Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Campbell, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 50Number of bridges
  • 561ft / 171mTotal length
  • $85,222,000Total costs
  • 231,387Total average daily traffic
  • 54,668Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Campbell
  • No street view available for this location

New bridges in Campbell, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21930-1939
  • 231960-1969
  • 21970-1979
  • 51980-1989
  • 71990-1999
  • 52000-2009
  • 52010-2019
Reconstructed bridges in Campbell, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Campbell, NY
Average Bridge Truck Traffic in Campbell, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 16.7%Very good
  • 23.8%Good
  • 21.4%Satisfactory
  • 21.4%Fair
  • 2.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.5%Excellent
  • 23.8%Very good
  • 14.3%Good
  • 26.2%Satisfactory
  • 19.0%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.4%Excellent
  • 33.3%Very good
  • 21.4%Good
  • 26.2%Satisfactory
  • 14.3%Fair
  • 2.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.9%Excellent
  • 8.8%Very good
  • 20.6%Good
  • 52.9%Satisfactory
  • 14.7%Fair
Find on map >>   Show street view

Structure Number: 1011221,  Location: 0.2 MI E OF COOPERSPLAINS (Lat: 42.186106,  Lng: -77.138942),  Route carried "on" structure: Interstate 86,  Year Built: 2011,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 13,378 (year 2014),  Truck Traffic: 26%,  Design Load: HL 93,  Features Intersected: MEADS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.146,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,534,000,  Roadway Improvement Cost: $898,000,  Total Project Cost: $2,432,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1011222,  Location: 0.2 MI E OF COOPERSPLAINS (Lat: 42.185875,  Lng: -77.138961),  Route carried "on" structure: Interstate 86,  Year Built: 2011,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 12,456 (year 2019),  Truck Traffic: 26%,  Average Future Daily Traffic: 19,120 (year 2040),  Design Load: HL 93,  Features Intersected: MEADS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.049,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,424,000,  Roadway Improvement Cost: $834,000,  Total Project Cost: $2,257,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101123,  Location: IN COOPERSPLAINS (Lat: 42.186303,  Lng: -77.141742),  Route carried "on" structure: State highway 960M,  Year Built: 2011,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 1,809 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,238 (year 2040),  Design Load: HL 93,  Features Intersected: 86I 15 64011158 EB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.0m (88.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,592,000,  Roadway Improvement Cost: $1,518,000,  Total Project Cost: $4,110,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101124,  Location: 0.5 MI W OF COOPERSPLAINS (Lat: 42.187369,  Lng: -77.155167),  Route carried "on" structure: State highway 415,  Year Built: 1967,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 11.43m (37.50ft),  Average Daily Traffic: 2,550 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,155 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 86I 15 64011164, RTE I8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.590,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.43m (37.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,888,000,  Roadway Improvement Cost: $1,691,000,  Total Project Cost: $4,579,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1011251,  Location: JCT RTE 17 COHOCTON R (Lat: 42.188419,  Lng: -77.157711),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 14.66m (48.10ft),  Average Daily Traffic: 12,684 (year 2010),  Truck Traffic: 26%,  Design Load: HS 20+Mod,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.617,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.66m (48.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,685,000,  Roadway Improvement Cost: $2,158,000,  Total Project Cost: $5,843,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011252,  Location: JCT RTE 17 COHOCTON R (Lat: 42.188117,  Lng: -77.157703),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 14.78m (48.49ft),  Average Daily Traffic: 11,320 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,118 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.521,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.78m (48.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,874,000,  Roadway Improvement Cost: $2,269,000,  Total Project Cost: $6,143,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011261,  Location: 1.5 MI S JCT RTS 17 + 333 (Lat: 42.207292,  Lng: -77.169756),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 12,684 (year 2010),  Truck Traffic: 26%,  Design Load: HS 20+Mod,  Features Intersected: CURTIS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.268,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,322,000,  Roadway Improvement Cost: $774,000,  Total Project Cost: $2,096,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011262,  Location: 1.5 MI S JCT RTS 17 + 333 (Lat: 42.207292,  Lng: -77.170119),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 11,320 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,118 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CURTIS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.172,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,387,000,  Roadway Improvement Cost: $812,000,  Total Project Cost: $2,200,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011271,  Location: 1.2 MI S JCT I86 & SR 333 (Lat: 42.211931,  Lng: -77.173725),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 12,684 (year 2010),  Truck Traffic: 26%,  Design Load: HS 20+Mod,  Features Intersected: CURTIS HOLLOW CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.625,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,296,000,  Roadway Improvement Cost: $759,000,  Total Project Cost: $2,055,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011272,  Location: 1.2 MI S JCT I86 & SR 333 (Lat: 42.211928,  Lng: -77.174083),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 11,320 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,118 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CURTIS HOLLOW CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.544,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,288,000,  Roadway Improvement Cost: $754,000,  Total Project Cost: $2,042,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011281,  Location: 0.3 MI S JCT RTS 17 + 333 (Lat: 42.223047,  Lng: -77.180339),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 12,684 (year 2010),  Truck Traffic: 26%,  Design Load: HS 20+Mod,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.289,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.83m (28.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,233,000,  Roadway Improvement Cost: $1,308,000,  Total Project Cost: $3,540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011282,  Location: 0.3 MI S JCT RTS 17 + 333 (Lat: 42.222942,  Lng: -77.180742),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 11,320 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,118 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.86m (29.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,240,000,  Roadway Improvement Cost: $1,312,000,  Total Project Cost: $3,551,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011291,  Location: JCT RTS 17 + 333 (Lat: 42.228536,  Lng: -77.185842),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 12,684 (year 2010),  Truck Traffic: 32%,  Design Load: HS 20+Mod,  Features Intersected: RTE 333
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.517,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $996,000,  Total Project Cost: $2,696,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011292,  Location: JCT RTS 17 + 333 (Lat: 42.228583,  Lng: -77.186256),  Route carried "on" structure: Interstate 86,  Year Built: 1967,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 11,320 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,118 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 333
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.420,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $996,000,  Total Project Cost: $2,696,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 104608,  Location: .5 MILE WEST OF CAMPBELL (Lat: 42.230047,  Lng: -77.205639),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Posted for load-capacity,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 2,137 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,992 (year 2040),  Design Load: H 20,  Features Intersected: MICHIGAN CREEK,  Facility Carried by Structure: COUNTY ROAD 333
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.800,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $673,000,  Roadway Improvement Cost: $394,000,  Total Project Cost: $1,067,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 104609,  Location: JCT RTE. 333 & COHOCTON R (Lat: 42.231228,  Lng: -77.198656),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 2,137 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,992 (year 2040),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: COUNTY ROAD 333
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.188,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.6m (116.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.35m (30.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,279,000,  Roadway Improvement Cost: $1,920,000,  Total Project Cost: $5,199,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10461,  Location: RTE 333 IN CAMPBELL (Lat: 42.232131,  Lng: -77.197661),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,137 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,992 (year 2040),  Design Load: HS 20,  Features Intersected: OVERFLOW CHANNEL,  Facility Carried by Structure: COUNTY ROAD 333
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.043,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $799,000,  Roadway Improvement Cost: $468,000,  Total Project Cost: $1,266,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104611,  Location: 0.2 MI W. JCT. RTS 17&333 (Lat: 42.228869,  Lng: -77.188564),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 3,305 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,627 (year 2038),  Design Load: HS 20,  Features Intersected: WOLF/MCNUTT RUN,  Facility Carried by Structure: COUNTY ROAD 333
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $797,000,  Total Project Cost: $2,159,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1061371,  Location: 0.2 MI NW JCT RTS 17 +333 (Lat: 42.231536,  Lng: -77.188836),  Route carried "on" structure: Alternate Interstate 86,  Year Built: 1969,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 9,357 (year 2009),  Truck Traffic: 32%,  Design Load: HS 20+Mod,  Features Intersected: MCNUTT RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.163,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,247,000,  Roadway Improvement Cost: $730,000,  Total Project Cost: $1,977,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1061372,  Location: 0.2 MI NW JCT RTS 17 +333 (Lat: 42.231269,  Lng: -77.188981),  Route carried "on" structure: Alternate Interstate 86,  Year Built: 1969,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 9,485 (year 2018),  Truck Traffic: 24%,  Average Future Daily Traffic: 17,695 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MCNUTT RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.066,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,107,000,  Roadway Improvement Cost: $648,000,  Total Project Cost: $1,755,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1061381,  Location: 3.4 MI NW JCT RTS 17 +333 (Lat: 42.271100,  Lng: -77.221828),  Route carried "on" structure: Interstate 86,  Year Built: 1969,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 9,357 (year 2009),  Truck Traffic: 32%,  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 125
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.998,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,332,000,  Roadway Improvement Cost: $780,000,  Total Project Cost: $2,112,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1061382,  Location: 3.4 MI NW JCT RTS 17 +333 (Lat: 42.270694,  Lng: -77.222053),  Route carried "on" structure: Interstate 86,  Year Built: 1969,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 9,485 (year 2018),  Truck Traffic: 24%,  Average Future Daily Traffic: 17,695 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 125
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.902,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $802,000,  Total Project Cost: $2,173,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 22165,  Location: 1.9 MILES SE OF CAMPBELL (Lat: 42.210992,  Lng: -77.175492),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 424 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 594 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CURTIS CREEK,  Facility Carried by Structure: TANNERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $665,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221652,  Location: 0.3 MI E OF E CAMPBELL (Lat: 42.225811,  Lng: -77.129394),  Route carried "on" structure: Other road ,  Year Built: 1976,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 266 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 372 (year 2038),  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: DRY RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $925,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221653,  Location: 1.2 MI NE OF E CAMPBELL (Lat: 42.244000,  Lng: -77.100839),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 158 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 221 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: DRY RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.910,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $812,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221654,  Location: 1.5 MI NE OF E CAMPBELL (Lat: 42.241119,  Lng: -77.109594),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 158 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 221 (year 2038),  Design Load: HS 20,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: DRY RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $499,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $791,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221656,  Location: 1.4 MI NE OF CAMPBELL (Lat: 42.244172,  Lng: -77.174342),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 140 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 196 (year 2038),  Design Load: HS 20,  Features Intersected: MCNUTT RUN,  Facility Carried by Structure: KING HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $632,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221657,  Location: 1.8 MI NW OF CAMPBELL (Lat: 42.252542,  Lng: -77.216783),  Route carried "on" structure: Other road ,  Year Built: 1897,  Year Reconstructed: 2004,  Status: Closed,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 353 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 494 (year 2038),  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: WOOD ROAD
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.0m (206.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Very good,  Channel: Satisfactory,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $1,804,000,  Roadway Improvement Cost: $1,056,000,  Total Project Cost: $2,860,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 221658,  Location: 3.7 MI. N OF E CAMPBELL (Lat: 42.239083,  Lng: -77.127061),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 146 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 204 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: MEADS CREEK,  Facility Carried by Structure: WIXON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $601,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221659,  Location: .4 MI W OF EAST CAMPBELL (Lat: 42.230308,  Lng: -77.133275),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 452 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 633 (year 2038),  Design Load: HS 20,  Features Intersected: MEADS CREEK,  Facility Carried by Structure: TAFT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $856,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $1,358,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22166,  Location: .3 MI E OF EAST CAMPBELL (Lat: 42.222742,  Lng: -77.130047),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 9 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 13 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: WOODCOCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $559,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333278,  Location: 1.4 MI SW OF CAMPBELL (Lat: 42.223392,  Lng: -77.218119),  Route carried "on" structure: County highway ,  Year Built: 1973,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 865 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,211 (year 2040),  Design Load: HS 20,  Features Intersected: MICHIGAN CREEK,  Facility Carried by Structure: COUNTY ROAD 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.339,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $756,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33328,  Location: 2.1 MI NW OF COOPER PLNS (Lat: 42.206489,  Lng: -77.164208),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Posted for load-capacity,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 668 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 935 (year 2040),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: COUNTY ROAD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.479,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $2,049,000,  Roadway Improvement Cost: $1,200,000,  Total Project Cost: $3,248,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333281,  Location: 1MILE W INT CO RD 415 (Lat: 42.207381,  Lng: -77.177339),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 248 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 347 (year 2040),  Design Load: HS 20,  Features Intersected: CURTIS CREEK,  Facility Carried by Structure: COUNTY ROAD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.401,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $567,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333282,  Location: 3.0 MI W OF COOPERS PLNS (Lat: 42.192928,  Lng: -77.199731),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 248 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 347 (year 2040),  Features Intersected: CURTIS CREEK,  Facility Carried by Structure: COUNTY ROAD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.907,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $351,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333336,  Location: .7 MI-N OF COOPERS PLAINS (Lat: 42.192247,  Lng: -77.141492),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 2,756 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,409 (year 2040),  Design Load: HS 20,  Features Intersected: MEADS CREEK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.87m (15.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,507,000,  Roadway Improvement Cost: $882,000,  Total Project Cost: $2,389,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333337,  Location: 0.5 MI S OF E CAMPBELL (Lat: 42.218064,  Lng: -77.136806),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 2,067 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,557 (year 2040),  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.604,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $951,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333338,  Location: 2.1 MI N OF E CAMPBELL (Lat: 42.256017,  Lng: -77.110656),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 1,049 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,094 (year 2040),  Design Load: HS 20,  Features Intersected: MEADS CREEK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.431,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $460,000,  Total Project Cost: $1,245,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Discuss Campbell, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.