Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sallis, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 115ft / 34.9mTotal length
  • $3,220,000Total costs
  • 8,720Total average daily traffic
  • 999Total average daily truck traffic
  • 9,015Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sallis
  • No street view available for this location

New bridges in Sallis, MS - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 11960-1969
  • 11970-1979
  • 21980-1989
  • 21990-1999
  • 22000-2009
  • 32010-2019
  • 12020-2022
Average Bridge Daily Traffic in Sallis, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 55.6%Good
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Very good
  • 33.3%Good
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 44.4%Good
  • 11.1%Fair
  • 11.1%Poor
  • 11.1%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Excellent
  • 23.1%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 15.4%Fair
Find on map >>   Show street view

Structure Number: 31000120040903,  Location: 2.9 MI E SR 429 (Lat: 33.030664,  Lng: -89.728733),  Route carried "on" structure: State highway 12,  Year Built: 2016,  Status: Open,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,300 (year 2040),  Design Load: HL 93,  Features Intersected: LONG CREEK TRIBUTARY 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.673,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000120040913,  Location: 3.9 MI E SR 429 (Lat: 33.026950,  Lng: -89.711539),  Route carried "on" structure: State highway 12,  Year Built: 2016,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,300 (year 2040),  Design Load: HL 93,  Features Intersected: WARD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.332,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004290040184,  Location: 3.2 MI N SR 14 (Lat: 32.981658,  Lng: -89.773181),  Route carried "on" structure: State highway 429,  Year Built: 1986,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 320 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.076,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 31004290040185,  Location: 3.3 MI N SR 14 (Lat: 32.982597,  Lng: -89.773189),  Route carried "on" structure: State highway 429,  Year Built: 1986,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 320 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: HORTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.180,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 31004290040208,  Location: 0.9 MI S SR 12 (Lat: 33.015389,  Lng: -89.765433),  Route carried "on" structure: State highway 429,  Year Built: 1991,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 920 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 920 (year 2040),  Design Load: HS 20,  Features Intersected: LONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.009,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA0400000000025,  Location: SEC 11 T13N R 5E (Lat: 32.989850,  Lng: -89.752817),  Route carried "on" structure: County highway 116,  Year Built: 2003,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 40 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2030),  Design Load: HS 20,  Features Intersected: HORTON CREEK,  Facility Carried by Structure: CO. ROAD 4137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.86m (2.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: SA0400000000029,  Location: SEC 22 T13N R 5E (Lat: 32.966186,  Lng: -89.780342),  Route carried "on" structure: County highway 92,  Year Built: 1999,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2030),  Design Load: HS 20,  Features Intersected: HORTON CREEK,  Facility Carried by Structure: CO. ROAD 4102
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.460,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: SA040000000006,  Location: SEC 34 T14N R 5E B (Lat: 33.025278,  Lng: -89.779722),  Route carried "on" structure: County highway 57,  Year Built: 1976,  Status: Closed,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 180 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 270 (year 2030),  Design Load: H 15,  Features Intersected: BCH OF LONG CREEK,  Facility Carried by Structure: CO. ROAD 4110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.149,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $632,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA0400000000067,  Location: SEC 31 T14N R 6E (Lat: 33.024722,  Lng: -89.731667),  Route carried "on" structure: County highway 68,  Year Built: 1960,  Status: Closed,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 45 (year 2035),  Design Load: H 10,  Features Intersected: LONG CREEK,  Facility Carried by Structure: CO. ROAD 4153
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Failed,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $520,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: SA0400000000068,  Location: SEC 32 T14N R 6E (Lat: 33.027517,  Lng: -89.710183),  Route carried "on" structure: County highway 33,  Year Built: 2003,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HS 20,  Features Intersected: WARD BRANCH,  Facility Carried by Structure: CO. ROAD 4221
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: SA0400000000172,  Location: SEC 26 T14N R 5E (Lat: 33.043281,  Lng: -89.762839),  Route carried "on" structure: County highway 600,  Year Built: 1956,  Status: Posted for load,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 60 (year 2035),  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: CO. ROAD 4204
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.080,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 2.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $243,000,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA040000000A026,  Location: SEC 20 T13N R 5E B (Lat: 32.963439,  Lng: -89.803025),  Route carried "on" structure: County highway 668,  Year Built: 2020,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 140 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 210 (year 2035),  Features Intersected: BCH OF ROBY CREEK,  Facility Carried by Structure: CO. ROAD 4127
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA040000000A031,  Location: SEC 23 T13N R 5E (Lat: 32.965539,  Lng: -89.755814),  Route carried "on" structure: County highway 116,  Year Built: 2016,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 40 (year 2016),  Average Future Daily Traffic: 60 (year 2036),  Design Load: HL 93,  Features Intersected: MAY CREEK,  Facility Carried by Structure: CO. ROAD 4137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $425,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Sallis, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.