Inspection findings |
Inspection Date |
-
Demonstration of Knowledge; Food Manager Certifica...
-
Food Separated and Protected
-
Thermometers Provided and Accurate
|
Feb 26, 2009
|
-
Floors, Walls and Ceilings: Built, Maintained, and...
-
Toilet Facilities: Properly Constructed, Supplied,...
|
Dec 18, 2009
|
-
Equipment/Utensils - Approved; Installed; Clean; G...
-
Floors, Walls and Ceilings: Built, Maintained, and...
-
Premises; Personal/Cleaning Items; Vermin-proofing...
-
Proper Hot and Cold Holding Temperatures
-
Storm Water Discharge
|
Mar 25, 2010
|
-
Equipment/Utensils - Approved; Installed; Clean; G...
-
Floors, Walls and Ceilings: Built, Maintained, and...
-
Premises; Personal/Cleaning Items; Vermin-proofing...
-
Proper Hot and Cold Holding Temperatures
|
Apr 14, 2010
|
-
Equipment/Utensils - Approved; Installed; Clean; G...
-
Proper Hot and Cold Holding Temperatures
-
Warewashing Facilities: Installed, Maintained, Use...
-
Wiping Cloths: Properly Used and Stored
|
Oct 18, 2010
|
Restaurant representatives - add corrected or new information about Tacos El Grullense E & E, 999 El Camino Real, Redwood City, CA 94063 »