Bridge Statistics for Hornby, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 36ft / 10.7mTotal length
  • $6,271,000Total costs
  • 18,475Total average daily traffic
  • 1,803Total average daily truck traffic
  • 18,803Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hornby
  • No street view available for this location

New bridges in Hornby, NY - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 21960-1969
  • 21990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Hornby, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Excellent
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Excellent
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Excellent
  • 16.7%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Good
  • 54.5%Fair
  • 9.1%Poor
  • 9.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Excellent
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: 104798,  Location: 2.7 MILES NE OF CORNING (Lat: 42.189825,  Lng: -77.018878),  Route carried "on" structure: State highway 414,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,403 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,430 (year 2040),  Design Load: HS 20,  Features Intersected: KERICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.661,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $502,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104799,  Location: 3.5 MILES NE OF CORNING (Lat: 42.197697,  Lng: -77.007144),  Route carried "on" structure: State highway 414,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,403 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,430 (year 2040),  Design Load: HS 20,  Features Intersected: WILSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $612,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1048,  Location: 4.7 MILES NE OF CORNING (Lat: 42.206781,  Lng: -76.989283),  Route carried "on" structure: State highway 414,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,403 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,430 (year 2040),  Design Load: HS 20,  Features Intersected: LILY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.783,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $595,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104801,  Location: 6.3 MILES NE OF CORNING (Lat: 42.224603,  Lng: -76.969350),  Route carried "on" structure: State highway 414,  Year Built: 1964,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,403 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,430 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.373,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $667,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221712,  Location: 1.9 MILES WEST OF HORNBY (Lat: 42.245853,  Lng: -77.081872),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 74 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 104 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: DRY RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.464,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $497,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221713,  Location: 2.1 MILE WEST OF HORNBY (Lat: 42.247158,  Lng: -77.084428),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 4 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: HARRISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $474,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221714,  Location: 2 MI NE OF FERENBAUGH (Lat: 42.214989,  Lng: -76.976294),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Posted for load-capacity,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 215 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 301 (year 2038),  Features Intersected: POST CREEK,  Facility Carried by Structure: TOWNLEY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Serious,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $525,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221715,  Location: 7.5 MILES NE OF CORNING (Lat: 42.232069,  Lng: -76.977483),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 99 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 139 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BUCK HOLLOW CREEK,  Facility Carried by Structure: BUCK HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $258,000,  Total Project Cost: $698,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22693,  Location: 3.2 MILES NE OF CORNING (Lat: 42.200700,  Lng: -77.018017),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 49 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 69 (year 2036),  Design Load: HS 20,  Features Intersected: MORMON HOLLOW CRK,  Facility Carried by Structure: MORMON HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $462,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333367,  Location: IN HORNBY (Lat: 42.243814,  Lng: -77.043261),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 352 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 367 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: COUNTY ROAD 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.780,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $720,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 337144,  Location: 3.5 MI NE JCT 414 & 17 (Lat: 42.198528,  Lng: -77.008653),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 71 (year 2020),  Average Future Daily Traffic: 99 (year 2040),  Features Intersected: WILSON HOLLOW CREEK,  Facility Carried by Structure: WILSON HOLLOW ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $327,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $519,000 ( Estimate for 2021)
Discuss Hornby, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.