Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Soldier, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 128ft / 38.6mTotal length
  • $360,000Total costs
  • 1,825Total average daily traffic
  • 200Total average daily truck traffic
  • 2,008Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Soldier
  • No street view available for this location

New bridges in Soldier, KS - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11960-1969
  • 51970-1979
  • 41980-1989
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Very good
  • 27.3%Good
  • 54.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 54.5%Good
  • 36.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 21.4%Good
  • 42.9%Satisfactory
  • 7.1%Fair
  • 14.3%Poor
  • 7.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 66063,  Location: 7.5S.W. OF GOFF (Lat: 39.565944,  Lng: -95.962222),  Route carried "on" structure: County highway 1846,  Year Built: 1962,  Status: Posted for load,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 45 (year 2008),  Average Future Daily Traffic: 50 (year 2038),  Features Intersected: SOLDIER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 16.40m (53.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $230,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 430965003666,  Location: 1.6 N 1.0 W OF SOLDIER (Lat: 39.512767,  Lng: -95.979722),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 10 (year 2038),  Features Intersected: TRIB. TO SOLDIER CREEK,  Facility Carried by Structure: LOCAL D-257
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Other Special Inspection Date: Febuary 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 430965503687,  Location: 2.7S 0.5W OF SOLDIER (Lat: 39.497456,  Lng: -95.970744),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 10 (year 2038),  Design Load: H 20,  Features Intersected: TRIB. TO SOLDIER CREEK,  Facility Carried by Structure: LOCAL D4 248
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Other Special Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 43096590362,  Location: 1.0N OF SOLDIER (Lat: 39.550647,  Lng: -95.959722),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 30 (year 2038),  Features Intersected: TRIB. TO SOLDIER CREEK,  Facility Carried by Structure: LOCAL 278 D7
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Other Special Inspection Date: September 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 43096700362,  Location: 1.0N 0.1E OF SOLDIER (Lat: 39.550661,  Lng: -95.959722),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 25 (year 2038),  Design Load: H 20,  Features Intersected: SOLDIER CREEK,  Facility Carried by Structure: LOCAL 278 E
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 43096700364,  Location: AT SOLDIER (Lat: 39.536081,  Lng: -95.961389),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 60 (year 2038),  Design Load: H 20,  Features Intersected: SOLDIER CREEK,  Facility Carried by Structure: LOCAL 270 E
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Other Special Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 43096780372,  Location: 4.0S 0.8E OF SOLDIER (Lat: 39.477761,  Lng: -95.944444),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 25 (year 2038),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK,  Facility Carried by Structure: LOCAL 238 E7
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Other Special Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 43096980362,  Location: 1.0N 1.9E OF SOLDIER (Lat: 39.550667,  Lng: -95.942342),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 15 (year 2018),  Average Future Daily Traffic: 15 (year 2038),  Features Intersected: TRIB. TO ELK CREEK,  Facility Carried by Structure: LOCAL 278 F7
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Channel: Serious,  Culverts: Poor,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $45,000
Find on map >>   Show street view

Structure Number: 66096520356,  Location: 1.0S 4.0W OF BANCROFT (Lat: 39.595222,  Lng: -95.972611),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 10 (year 2008),  Average Future Daily Traffic: 15 (year 2038),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK,  Facility Carried by Structure: LOCAL RD. S-6
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 23.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $85,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 999906200430151,  Location: 6.31 MI N K16 (Lat: 39.551111,  Lng: -95.962500),  Route carried "on" structure: State highway 62,  Year Built: 1935,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 221 (year 2041),  Design Load: H 10,  Features Intersected: SOLDIER CREEK DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 9.946,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999906200430161,  Location: 6.63 MI N K16 (Lat: 39.555556,  Lng: -95.961111),  Route carried "on" structure: State highway 62,  Year Built: 1971,  Status: Open,  Structure Length: 4.04m (13.25ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 221 (year 2041),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.454,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 13.25m (43.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999906200430221,  Location: 2.00 MI N K16 (Lat: 39.491389,  Lng: -95.961111),  Route carried "on" structure: State highway 62,  Year Built: 1985,  Status: Open,  Structure Length: 3.73m (12.24ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 442 (year 2041),  Design Load: HS 20,  Features Intersected: TOAD CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 3.143,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 12.25m (40.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906200430231,  Location: 2.54 MI N OF K16 (Lat: 39.499444,  Lng: -95.960556),  Route carried "on" structure: State highway 62,  Year Built: 1985,  Status: Open,  Structure Length: 4.35m (14.27ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 442 (year 2041),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 4.036,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 14.26m (46.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906200430241,  Location: 4.52 MI N K16 (Lat: 39.527500,  Lng: -95.961944),  Route carried "on" structure: State highway 62,  Year Built: 1985,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 442 (year 2041),  Design Load: HS 20,  Features Intersected: SOLDIER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 7.166,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 15.90m (52.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Soldier, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.