Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Uxbridge, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 38Number of bridges
  • 351ft / 107mTotal length
  • $59,899,000Total costs
  • 395,905Total average daily traffic
  • 42,550Total average daily truck traffic
  • 619,371Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Uxbridge
  • No street view available for this location

New bridges in Uxbridge, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 11910-1919
  • 31930-1939
  • 11940-1949
  • 91950-1959
  • 171980-1989
  • 21990-1999
  • 22010-2019
Reconstructed bridges in Uxbridge, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 21960-1969
  • 31970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Uxbridge, MA
Average Bridge Truck Traffic in Uxbridge, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.2%Very good
  • 29.0%Good
  • 32.3%Satisfactory
  • 32.3%Fair
  • 3.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 30.6%Good
  • 38.9%Satisfactory
  • 19.4%Fair
  • 2.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.8%Very good
  • 52.8%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 15.0%Fair
Find on map >>   Show street view

Structure Number: U02001B9NDOTNBI,  Location: 2.2MI.NTH OF MILLVILLE TL (Lat: 42.054953,  Lng: -71.616267),  Route carried "on" structure: State highway 122,  Year Built: 2012,  Status: Open,  Structure Length: 3.55m (11.65ft),  Average Daily Traffic: 4,560 (year 2018),  Truck Traffic: 7%,  Design Load: HL 93,  Features Intersected: WATER BLACKSTONE RIVER
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: U020081J2MUNNBI,  Location: 0.1M E JCT RTS 16 & 122 (Lat: 42.075214,  Lng: -71.625328),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 780 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,232 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MUMFORD RIVER,  Facility Carried by Structure: HWY DEPOT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,577,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: U020091LUDOTNBI,  Location: .1 MI EAST OF ST 122 (Lat: 42.076606,  Lng: -71.628283),  Route carried "on" structure: State highway 16,  Year Built: 1900,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 11,277 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 31,586 (year 2032),  Features Intersected: WATER MUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $613,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: U020111LTDOTNBI,  Location: .6 MI. E. OF ST-122 (Lat: 42.079817,  Lng: -71.619628),  Route carried "on" structure: State highway 16,  Year Built: 1954,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 10,742 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 25,269 (year 2032),  Design Load: H 20,  Features Intersected: WATER BLACKSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.351,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $2,114,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $3,172,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: U020141J3MUNNBI,  Location: .75 M S OF RT-16 (Lat: 42.070569,  Lng: -71.608744),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 800 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,263 (year 2031),  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY HECLA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.4m (14.4ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,030,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $3,046,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: U020151J4MUNNBI,  Location: @ COR. OF PATRICK HENRY R (Lat: 42.080828,  Lng: -71.608447),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 780 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,232 (year 2031),  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY HENRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $997,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: U020161LRDOTNBI,  Location: 1.1 MI. E. OF ST-122 (Lat: 42.083575,  Lng: -71.607303),  Route carried "on" structure: State highway 16,  Year Built: 1912,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 8,887 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,269 (year 2032),  Features Intersected: WATER WEST RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.220,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $172,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: U02017BWHMUNNBI,  Location: 600' E OF CONNOR PASS (Lat: 42.100406,  Lng: -71.601214),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 5,773 (year 2015),  Truck Traffic: 3%,  Features Intersected: WATER WATER W RIVER,  Facility Carried by Structure: HWY HWY E HARTFO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.653,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.1m (36.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $259,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: U020181DLMUNNBI,  Location: 400 FT. EAST OF OAK ST (Lat: 42.098375,  Lng: -71.622306),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 8,085 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,900 (year 2031),  Features Intersected: WATER BLACKSTONE RIVER,  Facility Carried by Structure: HWY HARTFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.996,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $826,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,240,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: U020191DKMUNNBI,  Location: 200 FT E OF OAK ST (Lat: 42.098003,  Lng: -71.623033),  Route carried "on" structure: City street ,  Year Built: 1870,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 8,093 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,900 (year 2031),  Features Intersected: WATER BLACKSTONE CANAL,  Facility Carried by Structure: HWY HARTFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $808,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: U020201DMMUNNBI,  Location: .4 MI E OF RTE 122 (Lat: 42.093128,  Lng: -71.636131),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 8,085 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,530 (year 2031),  Design Load: H 20,  Features Intersected: WATER MUMFORD RIVER,  Facility Carried by Structure: HWY HARTFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: December 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,045,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020211L9DOTNBI,  Location: .1 MI N OF HRTFD AV (Lat: 42.092242,  Lng: -71.643144),  Route carried "on" structure: State highway 122,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 10,002 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,267 (year 2033),  Design Load: H 20,  Features Intersected: WATER MUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.516,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2021,  Underwater Inspection Date: March 2019,  Bridge Improvement Cost: $1,146,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,720,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: U0202422QDOT634,  Location: 2 MI N OF MILVLL-UXBRG TL (Lat: 42.053858,  Lng: -71.613239),  Route carried "on" structure: State highway 122,  Year Built: 1955,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 4,560 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,159 (year 2033),  Design Load: HL 93,  Features Intersected: RR PWRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.315,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U02030BAMMUNNBI,  Location: BTWN 146A&122 NR MILLVILL (Lat: 42.029858,  Lng: -71.603242),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,700 (year 2013),  Truck Traffic: 1%,  Design Load: HL 93,  Features Intersected: WATER WATER BACON BROOK,  Facility Carried by Structure: HWY RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 71.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $839,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: U020361L8DOTNBI,  Location: 1 MILE WEST OF ST. 122 (Lat: 42.028733,  Lng: -71.607325),  Route carried "on" structure: State highway 146A,  Year Built: 1931,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7,511 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 10,897 (year 2032),  Design Load: H 20,  Features Intersected: WATER BACON BROOK,  Facility Carried by Structure: ST146 A/QUAKER HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020401MVDOTNBI,  Location: 1 MI. N. OF HARTFORD AVE (Lat: 42.089633,  Lng: -71.695164),  Route carried "on" structure: State highway 146,  Year Built: 1950,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 18,935 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 20,531 (year 2033),  Design Load: H 20,  Features Intersected: HWY LACKEY DAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.601,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 86.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $799,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,199,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020411MUDOTNBI,  Location: 1.6 M N OF ST-16 (Lat: 42.083000,  Lng: -71.689683),  Route carried "on" structure: State highway 146,  Year Built: 1950,  Status: Open,  Structure Length: 2.52m (8.27ft),  Average Daily Traffic: 17,501 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 22,426 (year 2031),  Design Load: H 20,  Features Intersected: WATER MUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.070,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,573,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020421LVDOTNBI,  Location: .3 MI W OF MENDON TL (Lat: 42.090181,  Lng: -71.597731),  Route carried "on" structure: State highway 16,  Year Built: 1949,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,594 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,531 (year 2031),  Features Intersected: WATER ROCK MEADOW BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.594,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $442,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: U020431YKDOTNBI,  Location: 1MI.NTH.OF ST-16 (Lat: 42.076772,  Lng: -71.682600),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 5,849 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,685 (year 2032),  Design Load: H 20,  Features Intersected: ST146 NB,  Facility Carried by Structure: HWY W HARTFRD AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.975,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,723,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $2,585,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020461MTDOTNBI,  Location: 2 MILES WEST OF ST-122 (Lat: 42.067275,  Lng: -71.665850),  Route carried "on" structure: State highway 146,  Year Built: 1950,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 17,474 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 23,690 (year 2032),  Design Load: H 20,  Features Intersected: ST 16 DOUGLAS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.093,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $893,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,340,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U0204720YDOTNBI,  Location: 4 MI NO OF RHODE IS. S.L. (Lat: 42.060811,  Lng: -71.650792),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 6.73m (22.08ft),  Average Daily Traffic: 13,949 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 395 (year 2032),  Design Load: HS 20,  Features Intersected: ST146 NB,  Facility Carried by Structure: HWY POND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,789,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $4,184,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U0204820RDOTNBI,  Location: .5 MI.WST.OF ST.146A (Lat: 42.050486,  Lng: -71.632142),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 312 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 632 (year 2032),  Design Load: HS 20,  Features Intersected: ST146,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $657,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $986,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U0205122PDOT634,  Location: .2 MI EAST OF ST 122 (Lat: 42.083569,  Lng: -71.636144),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 600 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 948 (year 2033),  Design Load: H 20,  Features Intersected: RR PWRR,  Facility Carried by Structure: HWY HOMEWARD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 12.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $1,844,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,767,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020521MWDOTNBI,  Location: 2.6 MI. S. OF ST-16 (Lat: 42.046375,  Lng: -71.629372),  Route carried "on" structure: Ramp State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,652 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,579 (year 2032),  Design Load: HS 20,  Features Intersected: WATER EMERSON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020531MXDOTNBI,  Location: 2.6 MI. S. OF ST-16 (Lat: 42.046186,  Lng: -71.627689),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 14,584 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 28,427 (year 2032),  Design Load: HS 20,  Features Intersected: COMB CHOCLG RD&EMRSN BK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,821,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $5,732,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020531MYDOTNBI,  Location: 2.6 MI. S. OF ST-16 (Lat: 42.046164,  Lng: -71.628097),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 18,612 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 28,427 (year 2032),  Design Load: HS 20,  Features Intersected: COMB CHOCLG RD&EMRSN BK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $575,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020541N0DOTNBI,  Location: .1 MI.WEST OF ST.146A (Lat: 42.039028,  Lng: -71.622803),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 2.85m (9.35ft),  Average Daily Traffic: 17,364 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,427 (year 2032),  Design Load: HS 20,  Features Intersected: ST 98 ALDRICH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,532,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $2,299,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020541N1DOTNBI,  Location: .1 MI. WEST OF ST-146A (Lat: 42.038819,  Lng: -71.623072),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 16,378 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,427 (year 2032),  Design Load: HS 20,  Features Intersected: ST 98 ALDRICH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $749,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,124,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020551N2DOTNBI,  Location: .5 MI N OF RTE 146-A (Lat: 42.027414,  Lng: -71.610831),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 17,288 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,586 (year 2032),  Design Load: HS 20,  Features Intersected: HWY ELMWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,615,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $2,423,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020551N3DOTNBI,  Location: .5 MI N OF RT 146-A (Lat: 42.027194,  Lng: -71.611028),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 2.84m (9.32ft),  Average Daily Traffic: 16,378 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 31,586 (year 2032),  Design Load: HS 20,  Features Intersected: HWY ELMWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $473,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020571N4DOTNBI,  Location: 1.1MI.NTH. OF R.I.ST.LINE (Lat: 42.023839,  Lng: -71.603822),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 14,989 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,378 (year 2032),  Design Load: HS 20,  Features Intersected: ST146 A/QUAKER HWY
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,112,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $3,169,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020571N5DOTNBI,  Location: 1.1MI.NTH OF R.I. ST.LINE (Lat: 42.023461,  Lng: -71.603739),  Route carried "on" structure: State highway 146,  Year Built: 1984,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 14,094 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 41,378 (year 2032),  Design Load: HS 20,  Features Intersected: ST146 A/QUAKER HWY
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $326,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U02058210DOTNBI,  Location: .1 MI E OF ST.146A (Lat: 42.019086,  Lng: -71.596761),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 600 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 948 (year 2032),  Design Load: HS 20,  Features Intersected: ST146,  Facility Carried by Structure: HWY COPPOLA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,677,000,  Roadway Improvement Cost: $368,000,  Total Project Cost: $5,516,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020591N6DOTNBI,  Location: 0.1 MI S DOUGLS-UXBRG TL (Lat: 42.089083,  Lng: -71.695292),  Route carried "on" structure: State highway 146,  Year Built: 1983,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 41,657 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 20,531 (year 2033),  Design Load: HS 20,  Features Intersected: HWY LACKEY DAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.713,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $470,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020601N7DOTNBI,  Location: .7MI. S. OF LACKEY DAM RD (Lat: 42.082675,  Lng: -71.690011),  Route carried "on" structure: State highway 146,  Year Built: 1983,  Status: Open,  Structure Length: 2.92m (9.58ft),  Average Daily Traffic: 20,847 (year 2014),  Truck Traffic: 15%,  Average Future Daily Traffic: 30,007 (year 2033),  Design Load: HS 20,  Features Intersected: WATER MUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.587,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: U020611YLDOTNBI,  Location: .9 MI N OF ST 16 (Lat: 42.076428,  Lng: -71.683153),  Route carried "on" structure: City street 146,  Year Built: 1983,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 6,400 (year 2014),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,500 (year 2031),  Design Load: HS 20,  Features Intersected: ST146 SB,  Facility Carried by Structure: HWY W HARTFRD AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.975,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $634,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $952,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: U020621N8DOTNBI,  Location: 2.1 MI.STH.OF LACKY DM.RD (Lat: 42.066911,  Lng: -71.666397),  Route carried "on" structure: US 146,  Year Built: 1983,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 16,693 (year 2015),  Truck Traffic: 15%,  Average Future Daily Traffic: 30,007 (year 2033),  Design Load: HS 20,  Features Intersected: ST 16 DOUGLAS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.300,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $229,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Uxbridge, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.