Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Warrior, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 171ft / 52.1mTotal length
  • $21,173,000Total costs
  • 240,260Total average daily traffic
  • 45,915Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Warrior
  • No street view available for this location

New bridges in Warrior, AL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 51950-1959
  • 21960-1969
  • 61980-1989
  • 51990-1999
Average Bridge Daily Traffic in Warrior, AL
Average Bridge Truck Traffic in Warrior, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 75.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Good
  • 75.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Good
  • 87.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Good
  • 36.4%Satisfactory
  • 45.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 57.1%Satisfactory
Find on map >>   Show street view

Structure Number: 2509,  Location: 100' E SIBLEYVILLE RD (Lat: 33.835239,  Lng: -86.784142),  Route carried "on" structure: County highway 121,  Year Built: 1940,  Status: Open,  Structure Length: 2.69m (8.83ft),  Average Daily Traffic: 1,723 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,923 (year 2041),  Design Load: H 15,  Features Intersected: HOGELAND CREEK,  Facility Carried by Structure: WARRIOR-TRAFFORD R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.6m (18.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.61m (11.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $688,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5315,  Location: 1.5 MI W OF WARRIOR (Lat: 33.813214,  Lng: -86.836633),  Route carried "on" structure: County highway 140,  Year Built: 1955,  Status: Open,  Structure Length: 2.03m (6.66ft),  Average Daily Traffic: 7,623 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,150 (year 2040),  Design Load: H 15,  Features Intersected: CANE CREEK,  Facility Carried by Structure: WARRIOR-JASPER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.78m (9.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $587,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6481,  Location: WARRIOR JASPER RD (Lat: 33.811131,  Lng: -86.825219),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 4,400 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,000 (year 2040),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: CO RD 140
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.72m (25.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,641,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,805,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6482,  Location: 0 . 2 MI NO CO RD 140 (Lat: 33.814983,  Lng: -86.825244),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 48,370 (year 2022),  Truck Traffic: 21%,  Average Future Daily Traffic: 61,281 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.808,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,614,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,775,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9786,  Location: 3 MI W OF WARRIOR (Lat: 33.800539,  Lng: -86.867558),  Route carried "on" structure: County highway 140,  Year Built: 1968,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,623 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,150 (year 2040),  Features Intersected: BREWER CREEK,  Facility Carried by Structure: WARRIOR-JASPER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $392,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9787,  Location: 2.5 MI W OF WARRIOR (Lat: 33.806133,  Lng: -86.862000),  Route carried "on" structure: County highway 140,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,623 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,150 (year 2040),  Features Intersected: THOMAS CREEK,  Facility Carried by Structure: WARRIOR-JASPER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13536,  Location: 1 ST WARRIOR INTERCHANGE (Lat: 33.785253,  Lng: -86.824961),  Route carried "on" structure: Interstate 65,  Year Built: 1985,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 6.57m (21.56ft),  Average Daily Traffic: 25,220 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 31,952 (year 2040),  Design Load: HS 20,  Features Intersected: SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 450.536,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.61m (24.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,028,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $3,331,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13537,  Location: 1 ST WARRIOR INTERCHANGE (Lat: 33.785178,  Lng: -86.824722),  Route carried "on" structure: Interstate 65,  Year Built: 1985,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 6.57m (21.56ft),  Average Daily Traffic: 25,220 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 31,952 (year 2040),  Design Load: HS 20,  Features Intersected: SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 450.536,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.61m (24.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,028,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $3,331,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13718,  Location: 1/2 MI E US 31 WARRIOR (Lat: 33.808561,  Lng: -86.800200),  Route carried "on" structure: County highway 636,  Year Built: 1985,  Status: Open,  Structure Length: 16.97m (55.68ft),  Average Daily Traffic: 785 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,060 (year 2040),  Design Load: HS 20,  Features Intersected: LOCUST FORK-WARRIOR R,  Facility Carried by Structure: WARRIOR-KIMBERLY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 48.6m (159.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.69m (58.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,639,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $4,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13861,  Location: 1.5 MI W OF WARRIOR (Lat: 33.815506,  Lng: -86.839950),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 70 (year 2040),  Design Load: HS 20,  Features Intersected: CANE CREEK TRIBUTARY,  Facility Carried by Structure: BRANTLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $283,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15018,  Location: 0.5 MILE NE COALDALE (Lat: 33.836589,  Lng: -86.786503),  Route carried "on" structure: County highway 634,  Year Built: 1990,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 513 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 560 (year 2040),  Design Load: HS 20,  Features Intersected: HOGELAND CREEK,  Facility Carried by Structure: SIBLEYVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.72m (5.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $448,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15262,  Location: 4 MI SW OF HAYDEN (Lat: 33.844319,  Lng: -86.787925),  Route carried "on" structure: County highway 379,  Year Built: 1990,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 158 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 235 (year 2040),  Design Load: HS 20,  Features Intersected: SIBLEYVILLE CREEK,  Facility Carried by Structure: SIBLEYVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $492,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16698,  Location: 0.125 MI W I-65 WARRIOR (Lat: 33.811286,  Lng: -86.826486),  Route carried "on" structure: County highway 601,  Year Built: 1955,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 11,050 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 15,100 (year 2041),  Design Load: HS 20,  Features Intersected: CANE CREEK,  Facility Carried by Structure: CANE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $861,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $947,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17457,  Location: 2 MI N CANE CREEK ROAD (Lat: 33.831231,  Lng: -86.831992),  Route carried "on" structure: County highway 630,  Year Built: 1998,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 302 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 350 (year 2041),  Design Load: HS 20,  Features Intersected: CANE CREEK,  Facility Carried by Structure: ROUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.72m (5.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $466,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $513,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17535,  Location: 2ND WARRIOR EXIT (Lat: 33.800175,  Lng: -86.824875),  Route carried "on" structure: Interstate 65,  Year Built: 1999,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 49,930 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 63,258 (year 2041),  Design Load: HS 20,  Features Intersected: DANA ROAD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 452.301,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.0m (111.5ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,992,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,191,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6481,  Location: WARRIOR JASPER RD (Lat: 33.811131,  Lng: -86.825219),  Route carried "under" structure: Interstate 65,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 48,370 (year 2020),  Truck Traffic: 21%,  Features Intersected: I 65,  Facility Carried by Structure: CO RD 140
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 453.486,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 13536,  Location: 1 ST WARRIOR INTERCHANGE (Lat: 33.785253,  Lng: -86.824961),  Route carried "under" structure: County highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 20%,  Features Intersected: SERVICE RD,  Facility Carried by Structure: I - 65 SOUTH
Minimum Vertical Clearance: 17.07m (56.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 13537,  Location: 1 ST WARRIOR INTERCHANGE (Lat: 33.785178,  Lng: -86.824722),  Route carried "under" structure: County highway ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 20%,  Features Intersected: SERVICE RD,  Facility Carried by Structure: I - 65 NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 17535,  Location: 2ND WARRIOR EXIT (Lat: 33.800175,  Lng: -86.824875),  Route carried "under" structure: Ramp City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 1%,  Features Intersected: DANA ROAD,  Facility Carried by Structure: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.0m (111.5ft)

Discuss Warrior, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.