Bridge Statistics for Oakwood, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 305ft / 93.0mTotal length
  • $39,855,000Total costs
  • 581,732Total average daily traffic
  • 7,061Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oakwood
  • No street view available for this location

New bridges in Oakwood, GA - historical statistics
  • New bridges - historical statistics
  • 91960-1969
  • 31970-1979
  • 11980-1989
  • 31990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Oakwood, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
Average Bridge Daily Traffic in Oakwood, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 69.2%Good
  • 15.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 23.1%Very good
  • 69.2%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 76.9%Good
  • 7.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 55.6%Good
  • 22.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 87.5%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 1390022,  Location: IN OAKWOOD (Lat: 34.245728,  Lng: -83.883978),  Route carried "on" structure: State highway 53,  Year Built: 1969,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 19,040 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,560 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BALUS CREEK,  Facility Carried by Structure: MUNDY MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 1390023,  Location: IN OAKWOOD (Lat: 34.236228,  Lng: -83.873808),  Route carried "on" structure: State highway 53,  Year Built: 1969,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 27,280 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 40,920 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOR SOUTHERN RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.8m (91.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,075,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,612,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390055,  Location: IN OAKWOOD (Lat: 34.246258,  Lng: -83.835047),  Route carried "on" structure: ServiceCounty highway 472,  Year Built: 1967,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 1,570 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,355 (year 2032),  Design Load: HS 15,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: ELACHEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,172,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,758,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390056,  Location: IN OAKWOOD (Lat: 34.215619,  Lng: -83.881069),  Route carried "on" structure: County highway 524,  Year Built: 1968,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 4,760 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,140 (year 2032),  Design Load: HS 20,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: PLAINVIEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,266,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 139501,  Location: 3.7 MI S OF CLERMONT (Lat: 34.413739,  Lng: -83.801550),  Route carried "on" structure: County highway 109,  Year Built: 1987,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: EAST FORK LITTLE RIVER,  Facility Carried by Structure: CLAUDE PECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1395019,  Location: 5.2 MI SW OF GAINESVILLE (Lat: 34.247478,  Lng: -83.890569),  Route carried "on" structure: County highway 487,  Year Built: 1994,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 3,780 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,670 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BALUS CREEK,  Facility Carried by Structure: OLD FLOWERY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $229,000
Find on map >>   Show street view

Structure Number: 1395026,  Location: 4.1 MI SE OF OAKWOOD (Lat: 34.192078,  Lng: -83.827808),  Route carried "on" structure: County highway 688,  Year Built: 1974,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CANEY CREEK,  Facility Carried by Structure: PINE VALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 139507,  Location: 1 MI N OF CLERMONT (Lat: 34.491808,  Lng: -83.778269),  Route carried "on" structure: County highway 3,  Year Built: 1970,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: EUBANK CREEK,  Facility Carried by Structure: STRINGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 1395074,  Location: .5 MI N OF OAKWOOD (Lat: 34.232997,  Lng: -83.882339),  Route carried "on" structure: County highway 2434,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7,390 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,085 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BALUS CREEK TRIB,  Facility Carried by Structure: OLD OAKWOOD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1395088,  Location: IN OAKWOOD (Lat: 34.257789,  Lng: -83.846578),  Route carried "on" structure: State highway 13,  Year Built: 1998,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 13,690 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,535 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOR SOUTHERN RAILROAD,  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,114,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,670,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 139509,  Location: 3.4 MI S OF FLOWERY BR (Lat: 34.140050,  Lng: -83.950139),  Route carried "on" structure: State highway 347,  Year Built: 2002,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 19,870 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,805 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: FRIENDSHIP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 7,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 34.2m (112.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,976,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $2,964,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395096,  Location: IN OAK WOOD (Lat: 34.225514,  Lng: -83.865644),  Route carried "on" structure: Interstate 985,  Year Built: 2009,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 50,610 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 75,915 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 5,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 50.3m (165.0ft),  Out-to-Out Width: 52.7m (172.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,762,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $2,643,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1395097,  Location: IN OAK WOOD (Lat: 34.227839,  Lng: -83.861400),  Route carried "on" structure: Ramp Interstate 985,  Year Built: 2007,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 6,710 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,065 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RAMP TO 985 NORTH,  Facility Carried by Structure: STATE ROUTE 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 1,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 7 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $307,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1395098,  Location: IN OAK WOOD (Lat: 34.230108,  Lng: -83.858297),  Route carried "on" structure: State highway 13,  Year Built: 2007,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 19,360 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,040 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 5,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,039,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $3,058,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1395113,  Location: 2 MI S OF OAKWOOD (Lat: 34.204667,  Lng: -83.891417),  Route carried "on" structure: Ramp Interstate 985,  Year Built: 2019,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 2,972 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,684 (year 2040),  Design Load: HL 93,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 95.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $11,100,000,  Roadway Improvement Cost: $1,110,000,  Total Project Cost: $16,650,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530001,  Location: 4 MI SW OF ELKO (Lat: 32.301397,  Lng: -83.761186),  Route carried "on" structure: US 41,  Year Built: 1961,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 630 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 945 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 153001,  Location: 6.9 MI SE OF PERRY (Lat: 32.411808,  Lng: -83.636428),  Route carried "on" structure: US 341,  Year Built: 1971,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 4,330 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,495 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,133,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,700,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 153002,  Location: 3.5 MI W OF ELKO (Lat: 32.336703,  Lng: -83.767642),  Route carried "on" structure: State highway 26,  Year Built: 1963,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 1,480 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,220 (year 2032),  Design Load: HS 20,  Features Intersected: I-75@126.87 (EXIT 127)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,360,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 153003,  Location: 6.3 MI NE OF PERRY (Lat: 32.505997,  Lng: -83.643606),  Route carried "on" structure: State highway 127,  Year Built: 1965,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 1530041,  Location: 4 MI SW OF ELKO (Lat: 32.301747,  Lng: -83.761519),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 41,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,625 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 41)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 199.559,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 16 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.84m (45.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,129,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,693,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 153005,  Location: PERRY - WESTSIDE (Lat: 32.463578,  Lng: -83.747733),  Route carried "on" structure: Interstate 75,  Year Built: 1962,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 49,510 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 74,265 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.871,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 32 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 40.7m (133.5ft),  Out-to-Out Width: 42.4m (139.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,217,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,826,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1390055,  Location: IN OAKWOOD (Lat: 34.246258,  Lng: -83.835047),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 43,100 (year 1998),  Truck Traffic: 1%,  Features Intersected: CR 472 ELACHEE ROAD,  Facility Carried by Structure: ELACHEE ROAD
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1390056,  Location: IN OAKWOOD (Lat: 34.215619,  Lng: -83.881069),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 45,600 (year 1998),  Truck Traffic: 1%,  Features Intersected: CR 524 PLAINVIEW ROAD,  Facility Carried by Structure: PLAINVIEW ROAD
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1395096,  Location: IN OAK WOOD (Lat: 34.225514,  Lng: -83.865644),  Route carried "under" structure: State highway 53,  Structure Length: 0. m,  Average Daily Traffic: 32,300 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 419 N (I-985 US23),  Facility Carried by Structure: I-985 NB, SB AND S
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 19.312,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1395097,  Location: IN OAK WOOD (Lat: 34.227839,  Lng: -83.861400),  Route carried "under" structure: Ramp Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 49,800 (year 2006),  Truck Traffic: 1%,  Features Intersected: 985 RAMP NORTH TO SR 13,  Facility Carried by Structure: STATE ROUTE 53
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 25.750,  Lanes on structure: 1,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1395098,  Location: IN OAK WOOD (Lat: 34.230108,  Lng: -83.858297),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 43,100 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR13 ATLANTA HIGHWAY,  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 25.750,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1395098,  Location: IN OAK WOOD (Lat: 34.230108,  Lng: -83.858297),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 43,100 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 13 ATLANTA HIGH WAY,  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 6.42m (21.06ft),  Kilometerpoint: 25.750,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1395098,  Location: IN OAK WOOD (Lat: 34.230108,  Lng: -83.858297),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 43,100 (year 2006),  Truck Traffic: 1%,  Features Intersected: SR13 ATLANTA HIGHWAY,  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 25.750,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Discuss Oakwood, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.