Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kingvale, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 135ft / 41.0mTotal length
  • $3,285,000Total costs
  • 108,350Total average daily traffic
  • 10,807Total average daily truck traffic
  • 160,872Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kingvale
  • No street view available for this location

New bridges in Kingvale, CA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 61950-1959
  • 21960-1969
Average Bridge Daily Traffic in Kingvale, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Good
  • 30.0%Fair
  • 50.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Good
  • 10.0%Satisfactory
  • 50.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 40.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 19 0105L,  Location: 03-PLA-080-67.87 (Lat: 39.313747,  Lng: -120.470378),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOUTH YUBA RI & S YUBA D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.870,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,006,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $1,690,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19 0105R,  Location: 03-PLA-080-67.87 (Lat: 39.313419,  Lng: -120.470650),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOUTH YUBA RI & S YUBA D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.870,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.6m (44.6ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19 0106L,  Location: 03-PLA-080-68.55 (Lat: 39.315369,  Lng: -120.458131),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TROY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.550,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19 0106R,  Location: 03-PLA-080-68.55 (Lat: 39.314725,  Lng: -120.458278),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TROY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.550,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $739,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19 0107L,  Location: 03-PLA-080-69.23 (Lat: 39.314361,  Lng: -120.445725),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: KINGVALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.230,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19 0107R,  Location: 03-PLA-080-69.23 (Lat: 39.314022,  Lng: -120.445614),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: KINGVALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.230,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $856,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19 0123L,  Location: 03-PLA-080-R66.33 (Lat: 39.311950,  Lng: -120.499200),  Route carried "on" structure: Interstate 80,  Year Built: 1964,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20,  Features Intersected: HAMPSHIRE ROCKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.330,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 19 0123R,  Location: 03-PLA-080-R66.33 (Lat: 39.311619,  Lng: -120.499472),  Route carried "on" structure: Interstate 80,  Year Built: 1964,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 13,500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20,  Features Intersected: HAMPSHIRE ROCKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.330,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19C0025,  Location: NORTH OF YUBA DRIVE (Lat: 39.315953,  Lng: -120.464683),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 250 (year 1978),  Truck Traffic: 2%,  Average Future Daily Traffic: 600 (year 2041),  Design Load: H 15,  Features Intersected: SOUTH YUBA RIVER,  Facility Carried by Structure: DONNER PASS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.4m (37.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C0042,  Location: 2.3 MI E OF CISCO (Lat: 39.310250,  Lng: -120.508736),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 100 (year 1978),  Truck Traffic: 2%,  Average Future Daily Traffic: 272 (year 2041),  Design Load: H 15,  Features Intersected: SOUTH YUBA RIVER,  Facility Carried by Structure: HAMPSHIRE ROCKS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Kingvale, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.