Design Load: HS 20,  Features Intersected: LEE SWAMP NO. 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.520,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8399,  Location: 2 MI NW OF SUMTER (Lat: 33.950756,  Lng: -80.362761),  Route carried "on" structure: State highway 269,  Year Built: 1990,  Status: Open,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 4,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,453 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: US76/378&S-43-1428,1429
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.011,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.12m (33.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84,  Location: 6 MI NW OF SUMTER (Lat: 33.985956,  Lng: -80.414825),  Route carried "on" structure: State highway 1322,  Year Built: 1990,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2040),  Design Load: HS 20,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.866,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8697,  Location: 2 MI W OF SUMTER (Lat: 33.914375,  Lng: -80.370472),  Route carried "on" structure: State highway 227,  Year Built: 1993,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,875 (year 2040),  Design Load: HS 20,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.077,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $123,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8798,  Location: 2 MI W OF SUMTER (Lat: 33.916800,  Lng: -80.380947),  Route carried "on" structure: County highway 4301,  Year Built: 1994,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 225 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 288 (year 2040),  Design Load: HS 20,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 9094,  Location: 6 MI N SUMTER (Lat: 34.013047,  Lng: -80.332236),  Route carried "on" structure: State highway 105,  Year Built: 1996,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 700 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,848 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ROCKY BLUFF SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.355,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9282,  Location: 3 MI SW OF SUMTER (Lat: 33.878903,  Lng: -80.366100),  Route carried "on" structure: State highway 25,  Year Built: 1997,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 6,200 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,750 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CANE SAVANNAH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.150,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9283,  Location: 5 MI NW OF SUMTER (Lat: 33.947919,  Lng: -80.420914),  Route carried "on" structure: State highway 204,  Year Built: 1997,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,000 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BLUFFHEAD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.801,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Sumter, South Carolina (SC) on our hugely popular South Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.