Bridge Statistics for Albany, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 105Number of bridges
  • 1,864ft / 568mTotal length
  • $294,026,000Total costs
  • 2,028,484Total average daily traffic
  • 60,882Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Albany
  • No street view available for this location

New bridges in Albany, GA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 41940-1949
  • 111950-1959
  • 91960-1969
  • 301970-1979
  • 81980-1989
  • 71990-1999
  • 32000-2009
  • 52010-2019
Reconstructed bridges in Albany, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Albany, GA
Average Bridge Truck Traffic in Albany, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 82.5%Good
  • 17.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.1%Very good
  • 54.0%Good
  • 7.9%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.6%Very good
  • 87.3%Good
  • 9.5%Satisfactory
  • 1.6%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.5%Excellent
  • 52.5%Very good
  • 25.0%Good
  • 17.5%Satisfactory
  • 2.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 93.8%Good
  • 6.3%Satisfactory
Find on map >>   Show street view

Structure Number: 2GA1475,  Location: 0.1 KM E OF WEST SHAW RD (Lat: 31.551111,  Lng: -84.092917),  Route carried "on" structure: ServiceOther road ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 10 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 12 (year 2032),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: DIRT ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Navy/Marines,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.2m (20.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $38,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2GA1802,  Location: 1.0 KM S OF WILKINSON WAY (Lat: 31.547639,  Lng: -84.095111),  Route carried "on" structure: ServiceOther road ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 60 (year 2032),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: WEST SHAW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Navy/Marines,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.2m (20.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.09m (10.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $23,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 95001,  Location: 2 MI NE OF MILLEDGEVILLE (Lat: 33.108819,  Lng: -83.213081),  Route carried "on" structure: City street 685,  Year Built: 1960,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: H 15,  Features Intersected: TOBLER CREEK,  Facility Carried by Structure: BARROWS FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Critical,  Channel: Satisfactory,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 42.98m (141.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 95002,  Location: 4.5 MI SW OF MILLEDGEVILL (Lat: 33.068486,  Lng: -83.302828),  Route carried "on" structure: County highway 66,  Year Built: 1960,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 790 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,185 (year 2031),  Design Load: H 15,  Features Intersected: FISHING CREEK,  Facility Carried by Structure: HORACE VEAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.46m (37.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 95005,  Location: 8.7 MI W OF MILLEDGEVILLE (Lat: 33.059231,  Lng: -83.374528),  Route carried "on" structure: County highway 69,  Year Built: 1982,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 340 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 510 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MOORE CREEK,  Facility Carried by Structure: BROWNS CROSSING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 95008,  Location: 10 MI NW OF MILLEDGEVILLE (Lat: 33.121728,  Lng: -83.389547),  Route carried "on" structure: County highway 86,  Year Built: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SAND CREEK TRIB,  Facility Carried by Structure: CHRISTMAS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 950002,  Location: ALBANY - SOUTHSIDE (Lat: 31.539381,  Lng: -84.136206),  Route carried "on" structure: City street 114,  Year Built: 1930,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 5,480 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,220 (year 2032),  Design Load: H 15,  Features Intersected: MARINE CORP CANAL,  Facility Carried by Structure: RADIUM SPRINGS ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 950003,  Location: OGLETHORPE BOULEVARD (Lat: 31.575431,  Lng: -84.147367),  Route carried "on" structure: Business US 19,  Year Built: 1953,  Status: Open,  Structure Length: 21.95m (72.01ft),  Average Daily Traffic: 30,100 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 45,150 (year 2032),  Design Load: HS 20,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: SR 520 BUSINESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $4,348,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $6,521,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950004,  Location: ALBANY - NORTHSIDE (Lat: 31.616478,  Lng: -84.182319),  Route carried "on" structure: US 82,  Year Built: 1979,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 33,850 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-149 PALMYRA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $867,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,301,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950005,  Location: NORTHWEST- ALBANY (Lat: 31.616639,  Lng: -84.182619),  Route carried "on" structure: US 82,  Year Built: 1979,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 33,850 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-149 PALMYRA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.8m (45.3ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $867,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,301,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950006,  Location: ALBANY - NORTHSIDE (Lat: 31.616519,  Lng: -84.180839),  Route carried "on" structure: US 82,  Year Built: 1980,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 33,850 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 19 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,606,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,409,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950007,  Location: ALBANY - NORTHSIDE (Lat: 31.616719,  Lng: -84.180778),  Route carried "on" structure: US 82,  Year Built: 1980,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 33,850 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 19 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,994,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,991,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950008,  Location: ALBANY - NORTHSIDE (Lat: 31.616289,  Lng: -84.176400),  Route carried "on" structure: US 82,  Year Built: 1974,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 38,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 520B (US 19B-US 82B)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $940,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,410,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950009,  Location: ALBANY - NORTHSIDE (Lat: 31.616478,  Lng: -84.176400),  Route carried "on" structure: US 82,  Year Built: 1974,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 38,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 520B (US 19B-US 82B)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $960,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,440,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95001,  Location: ALBANY - NORTHSIDE (Lat: 31.608147,  Lng: -84.157364),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 13.32m (43.70ft),  Average Daily Traffic: 38,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD,  Facility Carried by Structure: SR 520 (EBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $2,173,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $3,260,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 950011,  Location: ALBANY - NORTHSIDE (Lat: 31.608517,  Lng: -84.157497),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 13.32m (43.70ft),  Average Daily Traffic: 38,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD,  Facility Carried by Structure: SR 520 (WBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $1,707,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $2,561,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 950012,  Location: ALBANY - NORTHSIDE (Lat: 31.606300,  Lng: -84.154558),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 38,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 57,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 91 (SR 133)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 17 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $676,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,014,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 950013,  Location: ALBANY - NORTHSIDE (Lat: 31.606519,  Lng: -84.154469),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 91 (SR 133)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 17 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $672,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,008,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 950014,  Location: ALBANY - NORTHSIDE (Lat: 31.602750,  Lng: -84.149308),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: REMOVED NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,178,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950015,  Location: ALBANY - NORTHSIDE (Lat: 31.602989,  Lng: -84.149247),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: REMOVED NFS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,178,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950016,  Location: ALBANY - NE SECTION (Lat: 31.600406,  Lng: -84.145842),  Route carried "on" structure: US 19,  Year Built: 1969,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLINT RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,313,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950017,  Location: ALBANY - NE SECTION (Lat: 31.600542,  Lng: -84.145703),  Route carried "on" structure: US 19,  Year Built: 1969,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLINT RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,313,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950018,  Location: ALBANY - NE SECTION (Lat: 31.597950,  Lng: -84.142239),  Route carried "on" structure: US 19,  Year Built: 1967,  Status: Open,  Structure Length: 21.82m (71.59ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: SR 520 (EBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,798,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $4,196,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950019,  Location: ALBANY - NE SECTION (Lat: 31.598031,  Lng: -84.142011),  Route carried "on" structure: US 19,  Year Built: 1969,  Status: Open,  Structure Length: 21.85m (71.69ft),  Average Daily Traffic: 43,140 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 64,710 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: SR 520 (WBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,801,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $4,202,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95002,  Location: ALBANY - NORTHEAST SECTIO (Lat: 31.588378,  Lng: -84.115989),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 40,080 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 60,120 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-129 MAPLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,201,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950021,  Location: ALBANY - NORTHEAST SECTIO (Lat: 31.588628,  Lng: -84.115939),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 40,080 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 60,120 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-129 MAPLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $797,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,196,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 950022,  Location: ALBANY - EASTSIDE (Lat: 31.586389,  Lng: -84.113950),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 40,080 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 60,120 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $805,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,207,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950023,  Location: ALBANY - EASTSIDE (Lat: 31.586389,  Lng: -84.113678),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 40,080 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 60,120 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $797,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,196,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950024,  Location: ALBANY - EASTSIDE (Lat: 31.579842,  Lng: -84.111900),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 24,730 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,095 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR520-CLARK AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $641,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $961,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950025,  Location: ALBANY - EASTSIDE, CLARK (Lat: 31.579822,  Lng: -84.111625),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 24,730 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,095 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR520-CLARK AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,223,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950026,  Location: ALBANY - EASTSIDE (Lat: 31.576197,  Lng: -84.111569),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 24,730 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,095 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-127 EAST BROAD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 18 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $897,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950027,  Location: ALBANY - EASTSIDE (Lat: 31.576150,  Lng: -84.111300),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 24,730 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,095 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-127 E BROAD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 18 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,141,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950028,  Location: ALBANY - EASTSIDE (Lat: 31.571678,  Lng: -84.111544),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 24,730 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,095 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 520 BUSINESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $813,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,219,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950029,  Location: ALBANY - EASTSIDE (OGLETH (Lat: 31.571589,  Lng: -84.111281),  Route carried "on" structure: US 19,  Year Built: 1974,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 24,730 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,095 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 520 BUSINESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $836,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,254,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 95003,  Location: 1.5 MILES FROM ACREE (Lat: 31.572858,  Lng: -84.033950),  Route carried "on" structure: Business US 82,  Year Built: 1949,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 6,070 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,105 (year 2032),  Design Load: H 15,  Features Intersected: PINEY WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.82m (153.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,266,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950031,  Location: 3.5 MLES EAST OF JCT SR 3 (Lat: 31.573069,  Lng: -84.034069),  Route carried "on" structure: Business US 82,  Year Built: 1974,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 6,070 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,105 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: PINEY WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,266,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950033,  Location: ALBANY - EASTSIDE (Lat: 31.572353,  Lng: -84.122261),  Route carried "on" structure: Business US 19,  Year Built: 1954,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 18,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,335 (year 2032),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: SR 520 BUSINESS US
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,498,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,246,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 950034,  Location: ALBANY - EASTSIDE (Lat: 31.572386,  Lng: -84.121117),  Route carried "on" structure: Business US 19,  Year Built: 1954,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 18,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,335 (year 2032),  Design Load: HS 20,  Features Intersected: NS RAILROAD,  Facility Carried by Structure: SR 520 BUSINESS US
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $966,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,449,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 95004,  Location: ALBANY - NORTHSIDE (Lat: 31.601056,  Lng: -84.156142),  Route carried "on" structure: State highway 91,  Year Built: 1976,  Status: Open,  Structure Length: 36.24m (118.90ft),  Average Daily Traffic: 17,940 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,910 (year 2032),  Design Load: HS 20,  Features Intersected: REMOVED CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $7,180,000,  Roadway Improvement Cost: $718,000,  Total Project Cost: $10,769,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 950041,  Location: ALBANY - NORTHSIDE (Lat: 31.604019,  Lng: -84.155589),  Route carried "on" structure: State highway 91,  Year Built: 1974,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 17,940 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,910 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,477,000,  Deck Structure Type: Concrete Cast-file-Place