Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Nashua, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 62Number of bridges
  • 938ft / 286mTotal length
  • $125,680,000Total costs
  • 1,903,348Total average daily traffic
  • 122,925Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Nashua
  • No street view available for this location

New bridges in Nashua, NH - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21920-1929
  • 91950-1959
  • 21960-1969
  • 31970-1979
  • 31980-1989
  • 341990-1999
  • 32000-2009
  • 52010-2019
Reconstructed bridges in Nashua, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 61990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Nashua, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.7%Very good
  • 65.7%Good
  • 8.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 48.6%Good
  • 11.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 60.0%Good
  • 14.3%Satisfactory
  • 8.6%Fair
  • 2.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 22.2%Very good
  • 50.0%Good
  • 22.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 131010900068,  Location: .1 MI WEST OF JCT RT 3A (Lat: 42.763753,  Lng: -71.443531),  Route carried "on" structure: State highway 111,  Year Built: 1970,  Status: Open,  Structure Length: 18.35m (60.20ft),  Average Daily Traffic: 14,943 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,115 (year 2042),  Design Load: HS 20,  Features Intersected: MERRIMACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 10.0m (32.8ft), Horizontal Clearance: 46.0m (150.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.35m (60.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 131011000068,  Location: .1 MI WEST OF JCT RT 3-A (Lat: 42.763219,  Lng: -71.443525),  Route carried "on" structure: State highway 111,  Year Built: 1973,  Status: Open,  Structure Length: 18.35m (60.20ft),  Average Daily Traffic: 13,507 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,990 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: MERRIMACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.099,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 10.0m (32.8ft), Horizontal Clearance: 46.0m (150.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.35m (60.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 177009700121,  Location: .2 MI FROM COLISEUM AVE (Lat: 42.768950,  Lng: -71.493550),  Route carried "on" structure: State highway 130,  Year Built: 1999,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 20,073 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,708 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US 3,FEE TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.286,  Lanes on structure: 8,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 177009700152,  Location: 1.3 MI FR MERRIMACK TL (Lat: 42.789819,  Lng: -71.495719),  Route carried "on" structure: State highway ,  Year Built: 1989,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 15,526 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,978 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: FEE TPK,  Facility Carried by Structure: NH101A BP,SOMERSET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.308,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 177010000112,  Location: 0.5 MI FROM NH 130 (Lat: 42.760817,  Lng: -71.493531),  Route carried "on" structure: US 3,  Year Built: 1959,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 49,392 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 73,100 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: CANAL,SERVICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.314,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177010000118,  Location: 0.2 MI FROM SERVICE RD (Lat: 42.763919,  Lng: -71.493653),  Route carried "on" structure: US 3,  Year Built: 1959,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 60,008 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 88,811 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NASHUA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.963,  Lanes on structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177010000135,  Location: 0.01 MI CYPRESS LANE (Lat: 42.776794,  Lng: -71.493078),  Route carried "on" structure: State highway 101A,  Year Built: 1999,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 18,596 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 27,522 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.792,  Lanes on structure: 6,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177010100112,  Location: 0.5 MI FROM NH 130 (Lat: 42.761008,  Lng: -71.493131),  Route carried "on" structure: US 3,  Year Built: 1955,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 50,963 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 75,425 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: CANAL,SERVICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.176,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177010100118,  Location: 0.3 MI FROM NH 130 (Lat: 42.764092,  Lng: -71.493375),  Route carried "on" structure: US 3,  Year Built: 1955,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 63,264 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 93,630 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NASHUA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.545,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177010100127,  Location: .2 MI FROM NH 130 (Lat: 42.772692,  Lng: -71.493125),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 5,863 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,677 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US 3,FEE TPK,  Facility Carried by Structure: PINE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 53.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17701020009,  Location: 0.02 MI FROM NH111-A (Lat: 42.746814,  Lng: -71.492506),  Route carried "on" structure: State highway 111,  Year Built: 1998,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 34,405 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,919 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US 3,FEE TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.578,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 34.1m (111.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.63m (28.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177010400035,  Location: .5 MI W OF E DUNSTABLE RD (Lat: 42.706706,  Lng: -71.489258),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 3,839 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,681 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.110,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 85.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.78m (2.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 177011100045,  Location: .2 MI W OF E DUNSTABLE RD (Lat: 42.713756,  Lng: -71.482467),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 2,018 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,986 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: SEARLES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.380,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 17701150012,  Location: 0.18 MI FR FAIRMONT ST (Lat: 42.766997,  Lng: -71.477261),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 1,512 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,237 (year 2042),  Design Load: HL 93,  Features Intersected: BROAD ST PARKWAY,PAR,  Facility Carried by Structure: BALDWIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 68.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.13m (20.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177011600056,  Location: 0.2 MI W OF E DUNSTABLE (Lat: 42.722386,  Lng: -71.476828),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,773 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,624 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: NEW SEARLES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.117,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 177011800118,  Location: 60 FT FROM FIFIELD LANE (Lat: 42.764717,  Lng: -71.474783),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 915 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,354 (year 2042),  Design Load: HL 93,  Features Intersected: BROAD ST PKWY,PAR,  Facility Carried by Structure: FAIRMOUNT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.866,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 65.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177011900115,  Location: 0.4 MI N. of W. Hollis St (Lat: 42.762244,  Lng: -71.473283),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 12.53m (41.11ft),  Average Daily Traffic: 1,100 (year 2020),  Average Future Daily Traffic: 1,628 (year 2042),  Design Load: HL 93,  Features Intersected: NASHUA RIVER,  Facility Carried by Structure: BROAD ST PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.608,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.5m (155.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.53m (41.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177012100071,  Location: .1 MI W OF E DUNSTABLE RD (Lat: 42.731764,  Lng: -71.472367),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12,384 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,328 (year 2042),  Design Load: H 20,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 177012200073,  Location: 3.3 MI N MASS SL (Lat: 42.733239,  Lng: -71.472064),  Route carried "on" structure: US 3,  Year Built: 1955,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 109,637 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 162,262 (year 2042),  Design Load: HS 20,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: FEE TPK,N&S RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.312,  Lanes on structure: 9,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 177012300073,  Location: 0.01 MI FROM SALMON BK (Lat: 42.733058,  Lng: -71.470453),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 24,589 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 36,391 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK,RAMP 4CD,  Facility Carried by Structure: EAST DUNSTABLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.118,  Lanes on structure: 7,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 75.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177012300076,  Location: .1 MI W OF E DUNSTABLE RD (Lat: 42.735306,  Lng: -71.470986),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 6,756 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,998 (year 2042),  Design Load: H 20,  Features Intersected: SALMON BROOK,  Facility Carried by Structure: LUND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.005,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 177012600112,  Location: 0.13 MI FR MAIN ST (Lat: 42.761328,  Lng: -71.467906),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 4,380 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,482 (year 2042),  Design Load: HS 20,  Features Intersected: FACTORY ACCESS ROAD,  Facility Carried by Structure: WATER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.050,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.46m (17.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177012700115,  Location: 0.02 MI FROM PEARSON AVE (Lat: 42.763500,  Lng: -71.466556),  Route carried "on" structure: State highway ,  Year Built: 1925,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 14,519 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,488 (year 2042),  Design Load: H 15,  Features Intersected: NASHUA RIVER,  Facility Carried by Structure: DANIEL WEBSTER HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.627,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 5.2m (17.1ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 26.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 177013400073,  Location: .02 MI FROM ROBINSON RD (Lat: 42.735053,  Lng: -71.458203),  Route carried "on" structure: US 3,  Year Built: 1997,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 57,288 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 84,786 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: RAMP 3B,  Facility Carried by Structure: FEE TPK NB,RAMP 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.163,  Lanes on structure: 6,  Lanes under structure: 1,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 31.7m (104.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177013700076,  Location: 0.02 MI FROM ROBINSON RD (Lat: 42.736428,  Lng: -71.456569),  Route carried "on" structure: Ramp US 3,  Year Built: 1955,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,450 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,586 (year 2042),  Design Load: HL 93,  Features Intersected: US 3,FEE TPK NB RAMP,  Facility Carried by Structure: DANIEL WEBSTER HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.258,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 177013700095,  Location: .2 MI E OF MAIN ST (Lat: 42.749656,  Lng: -71.457086),  Route carried "on" structure: City street ,  Year Built: 1892,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 9,335 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,815 (year 2042),  Features Intersected: SALMON BROOK,  Facility Carried by Structure: ALLDS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.277,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 177013900115,  Location: 0.6 MI FROM ROUTE 3 (Lat: 42.763689,  Lng: -71.454728),  Route carried "on" structure: City street ,  Year Built: 1928,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 14,357 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,248 (year 2042),  Design Load: H 15,  Features Intersected: NASHUA RIVER,  Facility Carried by Structure: CANAL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 32.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 177014300049,  Location: 1 MI N MASS SL (Lat: 42.717400,  Lng: -71.451203),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 10,811 (year 2020),  Average Future Daily Traffic: 16,000 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK SB OFF RAMP,  Facility Carried by Structure: FEE TPK SB ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.969,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 52.4m (171.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014400057,  Location: 1.2 MI N MASS SL (Lat: 42.722958,  Lng: -71.450250),  Route carried "on" structure: Other road 3,  Year Built: 1996,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 47,136 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 69,761 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK SB OFF RAMPS,  Facility Carried by Structure: FEE TPK SB,RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.872,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.8m (137.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014500037,  Location: .5 MI FROM MASS S.L. (Lat: 42.708000,  Lng: -71.450878),  Route carried "on" structure: US 3,  Year Built: 1995,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 39,882 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 59,025 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SPIT BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.536,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014500056,  Location: AT EXIT 2 (Lat: 42.721922,  Lng: -71.449786),  Route carried "on" structure: State highway ,  Year Built: 1993,  Status: Open,  Structure Length: 25.24m (82.81ft),  Average Daily Traffic: 10,811 (year 2020),  Average Future Daily Traffic: 16,000 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK,  Facility Carried by Structure: RAMP H
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.352,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.24m (82.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014500057,  Location: 1.2 MI N MASS SL (Lat: 42.722472,  Lng: -71.449550),  Route carried "on" structure: Other road 3,  Year Built: 1996,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 49,186 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 72,795 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK SB OFF RAMPS,  Facility Carried by Structure: FEE TPK NB,ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.499,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.7m (84.3ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014600037,  Location: 0.5 MI FROM MASS SL. (Lat: 42.708042,  Lng: -71.450589),  Route carried "on" structure: US 3,  Year Built: 1993,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 39,882 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 59,025 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SPIT BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17701460005,  Location: 1.1 MI N MASS SL (Lat: 42.718839,  Lng: -71.448342),  Route carried "on" structure: Ramp US ,  Year Built: 1996,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 9,304 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,769 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: RAMP D,TOLL ACCESS DR,  Facility Carried by Structure: C-D ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.108,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014700037,  Location: 0.5 MI NORTH MASS SL (Lat: 42.708106,  Lng: -71.450208),  Route carried "on" structure: Ramp US 3,  Year Built: 1993,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 4,400 (year 2020),  Average Future Daily Traffic: 6,512 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SPIT BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.880,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 177014900056,  Location: 1/8 MI WEST OF D W HYW. (Lat: 42.721611,  Lng: -71.446386),  Route carried "on" structure: Other road D,  Year Built: 2000,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 8,187 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,116 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FEE TPK SB OFF RAMP,  Facility Carried by Structure: FEE TPK NB OFFRAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.945,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Discuss Nashua, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.