Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Windom, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 135ft / 40.9mTotal length
  • $1,538,999,000Total costs
  • 26,221Total average daily traffic
  • 3,007Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Windom
  • No street view available for this location

New bridges in Windom, MN - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 31960-1969
  • 31970-1979
  • 11980-1989
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Windom, MN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 12.5%Good
  • 50.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 37.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 11.1%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 17001,  Location: 0.3 MI S OF JCT TH 62; 60 (Lat: 43.858381,  Lng: -95.115622),  Route carried "on" structure: State highway 60,  Year Built: 1971,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 12,514 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 12,500 (year 2039),  Design Load: HS 20,  Features Intersected: DES MOINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 17002,  Location: 0.2 MI W OF JCT TH 71 (Lat: 43.862381,  Lng: -95.119256),  Route carried "on" structure: State highway 62,  Year Built: 1974,  Status: Open,  Structure Length: 8.48m (27.82ft),  Average Daily Traffic: 3,327 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,250 (year 2039),  Design Load: HS 20,  Features Intersected: DES MOINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 17008,  Location: 1.0 MI SE OF JCT TH 60 (Lat: 43.849208,  Lng: -95.105317),  Route carried "on" structure: US 71,  Year Built: 2010,  Status: Open,  Structure Length: 5.72m (18.77ft),  Average Daily Traffic: 2,185 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,350 (year 2039),  Design Load: HL 93,  Features Intersected: DES MOINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17501,  Location: 0.3 MI W OF JCT CSAH 13 (Lat: 43.890258,  Lng: -95.161094),  Route carried "on" structure: County highway 15,  Year Built: 1960,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 485 (year 2016),  Average Future Daily Traffic: 485 (year 2039),  Features Intersected: DES MOINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $496,000,000,  Roadway Improvement Cost: $30,000,000,  Total Project Cost: $451,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17505,  Location: 1.0 MI W OF JCT TH 71 (Lat: 43.872933,  Lng: -95.131386),  Route carried "on" structure: County highway 13,  Year Built: 1962,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,700 (year 2016),  Average Future Daily Traffic: 2,700 (year 2039),  Design Load: H 20,  Features Intersected: PERKINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17521,  Location: 0.1 MI W OF JCT CSAH 13 (Lat: 43.916697,  Lng: -95.182144),  Route carried "on" structure: County highway 14,  Year Built: 1979,  Status: Open,  Structure Length: 7.97m (26.15ft),  Average Daily Traffic: 100 (year 2016),  Average Future Daily Traffic: 100 (year 2039),  Design Load: HS 20,  Features Intersected: DES MOINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17J31,  Location: 0.4 MI S OF JCT TH 71 (Lat: 43.875369,  Lng: -95.117744),  Route carried "on" structure: City street 74,  Year Built: 2009,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 2,500 (year 2008),  Average Future Daily Traffic: 3,250 (year 2028),  Design Load: HS 25 or greater,  Features Intersected: PERKINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 6872,  Location: 0.1 MI SE OF S JCT TH 60 (Lat: 43.853500,  Lng: -95.114297),  Route carried "on" structure: ,  Year Built: 1956,  Status: Open,  Structure Length: 4.52m (14.83ft),  Features Intersected: US 71,  Facility Carried by Structure: RAILROAD
Lanes under structure: 2,  Owner: Railroad,  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.4m (50.5ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Underclear: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $67,000,000,  Total Project Cost: $999,999,000
Find on map >>   Show street view

Structure Number: 95338,  Location: 0.9 MI N OF JCT CR 82 (Lat: 43.819164,  Lng: -95.118247),  Route carried "on" structure: County highway 117,  Year Built: 1981,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 25 (year 1988),  Average Future Daily Traffic: 25 (year 2029),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.52m (1.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $116,000,000,  Roadway Improvement Cost: $8,000,000,  Total Project Cost: $88,000,000
Find on map >>   Show street view

Structure Number: L8938,  Location: 0.4 MI S OF JCT TH 71 (Lat: 43.874725,  Lng: -95.120567),  Route carried "on" structure: City street 76,  Year Built: 1964,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 200 (year 1986),  Average Future Daily Traffic: 200 (year 2029),  Features Intersected: PERKINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6872,  Location: 0.1 MI SE OF S JCT TH 60 (Lat: 43.853500,  Lng: -95.114297),  Route carried "under" structure: US 71,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 2,185 (year 2019),  Truck Traffic: 21%,  Features Intersected: US 71,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.4m (50.5ft)

Discuss Windom, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.