Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Holiday City, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 171ft / 51.9mTotal length
  • 191,188Total average daily traffic
  • 57,413Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Holiday City
  • No street view available for this location

New bridges in Holiday City, OH - historical statistics
  • New bridges - historical statistics
  • 181950-1959
  • 11970-1979
Reconstructed bridges in Holiday City, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51980-1989
  • 41990-1999
Average Bridge Daily Traffic in Holiday City, OH
Average Bridge Truck Traffic in Holiday City, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 90.0%Good
  • 10.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 60.0%Good
  • 40.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 80.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 8601232,  Location: 0.2MI WEST OF EXIT 13 (Lat: 41.612881,  Lng: -84.555039),  Route carried "on" structure: US 20A,  Year Built: 1954,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 6,967 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,670 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: TPK RAMP U SR15 20A
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 4.780,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629552,  Location: 1.8MI WEST OF EXIT 13 (Lat: 41.616639,  Lng: -84.583839),  Route carried "on" structure: County highway C0134,  Year Built: 1954,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 16,000 (year 2018),  Truck Traffic: 38%,  Average Future Daily Traffic: 29,712 (year 2038),  Design Load: H 10,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: CUMMINS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.918,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8629579,  Location: 1.3MI WEST OF EXIT 13 (Lat: 41.615819,  Lng: -84.574300),  Route carried "on" structure: County highway C0025,  Year Built: 1954,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 16,000 (year 2012),  Truck Traffic: 38%,  Average Future Daily Traffic: 13,283 (year 2032),  Design Load: H 10,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: TOWNSHIP LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.918,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629595,  Location: 0.2MI WEST OF EXIT 13 (Lat: 41.614181,  Lng: -84.554489),  Route carried "on" structure: US 20A,  Year Built: 1954,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 7,090 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 29,712 (year 2038),  Design Load: H 20,  Features Intersected: I80 OHIO TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.603,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629617,  Location: AT EXIT 13 (Lat: 41.613731,  Lng: -84.549189),  Route carried "on" structure: Ramp Interstate 80K,  Year Built: 1954,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 488 (year 2018),  Truck Traffic: 38%,  Average Future Daily Traffic: 30,175 (year 2038),  Design Load: HS 20,  Features Intersected: I80 OH TPK,  Facility Carried by Structure: I80 OH TPK RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.613,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629633,  Location: 0.7MI EAST OF EXIT 13 (Lat: 41.612419,  Lng: -84.536581),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 11,038 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 15,321 (year 2038),  Design Load: HS 20,  Features Intersected: ST JOSEPH BEAVER RD,  Facility Carried by Structure: I80 OH TPK EB
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 22.676,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629641,  Location: 0.7MI WEST OF EXIT 13 (Lat: 41.612650,  Lng: -84.536581),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 11,038 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 15,321 (year 2038),  Design Load: HS 20,  Features Intersected: ST JOSEPH BEAVER RD,  Facility Carried by Structure: I80 OH TPK WB
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 22.676,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629676,  Location: 0.8MI WEST OF EXIT 13 (Lat: 41.612231,  Lng: -84.535231),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 11,038 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 15,321 (year 2038),  Design Load: HS 20,  Features Intersected: NS CORP RR,  Facility Carried by Structure: I80 OH TPK EB
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 22.804,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629684,  Location: 0.8MI WEST OF EXIT 13 (Lat: 41.612411,  Lng: -84.534911),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 11,038 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 15,321 (year 2038),  Design Load: HS 20,  Features Intersected: NS CORP RR,  Facility Carried by Structure: I80 OH TPK WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.804,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8629706,  Location: 1.7MI WEST OF EXIT 13 (Lat: 41.609389,  Lng: -84.516981),  Route carried "on" structure: County highway C0049,  Year Built: 1954,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 16,000 (year 2012),  Truck Traffic: 38%,  Average Future Daily Traffic: 13,505 (year 2032),  Design Load: HS 20,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: PLEASANT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.918,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8631727,  Location: 12410 RD17 (Lat: 41.592311,  Lng: -84.497061),  Route carried "on" structure: County highway C0013,  Year Built: 1973,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 479 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 665 (year 2035),  Design Load: HS 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: CR 13 (17)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 8601232,  Location: 0.2MI WEST OF EXIT 13 (Lat: 41.612881,  Lng: -84.555039),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Features Intersected: SR-20A & SR-15,  Facility Carried by Structure: SR 15/USR 20A
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 21.179,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 8629552,  Location: 1.8MI WEST OF EXIT 13 (Lat: 41.616639,  Lng: -84.583839),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 21,406 (year 2015),  Truck Traffic: 45%,  Features Intersected: CUMMINS RD MP0116,  Facility Carried by Structure: CUMMINS RD
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 18.717,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 8629579,  Location: 1.3MI WEST OF EXIT 13 (Lat: 41.615819,  Lng: -84.574300),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 9,570 (year 1972),  Features Intersected: TOWNSHIP LINE RD MP0121,  Facility Carried by Structure: TOWNSHIP LINE RD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 19.505,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 8629595,  Location: 0.2MI WEST OF EXIT 13 (Lat: 41.614181,  Lng: -84.554489),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 21,406 (year 2015),  Truck Traffic: 45%,  Features Intersected: SR15 US20A MP0132,  Facility Carried by Structure: SR15/USR 20A
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 21.179,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 8629617,  Location: AT EXIT 13 (Lat: 41.613731,  Lng: -84.549189),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 21,740 (year 2015),  Truck Traffic: 27%,  Features Intersected: RAMP OVER OHIO TPK MP013,  Facility Carried by Structure: I80 TPK
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 21.613,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 8629633,  Location: 0.7MI EAST OF EXIT 13 (Lat: 41.612419,  Lng: -84.536581),  Route carried "under" structure: County highway 53,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 1960),  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: ST JOSEPH BEAVER R
Minimum Vertical Clearance: 7.49m (24.57ft),  Kilometerpoint: 160.918,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 8629641,  Location: 0.7MI WEST OF EXIT 13 (Lat: 41.612650,  Lng: -84.536581),  Route carried "under" structure: County highway 53,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 1960),  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: ST JOSEPH BEAVER R
Minimum Vertical Clearance: 7.49m (24.57ft),  Kilometerpoint: 160.918,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 8629706,  Location: 1.7MI WEST OF EXIT 13 (Lat: 41.609389,  Lng: -84.516981),  Route carried "under" structure: Interstate 80K,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 9,730 (year 1972),  Features Intersected: PLEASANT HILL RD,  Facility Carried by Structure: I80 OH TPK
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 24.349,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Discuss Holiday City, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.