Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Shandaken, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 70Number of bridges
  • 728ft / 222mTotal length
  • $146,483,000Total costs
  • 62,544Total average daily traffic
  • 4,187Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shandaken
  • No street view available for this location

New bridges in Shandaken, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 41930-1939
  • 71950-1959
  • 111960-1969
  • 31970-1979
  • 71980-1989
  • 191990-1999
  • 52000-2009
  • 102010-2019
  • 22020-2022
Reconstructed bridges in Shandaken, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 51980-1989
  • 11990-1999
  • 82000-2009
  • 32010-2019
Average Bridge Daily Traffic in Shandaken, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Excellent
  • 10.0%Very good
  • 31.7%Good
  • 28.3%Satisfactory
  • 15.0%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 13.3%Very good
  • 23.3%Good
  • 21.7%Satisfactory
  • 15.0%Fair
  • 15.0%Poor
  • 1.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 11.7%Very good
  • 15.0%Good
  • 35.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Very good
  • 13.4%Good
  • 37.3%Satisfactory
  • 28.4%Fair
  • 14.9%Poor
  • 1.5%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Satisfactory
  • 28.6%Fair
  • 28.6%Poor
Find on map >>   Show street view

Structure Number: 101878,  Location: 0.2 MI N JCT RTS 214 & 28 (Lat: 42.082803,  Lng: -74.315756),  Route carried "on" structure: State highway 214,  Year Built: 1993,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 1,257 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,311 (year 2040),  Design Load: HS 20,  Features Intersected: STONY CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.6m (93.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $608,000,  Total Project Cost: $1,647,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101965,  Location: 3.2 MI W JCT SH28 & SH214 (Lat: 42.112700,  Lng: -74.358622),  Route carried "on" structure: State highway 28,  Year Built: 1962,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 3,811 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,847 (year 2040),  Design Load: HS 20,  Features Intersected: BROAD ST HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.588,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $1,244,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101966,  Location: 3.5 MI W JCT RTS 28+214 (Lat: 42.114692,  Lng: -74.363711),  Route carried "on" structure: State highway 28,  Year Built: 1964,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,811 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,847 (year 2040),  Design Load: HS 20,  Features Intersected: SHANDAKEN TUNNEL OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.071,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,196,000,  Roadway Improvement Cost: $700,000,  Total Project Cost: $1,896,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101967,  Location: 0.8 MI E JCT RTS 28+42 (Lat: 42.117861,  Lng: -74.378050),  Route carried "on" structure: State highway 28,  Year Built: 1964,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 3,811 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,847 (year 2040),  Design Load: HS 20,  Features Intersected: PECK HOLLOW STRM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.309,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,425,000,  Roadway Improvement Cost: $835,000,  Total Project Cost: $2,260,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 101968,  Location: 0.2 MI W JCT RTS 28+42 (Lat: 42.118939,  Lng: -74.396739),  Route carried "on" structure: State highway 28,  Year Built: 2016,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 3,328 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,359 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ESOPUS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.822,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,839,000,  Roadway Improvement Cost: $2,834,000,  Total Project Cost: $7,673,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10197,  Location: 2.5 MI W JCT RTS 28+42 (Lat: 42.104064,  Lng: -74.446172),  Route carried "on" structure: State highway 28,  Year Built: 2018,  Status: Open,  Structure Length: 30.51m (100.10ft),  Average Daily Traffic: 3,190 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,220 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK, ESOPUS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.874,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.51m (100.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $14,623,000,  Roadway Improvement Cost: $8,563,000,  Total Project Cost: $23,185,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101971,  Location: 3.5 MI W JCT SH 28 & SH42 (Lat: 42.114556,  Lng: -74.455167),  Route carried "on" structure: State highway 28,  Year Built: 1958,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,190 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,220 (year 2040),  Design Load: HS 20,  Features Intersected: ROCHESTER HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.242,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Fair,  Culverts: Poor,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $601,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101972,  Location: 4 MI W JCT SH 28 & SH 42 (Lat: 42.121633,  Lng: -74.461325),  Route carried "on" structure: State highway 28,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,677 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,703 (year 2037),  Design Load: HS 20,  Features Intersected: TRIBUTARY TO BIRCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.223,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $403,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101973,  Location: 5.5 MI W JCT SH 28 & SH42 (Lat: 42.135817,  Lng: -74.479269),  Route carried "on" structure: State highway 28,  Year Built: 1998,  Status: Open,  Structure Length: 17.77m (58.30ft),  Average Daily Traffic: 3,190 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,220 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ACADEMY STREET, BIRCH CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.251,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.8m (202.8ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.76m (58.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $12,570,000,  Roadway Improvement Cost: $7,361,000,  Total Project Cost: $19,931,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102515,  Location: .4 MI N JCT SH 42 & SH 28 (Lat: 42.123161,  Lng: -74.400247),  Route carried "on" structure: State highway 42,  Year Built: 2016,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 888 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 926 (year 2040),  Design Load: HL 93,  Features Intersected: BUSHNELLSVILLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,167,000,  Roadway Improvement Cost: $683,000,  Total Project Cost: $1,850,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102516,  Location: .8 MI N JCT SH 42 & SH 28 (Lat: 42.128383,  Lng: -74.403928),  Route carried "on" structure: State highway 42,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 888 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 926 (year 2040),  Design Load: HS 20,  Features Intersected: BUSHNELLSVILLE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,573,000,  Roadway Improvement Cost: $921,000,  Total Project Cost: $2,494,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102517,  Location: 2.3 MI N JCT SH 42 & SH28 (Lat: 42.147014,  Lng: -74.411269),  Route carried "on" structure: State highway 42,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 888 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 926 (year 2040),  Design Load: HS 20,  Features Intersected: BUSHNELLSVLLE CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.733,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,107,000,  Roadway Improvement Cost: $648,000,  Total Project Cost: $1,755,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102518,  Location: 2.8 MI N JCT SH 42 & SH28 (Lat: 42.154775,  Lng: -74.413689),  Route carried "on" structure: State highway 42,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 888 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 926 (year 2040),  Design Load: HS 20,  Features Intersected: BUSHNELLSVLLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.618,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $549,000,  Total Project Cost: $1,487,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104124,  Location: 1.8 MI N JCT RTS 214 & 28 (Lat: 42.101942,  Lng: -74.310819),  Route carried "on" structure: State highway 214,  Year Built: 1991,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 1,257 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,311 (year 2040),  Design Load: HS 20,  Features Intersected: STONY CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.928,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,074,000,  Roadway Improvement Cost: $629,000,  Total Project Cost: $1,703,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1078,  Location: .8 MI E SH28-MT TREMPER (Lat: 42.027811,  Lng: -74.271353),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 135 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 189 (year 2022),  Features Intersected: BURNS BROOK,  Facility Carried by Structure: CATSKILL INTERPRET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $790,000,  Roadway Improvement Cost: $463,000,  Total Project Cost: $1,252,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109128,  Location: 1.2 MI N JCT RTS 28+212 (Lat: 42.053558,  Lng: -74.293400),  Route carried "on" structure: State highway 28,  Year Built: 1966,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,240 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,289 (year 2040),  Design Load: HS 20,  Features Intersected: ROMER MTN KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.288,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $465,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109129,  Location: 0.2 MI N JCT RTS 28+212 (Lat: 42.041128,  Lng: -74.280583),  Route carried "on" structure: State highway 28,  Year Built: 2021,  Status: Open,  Structure Length: 24.44m (80.18ft),  Average Daily Traffic: 5,240 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,289 (year 2040),  Design Load: HL 93,  Features Intersected: ESOPUS CREEK
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 32.518,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 85.3m (279.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10913,  Location: 1.5 MI S JCT SH28 & SH212 (Lat: 42.019253,  Lng: -74.269425),  Route carried "on" structure: State highway 28,  Year Built: 1966,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 5,132 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,180 (year 2040),  Design Load: HS 20,  Features Intersected: LITT BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.911,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,477,000,  Roadway Improvement Cost: $865,000,  Total Project Cost: $2,342,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109131,  Location: 0.1 MI S JCT RTS 28+214 (Lat: 42.080869,  Lng: -74.314181),  Route carried "on" structure: State highway 28,  Year Built: 1966,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 27.65m (90.72ft),  Average Daily Traffic: 5,240 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,289 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH STREET, COUNTY ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.117,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.64m (90.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $10,425,000,  Roadway Improvement Cost: $6,105,000,  Total Project Cost: $16,530,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 222456,  Location: 0.4 MI.E.OF CHICHESTER (Lat: 42.100953,  Lng: -74.301042),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 184 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 258 (year 2037),  Design Load: HS 20,  Features Intersected: STONY CLOVE CREEK,  Facility Carried by Structure: SILVER HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $438,000,  Total Project Cost: $1,185,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222457,  Location: 1.0 MI NE OF ALLABEN (Lat: 42.121097,  Lng: -74.354289),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 142 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 199 (year 2037),  Design Load: HS 20,  Features Intersected: BROAD ST HOLLW BK,  Facility Carried by Structure: BROAD ST HLW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $395,000,  Total Project Cost: $1,070,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22246,  Location: 2.5 MILES SW OF PHOENICA (Lat: 42.049667,  Lng: -74.331475),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 34 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 48 (year 2037),  Features Intersected: WOODLAND CREEK,  Facility Carried by Structure: FAWN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $839,000,  Roadway Improvement Cost: $491,000,  Total Project Cost: $1,330,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222462,  Location: 0.9 MI. S. OF OLIVEREA (Lat: 42.052439,  Lng: -74.456239),  Route carried "on" structure: ServiceOther road ,  Year Built: 1903,  Year Reconstructed: 2011,  Status: Posted for load,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 9 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 13 (year 2039),  Features Intersected: ESOPUS CREEK,  Facility Carried by Structure: EAGLE MOUNTAIN ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $545,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $865,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 222464,  Location: .7 MILE SE OF PINE HILL (Lat: 42.125983,  Lng: -74.471106),  Route carried "on" structure: ServiceState lands road ,  Year Built: 1992,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 40 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 56 (year 0000),  Design Load: HS 20,  Features Intersected: BIRCH CREEK,  Facility Carried by Structure: PARK ACCESS ROAD
Minimum Vertical Clearance: 3.70m (12.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Toll: On toll road,  Owner: State Agenciy,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $988,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222465,  Location: BIG INDIAN (Lat: 42.104475,  Lng: -74.444150),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 15 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 21 (year 2037),  Features Intersected: TRIBUTARY ESOPUS CREEK,  Facility Carried by Structure: CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $540,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 226417,  Location: 1.0 MI NE OF CHICHESTER (Lat: 42.105603,  Lng: -74.289719),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 41 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 57 (year 2037),  Features Intersected: STONY CLOVE CREEK,  Facility Carried by Structure: STONEY CLOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $89,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $141,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226428,  Location: 0.7 MI SE OF PINE HILL (Lat: 42.123422,  Lng: -74.460733),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 45 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 63 (year 2037),  Features Intersected: ROSE MOUNTAIN STREAM,  Facility Carried by Structure: ROSE MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $398,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226439,  Location: 1 MILE NORTH OF PINE HILL (Lat: 42.147206,  Lng: -74.478056),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 88 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 123 (year 2036),  Features Intersected: BIRCH CREEK,  Facility Carried by Structure: BIRCH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 74.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $131,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $208,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 22644,  Location: 1.0 MI S OF ALLABEN (Lat: 42.103883,  Lng: -74.386003),  Route carried "on" structure: Other road ,  Year Built: 2005,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 40 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 56 (year 2033),  Features Intersected: FOX HOLLOW BROOK,  Facility Carried by Structure: HERDMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $274,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226765,  Location: 0.5 MI NW INT RT 28-MAIN (Lat: 42.133558,  Lng: -74.483169),  Route carried "on" structure: Business Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 258 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 361 (year 2037),  Features Intersected: CATHEDRAL GLEN,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $721,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $1,143,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226875,  Location: 1.0 M S OF BUSHNELLSVILLE (Lat: 42.137128,  Lng: -74.408508),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 12 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 17 (year 2037),  Features Intersected: BUSHNELLSVILLE CK,  Facility Carried by Structure: ROSSNER BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $753,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226901,  Location: .2 MI N INT RT 28 & MAIN (Lat: 42.130231,  Lng: -74.475994),  Route carried "on" structure: Business Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 258 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 361 (year 2037),  Features Intersected: BIRCH CREEK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 5 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $908,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227,  Location: .4 MI N JCT SH28&PK HL RD (Lat: 42.124981,  Lng: -74.376669),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.19m (3.90ft),  Features Intersected: PECK HOLLOW STRM,  Facility Carried by Structure: PECK HOLLOW ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 227001,  Location: .9 MI N JCT SH28&PK HL RD (Lat: 42.131456,  Lng: -74.377147),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.16m (3.81ft),  Design Load: HS 25 or greater,  Features Intersected: PECK HOLLOW STRM,  Facility Carried by Structure: PECK HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $755,000,  Roadway Improvement Cost: $442,000,  Total Project Cost: $1,198,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227002,  Location: 1.2 MI N OF RT.28 & PECK (Lat: 42.136147,  Lng: -74.370389),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Truck Traffic: 1%,  Features Intersected: PECK HOLLOW STRM,  Facility Carried by Structure: PECK HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $374,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227007,  Location: .4 MILE NORTH OF OLIVEREA (Lat: 42.073650,  Lng: -74.460525),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 1.34m (4.40ft),  Truck Traffic: 1%,  Design Load: HS 20,  Features Intersected: ESOPUS CREEK OVFL,  Facility Carried by Structure: DEER LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $358,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 227008,  Location: 2.4 MI S OF SH 28-ALLABEN (Lat: 42.095572,  Lng: -74.391397),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 224 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 314 (year 2040),  Features Intersected: FOX HOLLOW CREEK,  Facility Carried by Structure: FOX HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.912,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $403,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 227013,  Location: 2.5 Mile NW CR42 West Aso (Lat: 41.983217,  Lng: -74.326675),  Route carried "on" structure: ServiceOther road ,  Year Built: 2006,  Status: Open,  Structure Length: 0.94m (3.08ft),  Features Intersected: WITTENBERG BROOK,  Facility Carried by Structure: MOON HAW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $276,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Shandaken, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.