  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 571ft / 174mTotal length
  • $51,698,000Total costs
  • 69,787Total average daily traffic
  • 8,554Total average daily truck traffic
  • 94,998Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Newton
  • No street view available for this location

New bridges in Newton, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 101950-1959
  • 11960-1969
  • 21970-1979
  • 71980-1989
  • 41990-1999
  • 12000-2009
Average Bridge Daily Traffic in Newton, AL
Average Bridge Truck Traffic in Newton, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.8%Excellent
  • 14.3%Very good
  • 38.1%Good
  • 33.3%Satisfactory
  • 9.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.8%Excellent
  • 19.0%Very good
  • 52.4%Good
  • 23.8%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Excellent
  • 14.3%Very good
  • 57.1%Good
  • 23.8%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.4%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 3.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 427,  Location: 2.5 MI SE JCT I 59 (Lat: 34.569264,  Lng: -85.616219),  Route carried "on" structure: State highway 117,  Year Built: 1927,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 4,421 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,189 (year 2039),  Design Load: H 15,  Features Intersected: WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.104,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $359,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 669,  Location: 6.1 MI. E. OF CHATOM (Lat: 31.442850,  Lng: -88.159197),  Route carried "on" structure: State highway 56,  Year Built: 1929,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 1,930 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,465 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.276,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $298,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1877,  Location: .2 MI. NE POP. RIDGE RD(3 (Lat: 34.566661,  Lng: -86.363239),  Route carried "on" structure: County highway 537,  Year Built: 1938,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 825 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,350 (year 2034),  Design Load: H 15,  Features Intersected: POND CREEK,  Facility Carried by Structure: NEW HOPE CED PNT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $231,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4898,  Location: SEC-27 T-5-N R-25-E (Lat: 31.374300,  Lng: -85.522131),  Route carried "on" structure: County highway 59,  Year Built: 1954,  Status: Open,  Structure Length: 11.00m (36.09ft),  Average Daily Traffic: 407 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 605 (year 2034),  Design Load: H 15,  Features Intersected: EAST CHOCTAWHATCHEE R
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.89m (39.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,957,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5487,  Location: SEC-12 T-4-N R-24-E (Lat: 31.339286,  Lng: -85.588347),  Route carried "on" structure: County highway 14,  Year Built: 1956,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 442 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 657 (year 2034),  Design Load: H 15,  Features Intersected: KILLEBREW MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $688,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5488,  Location: SEC-3 T-4-N R-25-E (Lat: 31.354139,  Lng: -85.533850),  Route carried "on" structure: County highway 14,  Year Built: 1956,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 442 (year 2002),  Truck Traffic: 30%,  Average Future Daily Traffic: 657 (year 2034),  Design Load: H 15,  Features Intersected: KELLY CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6327,  Location: SEC-10 T-5-N R-25-E (Lat: 31.422428,  Lng: -85.530806),  Route carried "on" structure: County highway 59,  Year Built: 1958,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,400 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,080 (year 2034),  Design Load: H 15,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $568,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6632,  Location: 4.1 MI. N. SR 134 (Lat: 31.356800,  Lng: -85.558533),  Route carried "on" structure: US 231,  Year Built: 1959,  Status: Open,  Structure Length: 13.14m (43.11ft),  Average Daily Traffic: 8,850 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 11,504 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.251,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.96m (45.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,158,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6633,  Location: 4.1 MI N.SR 134 (Lat: 31.356883,  Lng: -85.558383),  Route carried "on" structure: US 231,  Year Built: 1959,  Status: Open,  Structure Length: 13.14m (43.11ft),  Average Daily Traffic: 8,850 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 11,504 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.251,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.96m (45.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,158,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6634,  Location: 4.4 MI. N. SR. 134 (Lat: 31.360583,  Lng: -85.560672),  Route carried "on" structure: US 231,  Year Built: 1959,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 8,850 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 11,504 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.752,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,102,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,312,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6635,  Location: 4.4 MI. N. AL. 134 (Lat: 31.360667,  Lng: -85.560500),  Route carried "on" structure: US 231,  Year Built: 1959,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 8,850 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 11,504 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.752,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,102,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,312,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 668,  Location: 2.3 MILES EAST OF ROETON (Lat: 31.595825,  Lng: -85.794950),  Route carried "on" structure: County highway 110,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 459 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 550 (year 2040),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $438,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7368,  Location: SEC-35 T-5-N R-25-E (Lat: 31.362453,  Lng: -85.616011),  Route carried "on" structure: County highway 21,  Year Built: 1961,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,473 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,190 (year 2034),  Design Load: H 15,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $978,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,076,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10952,  Location: SEC-28 T-5-N R-25-E (Lat: 31.372911,  Lng: -85.544531),  Route carried "on" structure: County highway 20,  Year Built: 1973,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 465 (year 2000),  Truck Traffic: 7%,  Average Future Daily Traffic: 691 (year 2034),  Design Load: HS 20,  Features Intersected: W CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.19m (36.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,225,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,448,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11857,  Location: TOWN OF NEWTON (Lat: 31.342683,  Lng: -85.610533),  Route carried "on" structure: State highway 123,  Year Built: 1976,  Status: Open,  Structure Length: 17.86m (58.60ft),  Average Daily Traffic: 4,830 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,901 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.637,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.55m (60.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $5,723,000,  Roadway Improvement Cost: $572,000,  Total Project Cost: $6,295,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12596,  Location: SEC-36 T-4-N R-24-E (Lat: 31.282478,  Lng: -85.602486),  Route carried "on" structure: County highway 55,  Year Built: 1981,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 643 (year 1988),  Truck Traffic: 11%,  Average Future Daily Traffic: 700 (year 2034),  Design Load: HS 20,  Features Intersected: MOSSY CAMP BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12929,  Location: SEC-10 T-4-N R-24-E (Lat: 31.328211,  Lng: -85.621656),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 200 (year 1996),  Truck Traffic: 6%,  Average Future Daily Traffic: 255 (year 2034),  Design Load: HS 20,  Features Intersected: WATSON BRANCH,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $564,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $620,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12964,  Location: SEC-30 T-4-N R-25-E (Lat: 31.294578,  Lng: -85.582000),  Route carried "on" structure: County highway 9,  Year Built: 1983,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 491 (year 2000),  Truck Traffic: 20%,  Average Future Daily Traffic: 730 (year 2034),  Design Load: HS 20,  Features Intersected: MOSSY CAMP BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,018,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,120,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13009,  Location: SEC-14 T-4-N R-24-E (Lat: 31.320775,  Lng: -85.609144),  Route carried "on" structure: County highway 31,  Year Built: 1983,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 310 (year 1988),  Truck Traffic: 6%,  Average Future Daily Traffic: 365 (year 2034),  Design Load: HS 20,  Features Intersected: BARR CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13125,  Location: SEC-29 T-5-N R-25-E (Lat: 31.381394,  Lng: -85.558256),  Route carried "on" structure: County highway 18,  Year Built: 1956,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 884 (year 2001),  Truck Traffic: 27%,  Average Future Daily Traffic: 1,310 (year 2034),  Design Load: HS 20,  Features Intersected: BAGWELL CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13635,  Location: JCT. DALE COUNTY # 18 (Lat: 31.410900,  Lng: -85.535500),  Route carried "on" structure: State highway 27,  Year Built: 1985,  Status: Open,  Structure Length: 18.96m (62.20ft),  Average Daily Traffic: 1,280 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,858 (year 2033),  Design Load: HS 20,  Features Intersected: W. CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.58m (64.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,638,000,  Roadway Improvement Cost: $564,000,  Total Project Cost: $6,202,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13636,  Location: 0.3 MI.E. DALE #18 (Lat: 31.413583,  Lng: -85.530983),  Route carried "on" structure: State highway 27,  Year Built: 1985,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 1,280 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,858 (year 2033),  Design Load: HS 20,  Features Intersected: W. CHOCTAWHATCHEE RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.500,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,099,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13969,  Location: SEC-15 T-5-N R-25-E (Lat: 31.414781,  Lng: -85.525794),  Route carried "on" structure: County highway 59,  Year Built: 1986,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 407 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 605 (year 2034),  Design Load: HS 20,  Features Intersected: MIDDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $580,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16226,  Location: SEC 28 T5N R25E (Lat: 31.374414,  Lng: -85.554144),  Route carried "on" structure: County highway 20,  Year Built: 1995,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 465 (year 2000),  Truck Traffic: 9%,  Average Future Daily Traffic: 691 (year 2034),  Design Load: HS 20,  Features Intersected: BAGWELL'S CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $564,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $620,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16296,  Location: 0.2 MI W JCT 123 (Lat: 31.347981,  Lng: -85.614364),  Route carried "on" structure: State highway 134,  Year Built: 1995,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 4,400 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,336 (year 2033),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.061,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,743,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $3,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16297,  Location: 0.9 MI W JCT 123 (Lat: 31.342850,  Lng: -85.624667),  Route carried "on" structure: State highway 134,  Year Built: 1995,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 4,400 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,336 (year 2033),  Design Load: HS 20,  Features Intersected: GIN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.939,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,604,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,764,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17498,  Location: 2 MI N.JCT US 84 (Lat: 31.273697,  Lng: -85.620247),  Route carried "on" structure: State highway 123,  Year Built: 2001,  Status: Open,  Structure Length: 18.00m (59.06ft),  Average Daily Traffic: 2,460 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,515 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE CHOCTAWHATCHEE RV
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 24.277,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.0m (98.4ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.68m (61.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $5,379,000,  Roadway Improvement Cost: $538,000,  Total Project Cost: $5,917,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18974,  Location: 84 WEST TO 84 WEST (Lat: 31.258264,  Lng: -85.597678),  Route carried "on" structure: County highway 7,  Year Built: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 73 (year 1979),  Average Future Daily Traffic: 88 (year 2033),  Design Load: HS 20,  Features Intersected: HOLLAND CREEK,  Facility Carried by Structure: HOLLAND RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $350,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous