  • National Bridge Inventory (NBI) Statistics
  • 58Number of bridges
  • 771ft / 235mTotal length
  • $65,537,000Total costs
  • 361,915Total average daily traffic
  • 72,718Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Coweta
  • No street view available for this location

New bridges in Coweta, OK - historical statistics
  • New bridges - historical statistics
  • 71930-1939
  • 41940-1949
  • 21950-1959
  • 201960-1969
  • 21970-1979
  • 11980-1989
  • 101990-1999
  • 102000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Coweta, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Coweta, OK
Average Bridge Truck Traffic in Coweta, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.9%Excellent
  • 5.7%Very good
  • 54.3%Good
  • 25.7%Satisfactory
  • 8.6%Fair
  • 2.9%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.9%Excellent
  • 22.9%Very good
  • 37.1%Good
  • 17.1%Satisfactory
  • 17.1%Fair
  • 2.9%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.9%Excellent
  • 11.4%Very good
  • 42.9%Good
  • 20.0%Satisfactory
  • 14.3%Fair
  • 2.9%Poor
  • 2.9%Serious
  • 2.9%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.3%Excellent
  • 22.0%Very good
  • 22.0%Good
  • 36.6%Satisfactory
  • 9.8%Fair
  • 2.4%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 33.3%Good
  • 40.0%Satisfactory
  • 6.7%Fair
Find on map >>   Show street view

Structure Number: 3278,  Location: 7.2 MI E JCT SH-50 (Lat: 36.802750,  Lng: -98.993517),  Route carried "on" structure: US 64,  Year Built: 1931,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,240 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 4624,  Location: VASSAR RD & 44TH ST .1S (Lat: 36.071200,  Lng: -97.264783),  Route carried "on" structure: County highway N3220,  Year Built: 1936,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.0m (26.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $256,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 4629,  Location: 4.5 SOUTH OF OLIVE (Lat: 35.964628,  Lng: -96.476644),  Route carried "on" structure: County highway N3670,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.860,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $236,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 463,  Location: .8E 2S OF US 59 (Lat: 35.958253,  Lng: -94.570131),  Route carried "on" structure: County highway 134C,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 413 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 661 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SHELL BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.539,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4631,  Location: 1W OF SHAMROCK (Lat: 35.904997,  Lng: -96.601967),  Route carried "on" structure: County highway N3600,  Year Built: 1936,  Year Reconstructed: 1950,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: June 2020,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $230,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 4634,  Location: 4.3S 1W OF STILWELL (Lat: 35.748694,  Lng: -94.648322),  Route carried "on" structure: County highway N4700,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: DOG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5989,  Location: 2. S 1.8 W FT TOWSON (Lat: 33.982925,  Lng: -95.315036),  Route carried "on" structure: County highway E2090,  Year Built: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6254,  Location: 4.1E TULSA CL; ON 131ST (Lat: 35.973625,  Lng: -95.690094),  Route carried "on" structure: County highway 7358C,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 350 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 560 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 30.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $294,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9582,  Location: 2.6 N & 1 W OF VAMOOSA (Lat: 35.024214,  Lng: -96.687633),  Route carried "on" structure: County highway N3550,  Year Built: 1941,  Status: Temporarily open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Serious,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.66m (8.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 966,  Location: 8.6 MI SE TULSA CO (Lat: 35.970708,  Lng: -95.659725),  Route carried "on" structure: State highway 51,  Year Built: 1941,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.803,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 9804,  Location: 2. N 6.5 W OF HOBART (Lat: 35.058619,  Lng: -99.210703),  Route carried "on" structure: County highway E1350,  Year Built: 1941,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $423,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 10676,  Location: 0.7W TULSA C/L ON 141ST (Lat: 35.959094,  Lng: -95.749739),  Route carried "on" structure: County highway 7328,  Year Built: 1990,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 779 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,246 (year 2040),  Design Load: HS 20,  Features Intersected: SAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 10724,  Location: 4.2E.TULSA C/L ON 141ST (Lat: 35.959033,  Lng: -95.685989),  Route carried "on" structure: County highway 7328,  Year Built: 1990,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.758,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.94m (26.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $630,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13306,  Location: 3.3 MI E JCT SH-72 (Lat: 35.951586,  Lng: -95.595969),  Route carried "on" structure: State highway 51,  Year Built: 1955,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,120 (year 2040),  Design Load: HS 20,  Features Intersected: FIFE CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.441,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13312,  Location: 4.7 MI E JCT SH-72 (Lat: 35.951639,  Lng: -95.569969),  Route carried "on" structure: State highway 51,  Year Built: 1955,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 9,900 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 15,840 (year 2040),  Design Load: HS 20,  Features Intersected: GAR CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.964,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1531,  Location: 4 MI E OK C/L (Lat: 35.383206,  Lng: -97.071372),  Route carried "on" structure: County highway N3330,  Year Built: 1961,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 15,  Features Intersected: I-40 UNDER,  Facility Carried by Structure: CO. RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.420,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $802,000,  Total Project Cost: $1,361,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16391,  Location: 0.5N SH51 W OF MUSK TRNPK (Lat: 35.958944,  Lng: -95.592225),  Route carried "on" structure: County highway E0730,  Year Built: 1965,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17107,  Location: T.P NO 11.32 (Lat: 35.970508,  Lng: -95.596561),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 19,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 31,680 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: MUSKOGEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.021,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 35.1m (115.2ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17145,  Location: 8.4 MI S-E TULSA C/L (Lat: 35.996800,  Lng: -95.634550),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 19,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 31,680 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: MUSKOGEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.515,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 37.5m (123.0ft),  Out-to-Out Width: 38.1m (125.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17209,  Location: 11.93 MI'S SE JCT SH51 (Lat: 35.962981,  Lng: -95.591333),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 19,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 31,680 (year 2040),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: MUSKOGEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.985,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $787,000,  Roadway Improvement Cost: $1,181,000,  Total Project Cost: $2,250,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17212,  Location: 15.36 MI'S SE JCT SH51 (Lat: 35.921000,  Lng: -95.565628),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 16,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 26,880 (year 2040),  Design Load: HS 20,  Features Intersected: GAR CREEK,  Facility Carried by Structure: MUSKOGEE TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.619,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $779,000,  Roadway Improvement Cost: $1,169,000,  Total Project Cost: $2,226,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17239,  Location: 5.96 MI'S SE JCT SH 51 (Lat: 36.015794,  Lng: -95.673564),  Route carried "on" structure: County highway N4120,  Year Built: 1968,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.333,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $824,000,  Total Project Cost: $1,575,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17242,  Location: 12.2 MI'S SE JCT SH 51 (Lat: 35.959028,  Lng: -95.590050),  Route carried "on" structure: County highway E0730,  Year Built: 1968,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.468,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $840,000,  Total Project Cost: $1,606,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17243,  Location: 13.21 MI'S SE JCT SH51 (Lat: 35.944567,  Lng: -95.588697),  Route carried "on" structure: County highway E0740,  Year Built: 1968,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.078,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $840,000,  Total Project Cost: $1,606,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17278,  Location: 8.37 MI'S SE JCT SH 51 (Lat: 35.997883,  Lng: -95.636619),  Route carried "on" structure: County highway N4140,  Year Built: 1968,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.193,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $936,000,  Total Project Cost: $1,787,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1728,  Location: 14.22 MI'S SE JCT SH51 (Lat: 35.931092,  Lng: -95.581350),  Route carried "on" structure: County highway N4170,  Year Built: 1968,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.848,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $936,000,  Total Project Cost: $1,787,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17288,  Location: 7.19 MI'S SE JCT SH 51 (Lat: 36.006617,  Lng: -95.654625),  Route carried "on" structure: County highway N4130,  Year Built: 1968,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 176 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.264,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $936,000,  Total Project Cost: $1,787,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17318,  Location: 10.96 MI'S SE JCT SH51 (Lat: 35.974142,  Lng: -95.600861),  Route carried "on" structure: County highway N4160,  Year Built: 1968,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: MUSKOGEE TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.378,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $731,000,  Roadway Improvement Cost: $1,097,000,  Total Project Cost: $2,091,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18848,  Location: 0.1E SH51; 0.1N 121ST ST. (Lat: 35.988175,  Lng: -95.668978),  Route carried "on" structure: County highway E0709,  Year Built: 1975,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 320 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: S274TH E ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 19638,  Location: 4.6 MI N MUSKOGEE CO (Lat: 35.917494,  Lng: -95.657464),  Route carried "on" structure: State highway 72,  Year Built: 1979,  Status: Open,  Structure Length: 51.88m (170.21ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,120 (year 2040),  Design Load: HS 20,  Features Intersected: ARKANSAS RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 11.705,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 51.88m (170.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,297,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,239,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 20093,  Location: 0.2 MI W SH 51 ON 131ST (Lat: 35.973611,  Lng: -95.664217),  Route carried "on" structure: County highway 7358C,  Year Built: 1982,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,495 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,392 (year 2040),  Features Intersected: COWETA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.459,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22497,  Location: 0.5W COWETA ON E. 146 ST. (Lat: 35.951292,  Lng: -95.658322),  Route carried "on" structure: County highway E0736,  Year Built: 1990,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2040),  Features Intersected: COWETA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22853,  Location: 7.0 MI E JCT SH-72 (Lat: 35.952097,  Lng: -95.529750),  Route carried "on" structure: State highway 51,  Year Built: 1991,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 5,050 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,080 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.841,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 7300014H,  Subroute: 39),  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $643,000,  Roadway Improvement Cost: $1,060,000,  Total Project Cost: $1,799,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22946,  Location: 6.4 M E JCT SH-72 (Lat: 35.952086,  Lng: -95.540053),  Route carried "on" structure: State highway 51,  Year Built: 1991,  Status: Open,  Structure Length: 18.32m (60.10ft),  Average Daily Traffic: 5,050 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,080 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.314,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 7300014H,  Subroute: 39),  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.32m (60.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $2,223,000,  Total Project Cost: $3,772,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22951,  Location: 7.3 MI E JCT SH-72 (Lat: 35.952100,  Lng: -95.525172),  Route carried "on" structure: State highway 51,  Year Built: 1991,  Status: Open,  Structure Length: 25.94m (85.10ft),  Average Daily Traffic: 5,050 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,080 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.488,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 7300014H,  Subroute: 39),  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.94m (85.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,817,000,  Roadway Improvement Cost: $2,997,000,  Total Project Cost: $5,086,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23039,  Location: 7.0 MI E JCT SH-72 (Lat: 35.951733,  Lng: -95.529750),  Route carried "on" structure: State highway 51,  Year Built: 1992,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 4,950 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,920 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.841,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $643,000,  Roadway Improvement Cost: $1,060,000,  Total Project Cost: $1,799,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2519,  Location: 0.2 MI N JCT US 64 (Lat: 36.752097,  Lng: -101.493075),  Route carried "on" structure: State highway 136,  Year Built: 2001,  Status: Open,  Structure Length: 12.04m (39.50ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,920 (year 2040),  Design Load: HL 93,  Features Intersected: BIG GOFF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.90m (42.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $996,000,  Roadway Improvement Cost: $1,644,000,  Total Project Cost: $2,790,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 252,  Location: 0.6 MI E OF MINGO RD (Lat: 35.973761,  Lng: -95.858331),  Route carried "on" structure: County highway 8100,  Year Built: 1997,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 4,003 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,405 (year 2040),  Design Load: HS 20,  Features Intersected: HAIKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.367,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $480,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25368,  Location: 5.4 MI E JCT SH-72 (Lat: 35.952042,  Lng: -95.557125),  Route carried "on" structure: State highway 51,  Year Built: 2001,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 5,050 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,080 (year 2040),  Design Load: HL 93,  Features Intersected: GAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.853,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 7300014H,  Subroute: 39),  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $667,000,  Roadway Improvement Cost: $1,101,000,  Total Project Cost: $1,869,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Coweta, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.