Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Horn Hill, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 164ft / 50.4mTotal length
  • $12,864,000Total costs
  • 3,456Total average daily traffic
  • 203Total average daily truck traffic
  • 4,663Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Horn Hill
  • No street view available for this location

New bridges in Horn Hill, AL - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 11950-1959
  • 41960-1969
  • 11970-1979
  • 11990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Horn Hill, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
  • 01980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Truck Traffic in Horn Hill, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 23.1%Excellent
  • 15.4%Very good
  • 15.4%Good
  • 30.8%Satisfactory
  • 7.7%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Excellent
  • 7.7%Very good
  • 30.8%Good
  • 15.4%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Very good
  • 15.4%Good
  • 15.4%Satisfactory
  • 15.4%Fair
  • 15.4%Poor
  • 7.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 40.0%Good
  • 20.0%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 7036,  Location: 2 MI WEST OF HORN HILL (Lat: 31.236050,  Lng: -86.347386),  Route carried "on" structure: County highway 45,  Year Built: 1960,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 480 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 602 (year 2030),  Design Load: H 15,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $380,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8039,  Location: BETWEEN HWY331* HORN HILL (Lat: 31.234822,  Lng: -86.311756),  Route carried "on" structure: County highway 47,  Year Built: 1963,  Status: Posted for load,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 350 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 430 (year 2030),  Design Load: H 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.76m (12.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8054,  Location: 2 MI. S. 0F BLUE SPRINGS (Lat: 31.184731,  Lng: -86.335208),  Route carried "on" structure: County highway 85,  Year Built: 1963,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 270 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 344 (year 2030),  Design Load: H 15,  Features Intersected: MULBERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $462,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10455,  Location: EAST OF HOLLOWAY BRIDGE (Lat: 31.190025,  Lng: -86.354258),  Route carried "on" structure: County highway 32,  Year Built: 1948,  Year Reconstructed: 1971,  Status: Posted for load,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 110 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 143 (year 2030),  Design Load: H 15,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: COUNTY DIRT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $718,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11683,  Location: 1 MI WEST OF HORN HILL (Lat: 31.237869,  Lng: -86.329131),  Route carried "on" structure: County highway 79,  Year Built: 1976,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 250 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 316 (year 2030),  Design Load: H 15,  Features Intersected: YELLOW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $496,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11733,  Location: CATALINA BR (Lat: 31.240258,  Lng: -86.337850),  Route carried "on" structure: County highway 79,  Year Built: 1939,  Year Reconstructed: 1977,  Status: Posted for load,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 250 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 316 (year 2030),  Design Load: H 15,  Features Intersected: YELLOW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 12.45m (40.85ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $2,305,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,536,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12479,  Location: 2 MI SOUTH OF HORN HILL (Lat: 31.212886,  Lng: -86.340350),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1981,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 80 (year 1994),  Average Future Daily Traffic: 115 (year 2030),  Design Load: H 15,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: COUNTY DIRT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16084,  Location: .5 MI E OF HOLLOWAY BRIDG (Lat: 31.190322,  Lng: -86.345564),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 60 (year 1994),  Average Future Daily Traffic: 86 (year 2030),  Design Load: HS 20,  Features Intersected: NO NAME BRANCH,  Facility Carried by Structure: COUNTY DIRT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17234,  Location: 8 MI N. RED OAK CHURCH (Lat: 31.205633,  Lng: -86.370378),  Route carried "on" structure: County highway 45,  Year Built: 1960,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 290 (year 1994),  Truck Traffic: 6%,  Average Future Daily Traffic: 375 (year 2028),  Design Load: HS 20,  Features Intersected: NO NAME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18291,  Location: EAST OF CO RD 45 (Lat: 31.190850,  Lng: -86.360944),  Route carried "on" structure: County highway 32,  Year Built: 2001,  Status: Open,  Structure Length: 14.63m (48.00ft),  Average Daily Traffic: 110 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 125 (year 2033),  Design Load: HS 20,  Features Intersected: YELLOW RIVER,  Facility Carried by Structure: COUNTY DIRTROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.41m (50.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,171,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $3,488,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18489,  Location: 1 MILE S OF HORN HILL (Lat: 31.225808,  Lng: -86.322083),  Route carried "on" structure: County highway 97,  Year Built: 2002,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 450 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 755 (year 2034),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $806,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18772,  Location: 1/4MILE SOUTH OF CR47 (Lat: 31.231933,  Lng: -86.307953),  Route carried "on" structure: County highway 99,  Year Built: 2003,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 200 (year 2002),  Truck Traffic: 21%,  Average Future Daily Traffic: 338 (year 2035),  Design Load: HS 20,  Features Intersected: ADAMS POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19663,  Location: 3.5 MILES S.W. OF OPP (Lat: 31.212964,  Lng: -86.333461),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 36 (year 2012),  Average Future Daily Traffic: 53 (year 2034),  Design Load: HS 20,  Features Intersected: NO NAMED CREEK,  Facility Carried by Structure: HENDERSON BRDG RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20971,  Location: 6 MI NE RED OAK CH. (Lat: 31.195333,  Lng: -86.374864),  Route carried "on" structure: County highway 45,  Year Built: 2013,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 290 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 373 (year 2034),  Design Load: HS 20,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $428,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21426,  Location: 2 Mile South of Babbie (Lat: 31.245436,  Lng: -86.355233),  Route carried "on" structure: County highway ,  Year Built: 1933,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 230 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 292 (year 2030),  Design Load: HS 20,  Features Intersected: Taylor Mill Creek,  Facility Carried by Structure: County Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $601,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Horn Hill, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.