Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Parachute, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 154ft / 47.4mTotal length
  • $1,321,000Total costs
  • 96,733Total average daily traffic
  • 15,415Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Parachute
  • No street view available for this location

New bridges in Parachute, CO - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11970-1979
  • 81980-1989
  • 12010-2019
Average Bridge Daily Traffic in Parachute, CO
Average Bridge Truck Traffic in Parachute, CO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 20.0%Good
  • 60.0%Satisfactory
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 50.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 33.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: G-04-AI,  Location: 1/2 MI W OF PARACHUTE INT (Lat: 39.449903,  Lng: -108.053403),  Route carried "on" structure: Interstate 70A,  Year Built: 1982,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 9,000 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 11,160 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PARACHUTE CREEK,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.439,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.4m (96.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: G-04-AJ,  Location: 1/2 MI W OF PARACHUTE INT (Lat: 39.450058,  Lng: -108.053669),  Route carried "on" structure: Interstate 70A,  Year Built: 1982,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 9,000 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 11,160 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PARACHUTE CREEK,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.436,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.4m (96.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: G-04-AO,  Location: .3 MI E OF PARACHUTE (Lat: 39.460603,  Lng: -108.044428),  Route carried "on" structure: Interstate 70A,  Year Built: 1982,  Status: Open,  Structure Length: 5.40m (17.72ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR SPUR,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 120.844,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: G-04-AP,  Location: 1/2 MI E OF PARACHUTE (Lat: 39.460711,  Lng: -108.044911),  Route carried "on" structure: Interstate 70A,  Year Built: 1982,  Status: Open,  Structure Length: 5.34m (17.52ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ACCESS RD & RR SPUR,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 120.844,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: G-04-AR,  Location: .05 MI EAST OF PARACHUTE (Lat: 39.455219,  Lng: -108.046867),  Route carried "on" structure: ServiceInterstate 70A,  Year Built: 1982,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 20,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 26,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR AR,  Facility Carried by Structure: CROSSROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: G-04-AS,  Location: PARACHUTE (Lat: 39.455850,  Lng: -108.047956),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 7.82m (25.66ft),  Average Daily Traffic: 14,168 (year 2008),  Truck Traffic: 15%,  Average Future Daily Traffic: 29,753 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I 70 ML,  Facility Carried by Structure: COUNTY ROAD 300
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: G-04-R,  Location: 1/2 M W OF PARACHUTE (Lat: 39.450433,  Lng: -108.054275),  Route carried "on" structure: US 6M,  Year Built: 1934,  Status: Open,  Structure Length: 1.90m (6.23ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,968 (year 2040),  Design Load: H 15,  Features Intersected: PARACHUTE CREEK SR,  Facility Carried by Structure: US 6 ML
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.477,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,321,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: GAR301-00.71,  Location: 0.5 Miles East of I-70 (Lat: 39.453444,  Lng: -108.040778),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 9.83m (32.25ft),  Average Daily Traffic: 11,483 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 14,583 (year 2040),  Design Load: HS 20,  Features Intersected: Colorado River,  Facility Carried by Structure: County Road 300
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.005,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: PARACHUT 1-24.8,  Location: 0.75 Mi SW of CO Rd 301 (Lat: 39.445944,  Lng: -108.054111),  Route carried "on" structure: City street ,  Year Built: 1982,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 1,272 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,615 (year 2040),  Design Load: HS 20,  Features Intersected: Parachute Creek,  Facility Carried by Structure: Cardinal Way
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.420,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.3m (99.4ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 0.0m,  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: PARACHUTE 2,  Location: 0.25 MI S CNTY RD215 (Lat: 39.453511,  Lng: -108.060550),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 710 (year 2020),  Truck Traffic: 55%,  Average Future Daily Traffic: 902 (year 2040),  Design Load: HL 93,  Features Intersected: PARACHUTE CREEK,  Facility Carried by Structure: PARACHUTE PRK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.7m (48.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.7m (74.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: G-04-AS,  Location: PARACHUTE (Lat: 39.455850,  Lng: -108.047956),  Route carried "under" structure: Interstate 70A,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2014),  Truck Traffic: 15%,  Features Intersected: I 70 ML,  Facility Carried by Structure: COUNTY ROAD 300
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.037,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Discuss Parachute, Colorado (CO) on our hugely popular Colorado forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.