Bridge Statistics for Pierrepont Manor, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 102ft / 30.8mTotal length
  • $12,024,000Total costs
  • 86,274Total average daily traffic
  • 3,413Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pierrepont Manor
  • No street view available for this location

New bridges in Pierrepont Manor, NY - historical statistics
  • New bridges - historical statistics
  • 101960-1969
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Pierrepont Manor, NY
Average Bridge Truck Traffic in Pierrepont Manor, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 40.0%Very good
  • 10.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 30.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Excellent
  • 50.0%Very good
  • 25.0%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 100863,  Location: 0.2 MI N JCT RTS 11 & 193 (Lat: 43.737128,  Lng: -76.057731),  Route carried "on" structure: US 11,  Year Built: 1997,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,866 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,946 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $613,000,  Roadway Improvement Cost: $359,000,  Total Project Cost: $971,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1032,  Location: JCT RTS 193 + I-81 (Lat: 43.737775,  Lng: -76.074561),  Route carried "on" structure: State highway 193,  Year Built: 1961,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 827 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 862 (year 2040),  Design Load: H 20,  Features Intersected: RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.341,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $883,000,  Roadway Improvement Cost: $517,000,  Total Project Cost: $1,400,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032011,  Location: 0.2 MI N JCT 193 + I-81 (Lat: 43.740839,  Lng: -76.073742),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 9,336 (year 2009),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.739,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $665,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032012,  Location: 0.2 MI N JCT 193 + I-81 (Lat: 43.740667,  Lng: -76.072900),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,311 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,134 (year 2040),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.739,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $352,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103202,  Location: 1.0 MI N JCT 193 + I-81 (Lat: 43.748578,  Lng: -76.066094),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 114 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 160 (year 2018),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: CR 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $590,000,  Total Project Cost: $1,598,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109469,  Location: JCT 193 + I-81 NB (Lat: 43.737614,  Lng: -76.073744),  Route carried "on" structure: State highway 193,  Year Built: 1961,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 827 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 862 (year 2040),  Design Load: H 20,  Features Intersected: RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.405,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $883,000,  Roadway Improvement Cost: $517,000,  Total Project Cost: $1,400,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109487,  Location: 0.9 MI N JCT RTS 193+I-81 (Lat: 43.747839,  Lng: -76.065872),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 129 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 181 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: CR 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.195,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $997,000,  Roadway Improvement Cost: $584,000,  Total Project Cost: $1,580,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333845,  Location: 3.0 MI NW OF MANNSVILLE (Lat: 43.745831,  Lng: -76.090414),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 164 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 230 (year 2037),  Features Intersected: BEAR CREEK,  Facility Carried by Structure: LOG LONDON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $612,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333846,  Location: 3.5 MILES NE OF ELLISBURG (Lat: 43.757422,  Lng: -76.091333),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 149 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 209 (year 2039),  Features Intersected: SOUTH SANDY CREEK,  Facility Carried by Structure: LOG LONDON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.834,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $671,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333848,  Location: 1 MILE N JCT CR91 & I81 (Lat: 43.762206,  Lng: -76.067264),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 129 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 181 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SOUTH SANDY CREEK,  Facility Carried by Structure: County Route 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.650,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $598,000,  Total Project Cost: $1,619,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33385,  Location: 2 MI E EXIT 40 OF I-81 (Lat: 43.737039,  Lng: -76.058969),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 348 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 487 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: COUNTY ROAD 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.611,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $796,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333851,  Location: 3.0 N OF MANNSVILLE (Lat: 43.762614,  Lng: -76.037006),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 103 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 144 (year 2039),  Features Intersected: RAYSTONE CREEK,  Facility Carried by Structure: LEMAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $360,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1032,  Location: JCT RTS 193 + I-81 (Lat: 43.737775,  Lng: -76.074561),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: RTE 193
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 16.331,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 103202,  Location: 1.0 MI N JCT 193 + I-81 (Lat: 43.748578,  Lng: -76.066094),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: CR 91
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 8.737,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: 109469,  Location: JCT 193 + I-81 NB (Lat: 43.737614,  Lng: -76.073744),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 16,176 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: RTE 193
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 7.401,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 109487,  Location: 0.9 MI N JCT RTS 193+I-81 (Lat: 43.747839,  Lng: -76.065872),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: CR 91
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 8.801,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.1m (52.8ft)